SUB-CONTRACTS
Prime contractors must ensure the security of
all CLASSIFIED / PROTECTED information and assets placed with subcontractors.
Contractors shall subcontract work to only those companies holding
a valid current
or of the type
and at the level appropriate to the work to be performed under the contract.
Canadian and International Industrial Security Directorate
(CIISD) approval of the subcontractor's security status must be obtained
before award of the subcontract.
Contractors, ensuring the security of information
and assets placed with subcontractors, shall issue as part of the subcontract
either a copy of the and any additional security guidance that forms part of the
prime contract, or a new and any additional
security guidance appropriate to the work covered by the subcontract.
Contractors shall not award a CLASSIFIED / PROTECTED subcontract
to organizations located outside Canada without the PRIOR written approval
of CIISD'S (PWGSC) contracting authority. The security status of foreign
organizations must be verified through CIISD before entering into any
commercial commitments. In addition, any transfer of CLASSIFIED / PROTECTED
information to a foreign country must be channeled through CIISD.
|