![]() |
These documents are the final versions of occurrence investigation reports as approved by the Transportation Safety Board. The TSB assumes no responsibility for any discrepancies that may have been transmitted with the electronic versions. The printed versions of the documents stand as the official record. 2002 Pipeline Investigation Reports14 April 2002 — Natural Gas Pipeline Rupture TransCanada PipeLines
Line 100-3, 914-Millimetre-Diameter Line Main-Line Valve 31-3 + 5.539 Kilometres
Near the Village of Brookdale, Manitoba
|
http://www.tsb.gc.ca/en/reports/pipe/2002/index.asp