Measurement Canada  Canada wordmark
Skip first menu (access key: 1) Menu (access key: M)
 Français  Contact Us  Help  Search  Canada Site
Home  Site Map  What's New  About Us  Registration
Go to the 
Strategis home page Measurement Canada Services
What's New
Services
Contact Us
On-Line Subscription
Comments, Questions and/or Suggestions
Notice of Approval Database
List of Accredited Service Providers
Contractors' Registry
Gravity Tolerance Application
Pseudo-Random Sampling Application
Inspection Services
Calibration Service
List of Manufacturers
Service Standards
Service Feedback Form
Commodities
Publications
Complaints and Disputes
Forms
Legislation
Related Links
Authorized Service Providers
Mass
Approvals
Electricity
Natural Gas
Consumer Page
Volume
Sector Review
CFTM
About Measurement Canada
Site Map
Marketplace Monitoring
Information for Job Seekers

  Measurement Canada
 Services   CFTM   Approvals   Electricity   Volume
 Sector Review   Authorized Service
 Providers
  Consumer Page   Natural Gas   Mass

Gen-23 Conditional Permission with Respect to Electricity and Gas Metering Installations


PDF Format, 9 KB

Date: 1999-09-20
Bulletin: GEN-23-E
Reference Document: GEN-24
Supersedes: CEG-91-02 dated 1991-06-10

1.0 Purpose

1.1 The purpose of this bulletin is to set out Measurement Canada's policy with respect to the putting into service of electricity and gas metering installations.

2.0 Authority

2.1 This conditional permission is granted under the authority of subsection 9(2) of the Electricity and Gas Inspection Act.

3.0 Definition

3.1 A metering installation is an assembly of two or more meters, measuring devices, or other apparatus which are installed at the same location and function collectively for the purpose of making measurements of, or obtaining the basis of a charge for, electricity or gas supplied to a purchaser, and includes any other equipment, wiring, piping, or other apparatus necessary to assemble the measuring devices into a functioning unit.

4.0 Conditional Permission

4.1 Subject to clause 4.2, an electricity or gas metering installation may be put into service without verification and sealing on a temporary basis subject to the following conditions:

(a) the metering installation shall be verified and sealed after a period of being in service, at which time this temporary permission will cease to be effective for the metering installation so verified and sealed;

(b) the meters, wiring, piping, or other apparatus used by the contractor for the measurement or conveyance of electricity or gas shall be handled and installed by qualified personnel in accordance with suitable, documented procedures which ensure correct installation; and

(c) the individual meters and measuring devices which comprise the metering installation shall comply with all requirements of the Electricity and Gas Inspection Act and Regulations.

4.2 The permission in clause 4.1 shall not apply to any individual metering installation or class of metering installations for which the President has issued instructions requiring verification and sealing to be performed prior to putting them into service.

5.0 Additional Information

5.1 This bulletin supersedes Legal Metrology Branch bulletin CEG-91-02 dated 1991-06-10.

5.2 For additional information regarding this bulletin, please contact the Senior Program Officer responsible for either the electricity or gas measurement.


Alan E. Johnston
President


    Created: 2003-07-08
Updated: 2005-01-25
Top of Page
Top of Page
Top of Page
Important Notices