National Energy Board - Coat of Arms - Canada Wordmark
Skip Common Menu Skip Institutional Menu SkipSidebarMenu   Français Contact Us Help Search Canada Site
  What's New About Us Publications Energy Safety &
Environment
  Newsroom Links Statistics North/Offshore
A respected leader in safety, environmental and economic regulation.
  Regulatory Documents Acts and Regulations Hearings Link to Hearings and On-line Broadcasts
  Submit a Document Public Registries Home
Careers
Mackenzie Gas Project
Proactive Disclosure
 Travel and Hospitality
 Contracts
 Grants and Contributions
Engaging Canadians
Consultation with Aboriginal Peoples
Smart Regulation
EMA
Energy Futures Report
Energy Pricing
FAQ
Change your contact information
Adobe Acrobat - Download and Help

Georgia Strait Crossing
Pipeline Limited

GSX Canada Pipeline Project
(formerly Georgia Strait Crossing
Pipeline Project)

Projet de gazoduc GSX Canada Pipeline
(précédemment Projet de franchissement
du détroit de Georgia)

Public Registry
Registre public

* Last update: week of 28 November 2003
The latest updates are marked with an asterisk.
* Dernière mise à jour : semaine du 28 novembre 2003
Les plus récentes mises à jour portent un astérisque.

OFFICIAL LANGUAGES: The National Energy Board is bound by the Official Languages Act and relevant Treasury Board policies. However, some material on these pages originates with organizations not subject to the Official Languages Act and is made available on this site in the language in which it was written. LANGUES OFFICIELLES : L'Office national de l'énergie est lié par la Loi sur les langues officielles et les politiques pertinentes du Conseil du Trésor. Certains documents lui sont soumis par des organisations qui ne sont pas assujetties à cette loi; ils sont donc reproduits sur notre site dans leur version originale.
For assistance with the documents listed below or to obtain a paper copy, please contact publications@neb-one.gc.ca. Pour toute assistance au sujet des documents ci-dessous, ou pour obtenir un exemplaire papier, veuillez communiquer avec publications@neb-one.gc.ca.

Access documents from:

Consultez les documents de :

January 2002 Public Consultation Sessions Transcripts

Transcriptions des consultations publiques en janvier 2002

Vancouver: 11 January/janvier 2002 [Document A0C8R2]
Sidney: 12 January/janvier 2002 [Document A0C8R3]
Sidney: 12 January/janvier 2002 [Document A0C8R4]
Duncan: 14 January/janvier 2002 [Document A0C8R5]
Duncan: 14 January/janvier 2002 [Document A0C8R6]
Duncan: 14 January/janvier 2002 [Document A0C8R7]
Duncan: 15 January/janvier 2002 [Document A0C8R8]
Spring Island: 16 January/janvier 2002 [Document A0C8R9]
Victoria: 17 January/janvier 2002 [Document A0C8S0]
Saturna Island: 18 January/janvier 2002 [Document A0C8S1]
Pender Island: 19 January/janvier 2002 [Document A0C8S2]

April 2002 Oral Argument on Motion Transcripts

Transcriptions de plaidoirie orale relative à une motion en avril 2002

Volume 1 - 9 April/avril 2002 [Document A0D6J7]
Volume 2 - 10 April/avril 2002 [Document A0D6W6]

Hearing Transcripts

Transcriptions d'audience

Volume 1 - 24 February/février 2002 [Document A0H4W7]
Volume 2 - 25 February/février 2002 [Document A0H4Z2]
Volume 2 - 25 February/février 2002
(Evening Session/Séance du soir) [Document A0H5A2
Volume 3 - 26 February/février 2002 [Document A0H5A9]
Volume 4 - 27 February/février 2003 [Document A0H5H7]
Volume 5 - 28 February/février 2003 [Document A0H5H7]
Volume 6 - 3 March/mars 2003 [Document A0H5R0]
Volume 7 - 4 March/mars 2003 [Document A0H5U0]
Volume 8 - 5 March/mars 2003 [Document A0H5W4]
Volume 9 - 6 March/mars 2003 [Document A0H6A0]
Volume 10 - 7 March/mars 2003 [Document A0H6E2B]
Volume 11 - 10 March/mars 2003
(Day Session/Séance du jour) [Document A0H6K5]
Volume 11 - 10 March/mars 2003
(Evening Session/Séance du soir) [Document A0H6S8]
Volume 12 - 11 March 2003 [Document A0H6U9]
Volume 13 - 12 March 2003 [Document A0H7F4]
Volume 14 - 13 March 2003 [Document A0H7I3]
Volume 15 - 17 March 2003
(Day Session/Séance du jour) [Document A0H8F3]
Volume 15 - 17 March 2003
(Evening Session/Séance du soir) [Document A0H8I2]
Volume 16 - 18 March 2003 [Document A0H8Q2]
Volume 17 - 19 March 2003 [Document A0H8T7]

Reasons for Decision

Motifs de décision

Reasons for Decision GH-4-2001 [Document A0J4L8]
Motifs de décision GH-4-2001 [Document A0J4L9]

Georgia Strait Crossing Pipeline Limited (GSX PL)

20 June 2003: Letter to JRP - Book of Authorities in regard to GSXCCC Notice of Motion.

18 June 2003: Letter to JRP - Intention to appear and make submissions in opposition to GSXCCC Notice of Motion.

25 March 2003: Letter to JRP - Apology to Mr. Hugo for mischaracterization of discussions with Mr. Ruflin.

17 March 2003: Hearing Submission to JRP - Clarification of B-141 Undertaking.

17 March 2003: Hearing Submission to JRP - Terrestrial Environmental Protection and Reclamation Plan for GSX Project - Vancouver Island Pipeline Landowner Association Commitments Rev. 2.0.

17 March 2003: Hearing Submission to JRP - GSX PL Project Commitments (Revised and Updated).

17 March 2003: Hearing Submission to JRP - Undertaking given at Paragraphs 22928 and 22930.

17 March 2003: Hearing Submission to JRP - Undertaking by Mr. R. McDougall - Paragraph 22938.

17 March 2003: Hearing Submission to JRP - Undertaking by Keith Robinson - Paragraph 19299.

13 March 2003: Hearing Submission to JRP - Undertaking by Mr. R. Glaholt - Paragraph 18589.

13 March 2003: Hearing Submission to JRP - Undertaking for GSX Panel No. 7 - Paragraphs 20006 and 20136.

13 March 2003: Hearing Submission to JRP - Undertakings given by Mr. Exley - Paragraphs 20753 and 20775.

13 March 2003: Hearing Submission to JRP - Clarification of Exhibit B-141 Undertaking.

13 March 2003: Hearing Submission to JRP - Comments on proposed draft conditions set out in 03-03-07 letter from JRP.

13 March 2003: Hearing Submission to JRP - Undertaking given by Mr. J. Duffy - Paragraph 13612.

13 March 2003: Hearing Submission to JRP - Undertaking by Mr. Glaholt Volume 11 - 03-03-10 Paragraph 18760.

12 March 2003: Hearing Submission to JRP - Undertakings by Messrs. Smyrl and Elton to provide calculations for new mainland transmission.

12 March 2003: Hearing Submission to JRP - Undertaking by Mr. Elton to provide a calculation of the levelized electricity cost for each option in CAC 1.6.

12 March 2003: Hearing Submission to JRP - Undertaking by Messrs. Smyrl and Elton to provide calculations for transmission alternative.

12 March 2003: Hearing Submission to JRP - Affidavit of Mr. Robert Humphries.

12 March 2003: Hearing Submission to JRP - Undertakings of Mr. Glaholt to provide American protocol that GSX will rely upon.

12 March 2003: Hearing Submission to JRP - Schedule A Environmental Measures.

12 March 2003: Hearing Submission to JRP - Undertakings of Mr. Elton to provide short-term marginal cost to BC Hydro on the mainland.

11 March 2003: Hearing Submission to JRP - GSX Operating Company Williams Project Structure.

11 March 2003: Hearing Submission to JRP - Undertakings Volume 9, Paragraphs 15693 and 15743.

11 March 2003: Hearing Submission to JRP - Precedent Agreement Amendment for Firm Transportation of Natural Gas GSX Canada Limited Partnership.

11 March 2003: Hearing Submission to JRP - Written Evidence of John Marko.

11 March 2003: Hearing Submission to JRP - Letters to BC Hydro from Province of BC Energy & Mines and Deputy Minister of Employment & Investment.

11 March 2003: Hearing Submission to JRP - Written Evidence of Paul Kiteck.

10 March 2003: Hearing Submission to JRP - Undertakings - Transcript Volume 6, paragraph 12589.

10 March 2003: Hearing Submission to JRP - Vancouver Island Historical Coincident Peak (MV).

7 March 2003: Hearing Submission to JRP - Vancouver Island Operations and Maintenance Letter of Understanding.

7 March 2003: Hearing Submission to JRP - Schematics outlining various standard soil handling methodologies.

10 March 2003: Hearing Submission to JRP - Undertakings Volume 8.

10 March 2003: Hearing Submission to JRP - GSX PL Environmental management system.

10 March 2003: Hearing Submission to JRP - Response to IR No. 37.

4 March 2003: Hearing Submission to JRP - Number of BC Hydro residential, commercial and industrial accounts on Vancouver Island.

4 March 2003: Hearing Submission to JRP - Written evidence of Allan Dakin.

4 March 2003: Hearing Submission to JRP - Cost estimate if proposed conditions were imposed.

4 March 2003: Hearing Submission to JRP - Undertakings.

3 March 2003: Hearing Submission to JRP - GSX delivery pressure at interconnection with Centra System.

3 March 2003: Hearing Submission from GSX PL to JRP - GSX Capital Cost Estimate.

28 February 2003: Hearing Submission to JRP - Mr. Moghadan's undertaking.

28 February 2003: Letter to JRP - Proposed draft conditions.

27 February 2003: Hearing Submission to JRP - Two EnCana News Releases.

26 February 2003: Letter to JRP - Response to IR No. 36.

26 February 2003: Hearing Submission - GSX Witness Panel List Issue.

24 February 2003: Hearing Submission to JRP - Revised written evidence of Bohdan (Dan) Herbenyk.

24 February 2003: Hearing Submission - Revision to 15.12 Attachment C - Singleton Report Table E-01A dated 19 February 2003.

24 February 2003: Hearing Submission - TERA Environmental Consultants Report.

24 February 2003: Hearing Submission - ASL Environmental Sciences Report.

24 February 2003: Letter to JRP - Easement Agreement and Letter of Understanding with VIPLA.

20 February 2003: Letter to JRP - Valerie Lambert replacing Chris O'Riley on 1st GSX witness panel.

18 February 2003: Letter to JRP - Identification of Evidence that will be addressed with each Panel.

14 February 2003: Letter to JRP - Revision to Table 8.1 and Appendix 9-D in Volume II of application.

14 February 2003: Letter to JRP - Cowichan Tribe Tradition Use submission under Section 16.1.

13 February 2003: Letter to JRP - Additional Written Evidence updating Volume III (Public Information Program).

13 February 2003: Letter to JRP - Jaccard/Murphy report is not relevant to consideration of application.

12 February 2003: Letter to JRP - Reply Evidence on Gas Supply for GSXCCC.

11 February 2003: Letter to JRP - Mr. Hugo's cross-examination of consultants.

11 February 2003: Letter to JRP - Direct Evidence of GSX PL witnesses.

10 February 2003: Letter to JRP - Response to IR No. 35.

6 February 2003: Letter to JRP - Response to IR No. 33.

6 February 2003: Letter to JRP - Response to IR No. 32.

3 February 2003: Letter to JRP - Listing of GSX PL witness panels and the witnesses on each panel.

31 January 2003: Letter to JRP - Draft Manuals.

31 January 2003: Letter to JRP - Response to IRs No. 13.5 and No. 13.6.

29 January 2003: Letter to JRP - Reply to recent intervenor submissions respecting readiness to proceed to hearing.

27 January 2003: Letter to JRP - Response to IR No. 9.6 (c) The Honegger Review Report.

27 January 2003: Letter to JRP - Response to IR No. 28.4(a).

21 January 2003: Letter to JRP - Response to IR No. 28.

21 January 2003: Letter to JRP - Large size Terrestrial Environmental Alignment Sheets.

21 January 2003: Letter to JRP - Comments on various news stories and readiness of application for hearing.

20 January 2003: Letter to JRP - Supplemental Response to IR No. 2.3(f).

20 January 2003: Letter to JRP - Notice of Motion regarding permission for GSX PL to file Cowichan Tribe's Traditional Use information in confidence.

17 January 2003: Letter to JRP - Volumes IV and V Supplemental Information Terrestrial Route Revision.

20 December 2002: Letter to JRP - Revision to Offshore Geotechnical Investigation GSX Cherry Point, WA to Manley Creek, B.C.

20 December 2002: Letter to JRP - Seismic Analysis Reports.

20 December 2002: Letter to JRP - Supplemental information.

18 December 2002: Letter to Islands Trust - Request for copies of documents filed.

17 December 2002: Letter to JRP - Information Requests to GSXCCC, Marine Coalition, VIPLA.

16 December 2002: Letter to JRP - Reply comments to intervenor submissions regarding readiness of application for hearing.

11 December 2002: Letter to JRP - Reply Comments to submissions opposing 26 November 2002 GSX PL's motion.

11 December 2002: Letter to JRP - Comments on Motion of Màiri McLennan.

11 December 2002: Letter to JRP - Comments on Motion of GSXCCC.

9 December 2002: Letter to JRP - Application is ready to set down for hearing.

6 December 2002: Letter to JRP - Affidavit of John Duffy.

4 December 2002: Letter to JRP - Tseycum First Nation Traditional Use report.

29 November 2002: Letter to JRP - IR No. 19.

29 November 2002: Letter to JRP - IR No. 17.

28 November 2002: Letter to JRP - IR No. 16.

26 November 2002: Letter to JRP - Notice of Motion.

25 November 2002: Letter to JRP - Response to GSXCCC IR No. 1.16(e) units for intensity variables.

19 November 2002: Letter to JRP - Response to GSXCCC IR No. 16(e).

19 November 2002: Letter to JRP - Supplementary response to GSXCCC IR No. 1.7.

15 November 2002: Letter to JRP - Transcription error in GSX supplementary response to GSXCCC IR No. 1.16.

13 November 2002: Letter to JRP - Receipt of Notice of Motion from Saturna Community Club.

8 November 2002: Letter to JRP - Request for dismissal of Notice of Motion by Marine Coalition dated 7 November 2002.

29 October 2002: Letter to JRP - Supplementary responses to Intervenor Information Requests.

24 October 2002: Letter to JRP - Preliminary Report on the Environmental Effects of a Marine Pipeline on Nearby Soft Bottom Benthic Infaunal Communities - Bazan Bay, B.C. October 2002.

17 October 2002: Letter to JRP - Notice of Motion to file Tseycum First Nation Traditional Use Study in confidence.

10 October 2002: Letter to JRP - Order Issuing Certificate and Presidential Permit.

9 October 2002: Letter toJRP - Sencot'en Traditional Land Use and Occupancy Study 2002.

7 October 2002: Letter to JRP - Response to IR No. 14.

5 September 2002: Letter to JRP - Document Repositories maintained by GSX PL.

29 August 2002: Letter to JRP - Comments on Motions relating to the filing of intervenor evidence.

29 August 2002: Letter to JRP - Comments on Motions relating to the 18 July 2002 responses to IRs.

29 August 2002: Letter to JRP - Comments on Motions relating to the June 6, 2002 responses to IRs.

20 August 2002: Letter to JRP - IR No. 5.12(b) and attached report.

20 August 2002: Letter to JRP - IR No. 7.65(b) and attached report.

9 August 2002: Letter to JRP - Notice of Motion concerning filing of traditional use information.

9 August 2002: Letter to JRP - IR No. 13.13(a).

9 August 2002: Letter to JRP - Late intervention of Snuneymuxw First Nation.

8 August 2002: Letter to JRP - Suggest scheduling technical conference on marine issues for September.

8 August 2002: Letter to JRP - Final Environmental Impact Statement from FERC.

7 August 2002: Letter to JRP - Response to IR No. 13.

18 July 2002: Letter to JRP - Response to Information Requests from CAC(BC) et al, Environment Canada, GSXCCC, SPEC and DSF.

15 July 2002: Letter to JRP - Notice of Motion.

9 July 2002: Letter to Panel - Letter of 4 July 2002 from Senccot'en Alliance to Panel.

2 July 2002: Letter to Panel - Technical conference for marine portion of GSX Canada PL.

25 June 2002: Letter to JRP - Attaching report entitled Presence and Distribution of Owls Along a Proposed Gas Pipeline Route on Southeastern Vancouver Island, B.C.

20 June 2002: Letter from Macleod Dixon to Panel - Response to 18 June 2002 letter from counsel to SPEC and DSF.

18 June 2002: Letter to JRP - Information respecting environmental effects of combustion of gas at Duke Point generation facility.

17 June 2002: Letter to Panel - Request for dates for technical conference on marine issues.

17 June 2002: Letter to JRP - Response to IR No. 9.

17 June 2002: Letter to JRP - Requesting dates for technical conference on marine issues.

6 June 2002: Letter to JRP - Request of extension of deadline for Written Evidence of Applicant on combustion of gas.

5 June 2002: Letter to JRP - Response to IR Nos 5, 6 and 7 and various reports.

30 May 2002: Letter to Panel - Late intervention of the University of British Columbia and Vassilopoulos & Williamson, LC.

30 May 2002: Letter to Panel - Late intervention of B.C. Aboriginal Fisheries Commission.

24 May 2002: Letter to JRP - Aker Engineering report "Pipeline On-Bottom Stability Analysis".

17 May 2002: Letter from Macleod Dixon - Submitting copies of 14 reports.

14 May 2002: Letter from Macleod Dixon - Re-establishing dates for the technical conference on marine issues.

14 May 2002: Letter to JRP - Response to IR No. 4.1(a) with attached report.

13 May 2002: Letter from Macleod Dixon - Comments on Panel letter of 16 April 2002.

2 May 2002: Letter from Macleod Dixon (GSX Pipeline) - Response to Mr. Hackney's letter of 1 May 2002 (GSXCCC).

29 April 2002: Letter from Macleod Dixon - Response to questions in Panel's letter of 16 April 2002.

29 April 2002: Letter from Macleod Dixon - No comment with respect to late intervention of Vancouver Island Advanced Technology Centre.

11 April 2002: Letter from Macleod Dixon to Panel - Response to IR No. 8.

3 April 2002: Letter from Macleod Dixon to Panel - List of reports provided to Ms. Washington-Smyth.

22 March 2002: Letter from Macleod Dixon to Panel - Receipt of submissions from parties regarding the questions posed in Panel letter dated 31 January 2002.

21 March 2002: Letter from Macleod Dixon to Panel - Response to Panel's letter of 8 March 2002 concerning the request of the Department of Justice for a workshop regarding First Nations' issues.

7 March 2002: Letter from Macleod Dixon to Panel - Late intervention of Westcoast Energy Inc. and Centra Gas British Columbia Inc.

6 March 2002: Letter from Macleod Dixon to Panel - List of reports provided to Sencot'en Alliance.

25 February 2002: Letter from Macleod Dixon to Panel -  Advising of submission of several reports requested in IR No. 4.

20 February 2002: Letter from Macleod Dixon to Panel -  Response to IR No. 4.

20 February 2002: Letter from Macleod Dixon to Panel - Copies of reports requested by GSXCCC.

19 February 2002: Letter from Macleod Dixon to Panel -  Attachment of copies of supplement information respecting Volume II, Section 4, Supply of Gas.

19 February 2002: Letter from Macleod Dixon to Panel -  Pre-Hearing technical conference.

19 February 2002: Letter from Macleod Dixon to Panel -  Response to Panel's letter of 22 January 2002.

14 February 2002: Letter from Macleod Dixon on behalf of GSX PL - Whether the Panel can and should consider the environmental effects of combustion.

11 February 2002: Letter from Macleod Dixon to Panel -  Response to IR No. 2.

7 February 2002: Letter from Macleod Dixon to Panel -  Advising that D.G. Davies will be the authorized representative of GSX PL.

8 January 2002: Letter from Macleod Dixon to Panel - Revision to Volume II of their application as it relates to their construction commencement date.

28 January 2002: Letter from Macleod Dixon to Panel -  Response to IR No. 3.

20 November 2001: Letter from Macleod Dixon to Panel -  Relief from Section 8(a) of the DOP as it relates to publication of a map in the Canada Gazette.

20 November 2001: Letter from Macleod Dixon to Panel -  Advise that Hearing Order in both official languages were sent to persons identified on their attached list.

26 October 2001: Letter from Macleod Dixon to Panel -  Proposed Timetable of Events attached to Panel's letter of 2 October 2001.

16 October 2001: Letter from Macleod Dixon to Panel -  Response to IR No. 1.

5 October 2001: Letter from Macleod Dixon to Panel - Attachment of 25 copies of supplement information for Volumes II, III, IV and V.

25 May 2001: Letter to JRP - Reference to their letter of 24 April regarding serving hard copies to intervenors.

24 April 2001: Letter to JRP - Application pursuant to Parts III and IV of the NEB Act.

5 September 2000: Newsletter received at the NEB on 5 September 2000.

28 August 2000: Letter to NEB - Scope of Environmental Assessment.

16 August 2000: Macleod Dixon letter to NEB - Advising of the repositories that have been established.

August 2000: GSX update bulletin.

11 July 2000: BC Hydro letter to NEB - Landowner Complaint - Steve and Dodie Miller.

11 July 2000: BC Hydro letter to the Sierra Club of B.C. - Planning for the design, construction and operation of a pipeline.

28 June 2000: BC Hydro letter to NEB - Early Public Notification.

21 June 2000: Macleod Dixon letter to NEB - Environmental Assessment.

2 June 2000: Macleod Dixon letter to NEB - Preliminary Submission for the Georgia Strait Crossing Project.

June/July 2000: Williams/BC Hydro newsletter entitled Georgia Strait Crossing Project update.

19 April 2000: Macleod Dixon letter to NEB - Preliminary Submission.

April 2000: Application to NEB from Georgia Strait Crossing Pipeline Ltd.

7 April 2000: BC Hydro News Release - Georgia Strait Crossing Project Team conclude that the Koksilak Corridor option is no longer viable.

22 March 2000: Fax from Macleod Dixon enclosing a copy of the Natural Resources Canada letter of comment.

7 March 2000: Letter from Macleod Dixon in respect of the proposed Georgia Strait Crossing Project for the purpose of initiating scoping activities under the CEAA in advance of Certificate filing with the NEB in the fall of 2000.

Canadian Environmental Assessment Agency (CEAA)

Agence canadienne d'évaluation environnementale (ACÉE)

9 November 2001: Public Notice - GSX Canada Pipeline Project Joint Panel Review Deadline for Participant Funding Applications. /
9 novembre 2001 : Avis public - Commission d'examen conjoint du projet de gazoduc GSX Canada Pipeline - Échéance pour les demandes d'aide financière aux participants.

9 November 2001: Funding Application Deadline for Public Participation in GSX Canada Pipeline Project Joint Panel Review (News Release). /
9 novembre 2001 : Date limite pour les demandes d'aide financière - Participation publique à l'examen conjoint par une commission du projet de gazoduc GSX Canada Pipeline (Communiqué).

20 September 2001: Federal Government Appoints Joint Panel for the GSX Canada Pipeline Project. /
20 septembre 2001 : Le gouvernement fédéral nomme la commission d'examen conjoint du projet de gazoduc GSX Canada Pipeline.

20 September 2001: Joint Panel Review of the GSX Canada Pipeline Project. (Backgrounder)/
20 septembre 2001 : Examen conjoint par une commission du projet de gazoduc GSX Canada Pipeline (Feuillet documentaire).

17 August 2001: Letter to Bryan Williams from Minister Anderson - His appointment as a panel member.

15 August 2001: Agreement between the National Energy Board and the Minister of the Environment. /
15 août 2001 : Entente entre l'Office national de l'énergie et le Ministre de l'Environnement.

18 June 2001: Participant Funding Available to Review the Project. /
18 juin 2001 : Aide financière aux participants disponible pour l'examen du projet.

June 2001: Backgrounder. /
Juin 2001 : Fiche d'information.

15 mai 2001: Public Comment Invited on the Draft Agreement. /
15 mai 2001 : Invitation au public à émettre des commentaires sur l'ébauche d'entente.

May 2001: Draft Agreement between the Minister of the Environment and the NEB. /
Mai 2001 : Ébauche de l'Entente entre l'Office national de l'énergie et le Ministre de l'environnement.

15 May 2001: Letter to Ken Vollman from Minister Anderson regarding the referral to a joint review panel.

No date: Summary of letters sent to Minister Anderson from 4 October  2000 to 15 May 2001.

4 October 2000: Project Referred to Environmental Assessment Panel (News Release). /
4 octobre 2000 : Le projet est renvoyé à une commission d'évaluation environnementale (Communiqué).

2 October 2000: Letter to Ken Vollman from Minister Anderson - Referral to a review panel.

7 September 2000: Fax to NEB enclosing copy of letter to the Honourable David Anderson from Gary V. Lunn, MP dated 25 August 2000.

6 September 2000: Letter to NEB - Letters to Minister Anderson on GSX, enclosing copies of letters from Sierra Club 15 June, Coell MLA 3 August, Senator Carney 14 August and Fyles 17 August.

1 June 2000: E-mail from John Mathers to NEB - Review of final draft for the Georgia Strait Crossing Project.

National Energy Board (NEB)

Office national de l'énergie (ONÉ)

26 July 2001: Letter to Minister Anderson from Ken Vollman regarding the appointment of two panel members.

7 May 2001: Letter from GSX Panel to Bruce Young, CEAA - Agreement between the National Energy Board and the Minister of the Environment concerning the Review of the Georgia Strait Crossing project (the draft agreement).

May 2001: Draft Agreement between the Minister of the Environment and the NEB. /
Mai 2001 : Ébauche de l'Entente entre le Ministre de l'environnement et l'ONÉ.

5 October 2000: Letter to interested parties with attached NEB letter dated 28 September 2000 to the Minister of the Environment.

4 October 2000: E-mail to Mrs. Dodie Miller (Shadybrook Farm) acknowledging receipt of her E-mail dated 18 September 2000 - GSX Project.

4 October 2000: E-mail to Mr. Richard Hughes acknowledging receipt of his E-mail dated 28 September 2000 - GSX Project.

28 September 2000: Letter to the Honourable David Anderson, Minister of the Environment - Referral of the Proposed Georgia Strait Crossing Pipeline Limited Georgia Strait Crossing Project to a Panel Review. /
28 septembre 2000 : Lettre adressée à l'honorable David Anderson, ministre de l'Environnement, pour demander le renvoi du projet de pipeline de franchissement du détroit de Georgia de Georgia Strait Crossing Pipeline Limited en vue de son examen par une Commission.

27 September 2000: Letter to Mr. Brad Crockett acknowledging receipt of his letter dated 10 September 2000 - Final Scoping document.

25 September 2000: E-mail to Mr. Steve Miller acknowledging receipt of his E-mail dated 15 September 2000 - GSX Project.

25 September 2000: E-mail to Mr. Arthur Caldicott acknowledging receipt of his E-mail - NEB Online Public Registry.

21 August 2000: Letter to Mrs. Cathy McGay - GSX Pipeline Project Landowner information request.

18 August 2000: Letter to Ms. Leona Mr. Sparrow - Environmental Assessment of GSX Project.

3 August 2000: Letter to Mr. Chris Pretty - Canadian Environmental Assessment Act.

28 July 2000: E-mail to Mr. Glenn Thornton confirming receipt of his letter.

6 July 2000: Letter to Interested Parties - Extension for filing comments on draft scope.

30 June 2000: Letter to Mr. Glenn Thornton - BC Hydro - Landowner complaint.

13 June 2000: Letter to Mr. Chuck Farrar - Landowner complaint - Truswell Property.

13 June 2000: Letter to Mr. Chuck Farrar - Retention of Solicitor to address legal issues.

12 June 2000: Letter to Macleod Dixon - Scope of Environmental Assessment.

12 June 2000: Letter to Macleod Dixon - Environmental Assessment (includes Public Notice, Publications List and Draft Scoping Package).

12 June 2000: Letter to Distribution List - Environmental Assessment of the Proposed Georgia Strait Crossing Pipeline Project (includes Draft Scoping Package).

June 2000: Draft Scoping Package for the Georgia Strait Crossing Project /
Juin 2000 : Ébauche de Trousse de détermination de la portée de l'évaluation environnementale visant le projet de franchissement du détroit de Georgia (en anglais seulement)

16 May 2000: Letter to Mr. Raymond and Mrs. Margaret Belot - Horton Property.

16 May 2000: Letter to Mr. Chuck Farrar - Landowner Complaint - Truswell Property.

25 April 2000: Letter to Distribution List - Georgia Strait Crossing Project - Scoping.

20 April 2000: Letter to Mr. Ken Horton - Landowner request for information.

11 April 2000: Letter to Mr. Andrew Brodway (BC Hydro) - Landowner Complaint - Mr. Mayer.

16 March 2000: Letter to Federal Departments and Agencies enclosing the Georgia Strait Preliminary Submission and asked for identification of responsibilities under CEAA

Joint Review Panel

Commission d'examen conjoint

28 November 2003: Joint Review Panel approves GSX Canada Pipeline Project (News Release). /
28 novembre 2003 : Une Commission d'examen conjoint approuve le project de Pipeline GSX Canada (Communiqué).

28 July 2003: Letter to All Parties to Hearing Order GH-4-2001 Proceeding - Joint Review Panel Report.

8 July 2003: Letter to Parties to GH-4-2001 Proceeding - Notice of Motion by GSXCCC.

19 June 2003: Letter to Parties to GH-4-2001 Proceeding -  List of Parties for the Motion.

17 June 2003: Letter to All Parties to Order GH-4-2001 - Questions in Oral Argument.

13 June 2003: Letter to Parties to GH-4-2001 Proceeding -  Notice of Motion by GSXCCC.

12 June 2003: Georgia Strait Crossing Joint Review Panel to hold one day public hearing on a Notice of Motion (News Release). /
12 juin 2003 : La Commission d'examen conjoint pour le franchissement du détroit de Georgia tiendra une audience publique d'une journée concernant un avis de motion (Communiqué).

11 June 2003: Letter to Parties to GH-4-2001 Proceeding -  Notice of Motion by GSXCCC.

8 May 2003: Exhibit List.

7 March 2003: Hearing Submission to GSX PL - Comments on Proposed Draft Conditions required.

6 March 2003: Hearing Submission - IR No. 37.

24 February 2003: Letter to GSX PL - Draft Conditions for Comment.

19 February 2003: Letter to All Parties - Statements at the Hearing.

19 February 2003: Letter to Sencot'en Alliance - Motion dated 17 February 2003.

19 February 2003: Letter to GSX PL - IR No. 36.

19 February 2003: Letter to BCMEM - Purpose of IR No. 35.

19 February 2003: Letter to All Parties - Amendment to List of Parties.

17 February 2003: Letter to All Parties - Hearing matters.

14 February 2003: Letter to All Parties - Procedural Update No. 14.

12 February 2003: Letter to VIPLA - VIPLA letter dated 7 February 2003.

12 February 2003: Letter to CAC(BC) - Motion dated 4 February 2003.

12 February 2003: Letter to CAC(BC) - Letter dated 10 February 2003.

12 February 2003: Letter to All Parties - Amended List of Parties.

7 February 2003: Letter to GSX PL - Granting the Notice of Motion for the filing of Cowichan Tribes study pursuant to section 16.1.

31 January 2003: Letter to All Parties to GH-4-2001 - Decision on whether the application is ready to proceed to hearing.

31 January 2003: Letter to GSX PL - IR No. 35.

30 January 2003: Letter to Snuneymuxw - IR No. 34.

30 January 2003: Letter to Shadybrook Farm - Notice of Motion dated 29 January 2003.

30 January 2003: Letter to GSX PL - Service of Documents.

30 January 2003: Letter to GSX PL - IR No. 33.

30 January 2003: Letter to SPEC and DSF - Disclosure Letter.

27 January 2003: Letter to GSX PL - Witness Panels.

27 January 2003: Letter to GH-4-2001 Interested Parties - Disclosure.

24 January 2003: Letter to Parties to GH-4-2001 - Hearing information and venues.

17 January 2003: Letter to GSX PL - Statements in news stories.

13 January 2003: Letter to Parties to GH-4-2001 - Setting down application for hearing.

13 January 2003: Letter to Parties to GH-4-2001 - Setting hearing date.

13 January 2003: Letter to Màiri McLennan and GSXCCC -  Request for review of decision.

13 January 2003: Letter to GSXCCC - Motion dated 16 December 2002.

14 January 2003: Georgia Strait Crossing Joint Review Panel sets date for public hearing (News Release). /
14 janvier 2003 : La Commission d'examen conjoint du projet de franchissement du détroit de Georgia fixe la date de l'audience publique (Communiqué).

9 January 2003: Letter to GSX PL - Section 16.1 motion dated 26 November 2002.

9 January 2003: Letter to GSXCCC - IR No. 31.

9 January 2003: Letter to Cohen Highley LLP for VIPLA - IR No. 30.

9 January 2003: Letter to University of B.C. and the Cedar Lodge Society - IR No. 29.

9 January 2003: Letter to GSX PL - IR No. 28.

20 December 2002: Letter to All Parties - Procedural Update No. 11.

18 December 2002: Letter to All Parties - Procedural Update No. 10.

18 December 2002: Letter to All Parties - Procedural Update No. 9.

18 December 2002: Letter to Islands Trust Council - IR No. 27.

17 December 2002: Letter to VIPLA - IR No. 26.

17 December 2002: Letter to Màiri McLennan - IR No. 23.

17 December 2002: Letter to GSXCCC - IR No. 22.

17 December 2002: Letter to Anthony Fisher - IR No. 21.

17 December 2002: Letter to Environment Canada - IR No. 20.

16 December 2002: Letter to Counsel for Sencot'en Alliance - IR No. 25.

16 December 2002: Letter 16 December 2002 to Province of B.C. - IR No. 24.

12 December 2002: Letter to All Parties - Procedural Update Letter No. 8.

6 December 2002: Letter to All Parties - Letter from Mr. Morton.

2 December 2002: Letter to GH-4-2001 Parties - Pre-hearing conference on marine issues.

29 November 2002: Letter to All Parties - GSX PL Motion.

28 November 2002: Letter to GSXCCC - Their letter dated 26 November 2002.

27 November 2002: Letter to GSX PL - Tseycum FN traditional use study.

27 November 2002: Letter to Islands Trust Council - Written Evidence.

27 November 2002: Letter to All Parties - Procedural Update Letter No. 7.

25 November 2002: Letter to Parties to the Proceeding - Readiness to set down for Hearing.

22 November 2002: Letter to GSX - Response to SPEC and DSF IR No. 2.3(f).

22 November 2002: Letter to GSXCCC - Motion dated 20 November 2002.

22 November 2002: Letter to All Parties - Procedural Update Letter No. 6.

22 November 2002: Letter to All Parties - Notice of Motion from Màiri McLennan.

20 November 2002: Letter to GSX - JRP IR No. 19.

20 November 2002: Letter to GSXCCC - GSXCCC letter dated 18 November 2002.

19 November 2002: Letter to Pender Island GSX Coalition - Filing of intervenor evidence.

19 November 2002: Letter to GSXCCC - GSXCCC Notice of Motion dated 7 November 2002.

19 November 2002: Letter to GSX - JRP IR No. 17.

19 November 2002: Letter to GSX and counsel for SPEC and DSF - SPEC and DSF submission.

19 November 2002: Letter to First Nations - JRP IR No. 18.

19 November 2002: Letter to Parties named in the distribution list - JRP IR No. 16.

19 November 2002: Letter to All Parties - Procedural Update No. 5.

12 November 2002: E-mail from Craig Darling to Participants - Marine Technical Conference Session plan, updated agenda and participant list.

4 November 2002: Letter to All Parties - Notice of Motion - Tseycum First Nation Traditional Use Study.

29 October 2002: E-mail from Craig Darling (consultant hired by JRP to facilitate marine technical conference) with agenda for conference and participant list.

22 October 2002: Letter to All Parties - Contract with BGC Engineering Inc. for geotechnical expertise.

18 October 2002: Letter to All Parties - Reasons related to letter decision dated 26 September 2002.

18 October 2002: Letter to Macleod Dixon - IR No. 15.

17 October 2002: Letter to List of Participants to the Marine Technical Conference - Pre-hearing conference on technical and scientific issues relating to the marine portion of the project.

9 October 2002: Letter to Department of Fisheries and Oceans - IR No. 14 Extension.

4 October 2002: Letter to Macleod Dixon - Libraries.

1 October 2002: Letter to Federal Intervenors - IR No. 14.

27 September 2002: Letter to All Parties - Pre-hearing Marine Technical Conference.

26 September 2002: Letter to A. Caldicott - E-filing documents.

24 September 2002: Letter to GSX PL - Traditional Land Use and Occupancy Study.

13 September 2002: Letter to All Parties - Deadline to Reply to Motions.

12 September 2002: Fax to Alberta Department of Energy - Requesting comments on Intervenors not served.

19 August 2002: Letter to John Clark, Counsel for DFO - Clarification of IR 2.3(5).

15 August 2002: Letter to All Parties to GH-4-2001 - 9 August 2002 Notice of Motion filed by the Applicant.

15 August 2002: Letter to Snuneymuxw First Nation - Granting late intervenor status.

15 August 2002: Letter to All Parties to GH-4-2001 - Late intervenor status of Snuneymuxw First Nation.

17 July 2002: Letter to Macleod Dixon - IR No. 13.

17 July 2002: Letter to Saturna Community Club - NEB Contracting Practices.

17 July 2002: Letter to Macleod Dixon - Request for Review.

12 July 2002: Letter to Department of Justice on behalf of NRCan - IR No. 12.

12 July 2002: Letter to Mandell Pinder on behalf of Sencot'en Alliance - Filing of Notice of Motion.

12 July 2002: Letter to GH-4-2001 Interested Parties - Unanswered Information Requests and Filing of Intervenor Evidence.

28 June 2002: Letter to Macleod Dixon - IR No. 11.

28 June 2002: Letter to Saturna Community Club - Response to Saturna's letter dated 24 June 2002.

27 June 2002: Letter to GH-4-2001 Interested Parties - Unanswered Information Requests.

27 June 2002: Letter to Ms. S. Washington-Smyth of Saturna Community Club - Response to her letter of 19 June 2002 regarding the consultant.

26 June 2002: Letter to Mr. Gordon L. Bell - His IR No. 1.6.

25 June 2002: Letter to Distribution List - GSX Canada Pipeline Project Hearing Order GH-4-2001 Update.

25 June 2002: Letter to Macleod Dixon - Traditional Use Studies.

18 June 2002: Letter to All Parties to GH-4-2001 - Preliminary Exhibit List.

13 June 2002: Letter to Macleod Dixon - Request for Extension of Written Evidence of Applicant on the Combustion of Gas.

4 June 2002: Letter to Parties to GH-4-2001 Proceeding - E-mail replies to procedural inquiries from intervenors and public.

4 June 2002: Letter to Parties to GH-4-2001 Proceeding - 15 January 2002 transcript errata.

4 June 2002: Letter to Parties to GH-4-2001 Proceeding - Amended List of Parties.

31 May 2002: Letter to All Parties - Oral Argument on Motion.

31 May 2002: Letter to Parties to GH-4-2001 Proceeding - Revised Timetable for GH-4-2001 Proceeding.

31 May 2002: Letter to Karen Koncohrada, Province of B.C. - IR No. 10.

31 May 2002: Letter to Macleod Dixon - IR No. 9.

31 May 2002: Letter to Macleod Dixon - Hearing Order GH-4-2001 - Filing Requirements.

27 May 2002: Letter to Macleod Dixon - Late intervention of the University of British Columbia and Vassilopoulos & Williamson LC.

24 May 2002: Letter to Màiri McLennan and John Clark, Counsel, Department of Justice - Their letters filed outside the established deadline of 6 May 2002 in Panel letter of 16 April 2002.

15 May 2002: Letter to All Parties to GH-4-2001 Proceeding - Procedural Update No. 4, E-mail enhancement update.

13 May 2002: Letter to D.G. Davies, Macleod Dixon - Late intervention of B.C. Aboriginal Fisheries Commission.

10 May 2002: Letter to All Parties to GH-4-2001 - Amended List of Parties.

7 May 2002: Letter to All Parties to GH-4-2001 - Amended List of Parties.

3 May 2002: Letter to Mr. Thomas Hackney - Response to his letter dated 1 May 2002 and the Applicant's letter dated 2 May 2002.

3 May 2002: Letter to Mr. Arthur Caldicott, GSXCCC - Responding to his letter and e-mail dated 20 April and 25 April 2002.

3 May 2002: Letter to Mr. Michael P. Doherty of British Columbia Public Interest Advocacy Centre - Response to his letter dated 30 April 2002.

22 April 2002: Letter to Parties to the GH-4-2001 Proceeding - Pre-hearing Technical Conference on Marine Issues Postponed.

16 April 2002: Georgia Strait Crossing Joint Review Panel postpones commencement of public hearing (News Release and letter). /
16 avril 2002 : La Commission d'examen conjoint du projet de franchissement du détroit de Georgia reporte l'audience publique, (Communiqué et lettre (en anglais seulement)).

16 April 2002: Letter to Mr. Caldicott - Web site enhancements.

12 April 2002: Letter to Mr. James Campbell - Response to his letter of 22 February 2002.

5 April 2002: Letter to Mr. Davies enclosing Panel IR No. 7.

5 April 2002: Letter to Thomas Hackney, Director GSXCCC - Distribution of documents during the oral hearing scheduled for 9 and 10 April 2002.

4 April 2002: Letter to Counsel for Consumers' Association of Canada (B.C. Branch) et al - Their participation by telephone conference call for the oral argument in Sidney, B.C. on 9 and 10 April 2002.

4 April 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Oral Argument on Motion.

4 April 2002: Letter to Macleod Dixon - Comments on suggestion to establish a workshop regarding First Nations' issues.

2 April 2002: Letter to Macleod Dixon - Request for comments on late intervention of VIATeC.

27 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Procedural Update No. 3, evidence and information requests onn emissions from the combustion of natural gas.

27 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Update to Amended List of Parties.

5 April 2002: Letter to all Parties - Amendment to Amended List of Parties related to a change in Mr. Caldicott's e-mail address.

25 March 2002: Letter to all Parties - Amendment to Amended List of Parties related to Mr. Skerik electing to receive all documents.

25 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Pre-hearing conference on technical and scientific issues relating to the marine portion of the project.

25 March 2002: Letter to Macleod Dixon - Reply to Sencot'en Alliance submissions filed 18 March 2002.

22 March 2002: Letter to all Parties - Amendment to Amended List of Parties related to change of representative for GSXCCC.

21 March 2002: Letter to Mr. Doherty - Conference call for oral argument.

15 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Filing of certain gas supply information.

15 March 2002: Letter to Macleod Dixon - IR No. 6.

13 March 2002: Letter to Macleod Dixon - IR No. 5.

13 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Decision: distribution of documents before the start of the hearing effective 1 April 2002.

13 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Further to Panel letters of 31 January and 22 February 2002, intent to hear argument from parties who provide submissions on the matter referred to in these letters.

12 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - JRP Procedural Update Letter No. 2.

12 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Amended list of parties.

12 March 2002: Letter to All Parties to Hearing GH-4-2001 Proceeding - Pre-hearing technical conference on technical and scientific issues relating to the marine portion of the project.

12 March 2002: Letter to Nova Scotia Department of Justice - Response to letter regarding the participation of their client in the proceeding.

12 March 2002: Letter to Environment Canada, Natural Resources Canada, Department of Fisheries and Oceans, Parks Canada Agency - Involvement of federal government departments in the process.

8 March 2002: Letter to Mr. Don Davies - First Nations Consultation and the Board's Memorandum of Guidance on consultation with Aboriginal Peoples.

4 March 2002: E-mail to John Parker - Distribution of documents.

4 March 2002: E-mail to Samuel Bowes - Distribution of documents.

1 March 2002: E-mail to Gulf Crab Fishers Association - Authorized Representative.

1 March 2002: Letter to Parties who have not elected an authorized representative - Election of authorized representatives.

1 March 2002: Letter to Mr. Don Davies - Late applications for intervenor status of Centra Gas British Columbia Inc. and Westcoast Energy Inc.

1 March 2002: Letter to Mr. Don Davies - Disclosure of Mr. Williams.

26 February 2002: E-mail to Counsel for Duke Energy Trading & Marketing - Procedural Update.

25 February 2002: Letter to Ms. Dawn J. Kershaw, Cohen Highley LLP - Amendments to List of Parties: Election of Authorized Representative.

22 February 2002: Letter to Mr. Timothy Howard - Revised timelines for comments on emissions question set out by the Panel on 31 January 2002.

11 February 2002: Letter to Mr. Don Davies - Placement of transcripts from Public Consultation Sessions.

7 February 2002: Letter to SPEC and DSF - No decision on revised comment process.

1 February 2002: NEB letter to Mr. D. Davies, Counsel for GSX, with attached IR No. 4.

31 January 2002: NEB letter to All Parties to Hearing Order GH-4-2001 with attached List of Issues.

31 January 2002: Revised List of Issues.

31 January 2002: NEB letter to All Parties to GH-4-2001 - Procedural Update.

31 January 2002: NEB letter to Mr. D. Davies, Counsel for GSX - Formal process to determine whether or not proposed issues to be considered at the hearing.

25 January 2002: NEB letter to Distribution List - Possible duplicate interventions.

22 January 2002: Letter to GSX PL, Saturna Community Club et al, Islands Trust - Pre-hearing technical conference.

No date: Public Consultation Sessions from 11 to 19 January 2002 on GSX Canada pipeline project (Special Notice) (Questions and Answers). /
Aucune date : Séances de consultation publique du 11 au 19 janvier 2002 pour le projet de pipeline GSX Canada (Avis spécial) (Questions et réponses).

No date: Public Consultation Sessions from 11 to 18 January 2002 on GSX Canada pipeline project (Notice). /
Aucune date : Séances de consultation publique du 11 au 18 janvier 2002 pour le projet de pipeline GSX Canada (Avis).

11 January 2002: NEB letter to GSXCCC (Mr. T. Hackney) responding to motion dated 9 January 2002.

10 January 2002: NEB letter to Mr. D. Davies, Counsel for GSX, with attached IR No. 3.

10 January 2002: NEB letter to Mr. S. Miller and Mrs. D. Miller responding to 30 November 2001 letter.

10 January 2002: NEB letter to Parties named in distribution list with attached IR No. 2.

4 January 2002: E-mail to Anthony Fisher - Participation in Public Sessions.

21 December 2001: NEB letter to Island Trust (Mr. D. Essig, Mr. W. Wright and Mr. E. Round) responding to letters dated 5 and 13 December 2001.

21 December 2001: NEB letter to Saturna Community Club (Mr. C. Barnett) responding to 17 December 2001 letter.

21 December 2001: NEB letter to GSXCCC (Mr. A. Caldicott) acknowledging receipt of e-mail dated 17 December 2001.

21 December 2001: NEB letter to FERC - Invitation to lead a break-out group at workshop.

19 December 2001: E-mail to Steve Miller - Directing Correspondence through Secretary.

18 December 2001: NEB letter to Mr. Cunliffe Barnett, Mr. Ian Smyth, Mrs. S. Washington-Smyth, Mr. Arthur Caldicott, Mr. Philip Marchant, Mr. Don Skerik, Mr. Steve Miller and Mrs. Dodie Miller - Possible duplicate interventions.

18 December 2001: NEB letter to All Parties to Order GH-4-2001 with attached List of Parties.

17 December 2001: NEB letter to Saturna Community Club et al, Island Trust and GSXCCC - Proposed pre-hearing conference on the marine portion.

17 December 2001: NEB letter to Saturna Community Club - Tour of Saturna Island.

5 December 2001: E-mail to Samuel Stark Bowes - Intervenor Funding.

30 November 2001: E-mail to Anthony Fisher - Information on Intervention Procedures.

29 November 2001: Letter to Gregory J. McDade, Ratcliff & Company - Response to letter dated 5 November 2001 addressing procedural and substantive issues related to the Project.

27 November 2001: E-mail to Islands Trust - Information on Intervention Procedures.

26 November 2001: Letter from Panel to Saturna Community Club - Response to their letter (undated) which addresses procedural and substantive issues related to the Project.

26 November 2001: Letter from Panel to GSXCCC - Response to their letter of 24 October 2001.

26 November 2001: Letter from the Panel to D.G. Davies, Macleod Dixon -  Granting relief from including a map in the notice to be published.

9 November 2001: Public hearing procedure announced for Georgia Strait Crossing Pipeline Limited application (News Release and Hearing Order). /
9 novembre 2001 :  L'ONÉ fournit des instructions sur le déroulement de l'audience publique portant sur la demande de Georgia Strait Crossing Pipeline Limited (Communiqué et ordonnance d'audience).

17 October 2001: Letter from the Panel to Tom Hackney - Response to his 12 October 2001 e-mail requesting information about Public Information Sessions.

16 October 2001: Letter from the Panel to Ms. Sharon Charles, Sencot'en Alliance - First Nation Information Sessions.

16 October 2001: Letter from the Panel to Chief Vincent Harry, Malahat First Nation - First Nation Information Sessions.

16 October 2001: Letter from the Panel to Chief Earl Jack Sr., Penelakut First Nation - First Nation Information Sessions.

16 October 2001: Letter from the Panel to Mr. Andrew Bok, Tsawwassenn First Nation - First Nation Information Sessions.

16 October 2001: Letter from the Panel to Chief Vern Jacks, Tseycum First Nation - First Nation Information Sessions.

16 October 2001: Letter from the Panel to Chief Lydia Hwitsum, Cowichan Tribes - First Nation Information Sessions.

2 October 2001: Letter from the Panel to Mr. D. Davies, Counsel for GSX, requesting comments on the proposed schedule and IR No. 1.

15 August 2001: Agreement between the National Energy Board and the Minister of the Environment. /
15 août 2001: Entente entre l'Office national de l'énergie et le Ministre de l'Environnement.

Alberta Department of Energy

11 December 2002: Letter to JRP - Motions brought by GSXCCC and Màiri McLennan.

12 September 2002: Letter to JRP - Support of GSXCCC's extension to reply to ADOE's submission.

29 August 2002: Letter to JRP - Submission opposing Notices of Motion to compel answers to IRs respecting electricity.

8 July 2002: Letter to Panel -  Panel's letter dated 31 January 2002.

21 February 2002: Fax and letter - Authorized representative.

14 February 2002: Letter - Joint Review Panel consideration of environmental effects.

6 December 2001: Brent Prenevost fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

British Columbia Utilities Commission (BCUC)

16 November 2001: Robert J. Pellatt letter to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Canadian Coast Guard (CCG)

Garde côtière canadienne (GCC)

20 March 2000: Canadian Coast Guard (Pacific Region) Letter of Comment to NEB advising that they have a responsibility under CEAA (NEB Section 108(4)) and can provide specialist advice pursuant to section 12(3) of CEAA.

Indian and Northern Development (DIAND)

Affaires indiennes et du Nord canadien (MAINC)

2 May 2000: John Alexis fax to NEB - CEAA fax back.

Justice Canada (on behalf of Environment Canada, Fisheries and Oceans Canada, Parks Canada and Natural Resources Canada)

Justice Canada (pour Environnement Canada, Pêches et Océans Canada, Parcs Canada et Ressources naturelles Canada)

18 June 2003: Letter from Department of Justice to JRP - Support of Motion by GSXCCC.

14 March 2003: Letter from Department of Justice to JRP - Response to Undertaking to provide information regarding crab studies provided by Mr. D. Carter.

12 March 2003: Hearing Submission from Department of Justice to JRP - Curriculum Vitae of Scott Northup.

12 March 2003: Hearing Submission from Department of Justice to JRP - Curriculum Vitae of Tomas Tomascik.

12 March 2003: Hearing Submission from Department of Justice to JRP - Curriculum Vitae of David William Carter.

12 March 2003: Hearing Submission from Department of Justice to JRP - Curriculum Vitae of William Douglas Henwood.

12 March 2003: Hearing Submission from Department of Justice to JRP - Curriculum Vitae of Lisa Walls.

26 February 2003: Letter from Environment Canada to JRP - Request for copies of Emergency Plan and Preparedness Manual.

25 February 2003: Hearing Submission from Department of Justice (on behalf of Environment Canada, et al) - Updated evidence of Environment Canada.

25 February 2003: Hearing Submission from Department of Justice (on behalf of Environment Canada, et al) - Updated evidence submitted by NRCan.

24 February 2003: Hearing Submission from Department of Justice (on behalf of Environment Canada, et al) - Updated evidence of Fisheries and Oceans Canada.

20 February 2003: Letter from Department of Justice to JRP - List of witnesses for federal intervenors.

23 January 2003: Letter from Department of Justice to JRP - Response to Panel regarding readiness of GSX PL material for hearing.

21 January 2003: Letter from Department of Justice to JRP - Response to IR No. 20.

28 November 2002: Fax to JRP - Response to IR No. 16 and written evidence of federal intervenors.

28 November 2002: Fax to JRP - Witness List and Intervenor Evidence of Parks Canada.

17 October 2002: Letter to JRP - Response to IR No. 14 by the federal intervenors.

4 October 2002: Letter from Department of Justice to JRP - Request dfor extension to respond to IR No. 14.

4 October 2002: Letter from Department of Justice to JRP - NRCan dresponse to IR No. 12.

27 August 2002: Letter from Department of Justice (on behalf of Environment Canada, et al) to JRP - Clarification of IR No. 2.3(5).

28 July 2002: Letter from Department of Justice Canada to JRP - Environment Canada's Notice of Motion dated 26 July 2002.

9 July 2002: Letter from Department of Justice to Panel - Environment Canada IR No. 2.

8 May 2002: Letter from Department of Justice - Proposed hearing schedule.

25 April 2002: Letter from Department of Justice (for Federal Department Intervenors) - Response to Panel's 4  April IR No. 8.1.

11 April 2002: Letter from Mr. Hugh MacAulay, Department of Justice Canada, on behalf of the federal intervenors - Request for extension on reply to IR No 8.1.

28 March 2002: Letter from Department of Justice - Information requests from federal departments.

28 March 2002: Letter from Department of Justice - Oral Argument of 9 and 10 April 2002 in Sidney, B.C.

28 March 2002: Letter from Fisheries and Oceans - Federal Intervenor involvement in planning team.

27 March 2002: Letter from Fisheries and Oceans to Mandell Pinter -  Meeting with Sencot'en Alliance.

27 March 2002: Letter from Fisheries and Oceans - Preliminary meeting with NEB and Cowichan Tribes.

18 March 2002: Letter from Department of Justice - Comments on issue of workshop on First Nations Interests.

15 March 2002: Letter from Department of Justice - Response to Panel letter of 31 January 2002 to MacLeod Dixon.

6 March 2002: Letter from the Department of Justice on behalf of federal departments - Designation of authorized representatives.

28 February 2002: Letter from Dave Carter on behalf of Fisheries and Oceans to a First Nations distribution list - Request to meet with respect to views on the GSX Project.

22 February 2002: Letter from Dave Carter on behalf of Fisheries and Oceans to Ms. Sharon Charles, Sencot'en Alliance - Request to meet with respect to views on the GSX Project.

13 February 2002: Fax from John Clark, Counsel, Department of Justice, on behalf of various federal invervenors - Comments on the merits of the Panel sponsoring a pre-hearing conference.

11 February 2002: Fax from Department of Justice on behalf of four federal departments - Activities with respect to First Nations.

8 February 2002: Letter from John Clark of the Department of Justice, on behalf of federal intervenors - Authorized representative.

1 February 2002: Letter from John Clark of the Department of Justice, on behalf of federal intervenors - Adding name to mailing list.

31 January 2002: Letter from Adrian C. Duncan on behalf of Environment Canada - Change of contact.

17 January 2002: Submission by John Clark, Department of Justice, on behalf of four federal departments - Comments on List of Issues.

15 January 2002: Letter from John Clark on behalf of Environment Canada, Fisheries and Oceans Canada, Parks Canada and Natural Resources Canada -  Joint federal intervenors.

20 December 2001: Intervention from Jeff Johansen on behalf of Fisheries and Oceans.

20 December 2001: Fisheries and Oceans intervention from Scott Northrup.

6 December 2001: Don Fast fax on behalf of Environment Canada to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

6 December 2001: Nik Lopoukhine fax to JRP on behalf of Parks Canada - Intervenor Status in GSX Canada Pipeline Project public hearing.

6 December 2001: Catherine Badke fax on behalf of Natural Resources Canada to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

12 September 2000: Mr. Goodale's letter, Minister of Natural Resources Canada, to Mr. Thomas Hackney - Letter dated 22 July 2000.

20 October 2000: Fisheries and Oceans letter to Mr. Thomas Hackney (Sierra Club of B.C.) - GSX Pipeline Project.

25 August 2000: Environment Canada letter to NEB commenting on outstanding matters relating to scoping of Comprehensive Study review of GSX Project.

25 April 2000: Fisheries and Oceans letter to NEB enclosing Memorandum of Understanding. /
25 avril 2000 : Lettre de Pêches et Océans adressée à l'Office national de l'énergie qui comprenait le Protocole d'entente.

31 March 2000: Environment Canada (Pacific and Yukon Region) Letter of Comment indicating that they do not have a responsibility under CEAA and can provide specialist advice if requested.

31 March 2000: Fisheries and Oceans (Pacific Region) letter to interested parties asking for comments on the Georgia Strait Crossing Project by 30 April 2000.

31 March 2000: Parks Canada (Western Canada Service Centre) Letter of Comment indicating that they have no responsibility under CEAA and can provide specialist advice if requested.

27 March 2000: Fisheries and Oceans (Pacific Region) Letter of Comment indicating that they are a responsible authority under CEAA and can provide specialist advice if requested.

22 March 2000: Natural Resources Canada Letter of Comment to NEB indicating that it does not have a responsibility under CEAA and can provide specialist advice if requested.

Department of Justice (Alberta)

Ministère de la Justice (Alberta)

27 March 2002: Copy of letter from Mr. S.H. Rutwind, on behalf of Alberta Justice, in reply to Ms. Joanna Dudley Rollinson's letter of 17 January 2002.

6 March 2002: Letter advising that the Minister of Justice and Attorney General of Alberta intervenes in the proceedings and adopts the submissions filed by British Columbia.

4 March 2002: Letter from Alberta Justice on behalf of the Attorney General of Alberta - Requesting an extension to deadline for filing a submission and evidence.

Department of Justice (Nova Scotia)

Ministère de la Justice (Nouvelle-Écosse)

6 March 2002: Letter - Request for permission to defer decision on whether to submit filings and evidence by the Attorney General.

Office of the Secretary to The Lieutenant-Governor

Bureau du secrétaire du lieutenant-gouverneur

14 June 2002: Letter - Clarification of previous letter.

5 March 2002: Letter of Comment.

Ministry of Energy and Mines, British Columbia (BCMEM)

18 June 2003: Letter to JRP - Opposition of the Province to Mr. Doherty's Request for Panel to consider the Introduction of Other Evidence.

13 June 2003: Letter to JRP - Request to Reschedule Hearing Notice of Motion by GSXCCC.

19 March 2003: Hearing Submission to JRP - Argument of the Province of B.C.

20 February 2003: Letter to JRP - Clarification of the current status of VIGP.

13 February 2003: Letter to JRP - Request for clarification of purpose of IR No. 35.1.

27 January 2003: Letter to JRP - Readiness of this matter to be set down for hearing.

8 January 2003: Letter to JRP - Reply comments on GSXCCC Motion dated 16 December 2002.

6 January 2003: Letter to JRP - IR No. 24.

17 December 2002: Letter to JRP - Delay in receipt of evidence therefore no Information Requests at this time.

16 December 2002: Letter to JRP - Reply comments on intervenor submissions concerning readiness for hearing.

11 December 2002: Letter to JRP - Submissions of the Province of B.C.

11 December 2002: Letter to JRP - Error in their letter of 9 December 2002.

9 December 2002: Letter to JRP - GSX PL application should be set down for hearing.

8 November 2002: Letter received 8 November 2002 to Snuneymuxw First Nation (cc: JRP) - Snuneymuxw letter regarding BC Hydro request for exemption from BC Utilities Commission.

28 November 2002: Fax to JRP - Response to JRP IR No. 16.

7 October 2002: Letter from Arvay Finlay on behalf of Ministry of Energy and Mines, Province of B.C. to JRP - IR No. 14.

29 August 2002: Letter from Arvay Finlay on behalf of BCMEM to JRP - Submissions of the Province of B.C.

3 July 2002: Letter from Province of B.C. - Response to Panel's letter of 27 June  2002.

24 June 2002: Letter from Arvay Finlay on behalf of MEMBC - 18 June 2002 letter of SPEC and DSF to Panel.

19 June 2002: Letter - IR No. 10 of the Province of B.C. and attachments.

3 May 2002: Letter from Arvay Finlay on behalf of the Province of B.C. - Their response to Mr. Davies letter of 29 April 2002.

12 April 2002: Fax from Mr. Christopher Jones, Arvay Finlay on behalf of BCMEM - IR responses Nos 2 and 8.1.

28 March 2002: Letter from Arvay Finlay on behalf of the Province of B.C. - Request to receive correspondence in a timely manner.

22 March 2002: Letter from Arvay Finlay on behalf of the Province of B.C. - Reply Submissions.

15 March 2002: Letter from Arvay Finlay on behalf of the Province of B.C. - Preparing a revised response to IR No. 2.

14 February 2002: Fax from Arvay Finlay on behalf of the Province of B.C. - Reply to Panel letter dated 31 January 2002, concerning authority to consider certain environmental effects.

11 February 2002: Letter from Christopher Jones of Arvay Finlay, on behalf of the Province of B.C. - Contact information.

11 February 2002: Letter from Karen Koncohrada on behalf of the Province of B.C. - IR No.2.

23 January 2002: Letter from Christopher Jones, of Arvay Finlay, on behalf of the Province of B.C. - Written comments as part of the public consultation process.

4 January 2002: Letter to JRP - Registration.

19 December 2001: Letter from Karen Koncohrada, adding two names to list of representatives.

6 December 2001: Karen Koncohrade fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

27 September 2000: Letter to Mr. Phil Marchant - Letter to the Honourable Joan Sawicki, Minister of Environment, Land and Parks and letter to the Honourable Dan Miller.

3 August 2000: Letter to Mr. Chris Pretty - GSX and the interests of Tsartlip First Nation.

25 July 2000: Environmental Assessment Office Government of B.C. fax to NEB enclosing additional comments in respect to the Environmental assessment of the Georgia Strait Crossing Project.

19 July 2000: Environmental Assessment Office Government of B.C. letter to NEB commenting to the Archaeological Assessment Requirements.

18 July 2000: Environmental Assessment Office Government of B.C. letter to NEB providing comments on the Georgia Strait Pipeline Project - Environmental Assessment.

No date: Province of B.C. letter to Mr. Steve Miller, Shadybrook Farm - Georgia Strait Crossing Project.

24 March 2000: Province of B.C. letter to NEB - French language version of the Georgia Strait Memorandum of Understanding.

Ministry of Health, British Columbia

14 February 2002: E-mail from David Fishwick (Public Health Consultant, Ministry of Health Planning) - Inquiring if there is any new information about the GSX Project.

Intervenors

Intervenants

Acker, Alison

3 August 2000: Letter to NEB - GSX Environmental Assessment Scoping.

Andersen, Knud

4 July 2000: Letter to NEB received 4 July 2000 - Fossil fuels and time limit on a public discussion.

Andersen, Susan

26 June 2000: Letter to NEB commenting on the Georgia Pipeline Crossing and the opportunity to debate.

Angus, D.M.

28 August 2000: Fax to NEB received 28 August 2000 commenting on Scope of Environmental Assessment for GSX Project.

Arbess, Saul

17 January 2002: Submission from Mr. Saul Arbess on behalf of the Council of Canadians - Public Consultation Session on scoping.

4 January 2002: Letter to JRP - Registration for Public Consultation Session.

Arbutus Ridge Resident Ratepayers Association (ARRRA)

21 February 2003: Letter to JRP - Speaker at hearing.

21 February 2003: Letter to JRP - Change of e-mail address.

11 February 2002: E-mail from Heather Schyf on behalf of the Arbutus Ridge Resident Ratepayers Association - Final List of Issues and IR No. 4.

6 January 2002: Letter to JRP - Registration.

5 December 2001: Intervention from Heather Schyf on behalf of the ARRRA.

B.C. Aboriginal Fisheries Commission

30 March 2002: Letter from Susan Anderson Behn on behalf of B.C. Aboriginal Fisheries Commission - Application for intervention.

B.C. Gas Utility Ltd.

18 February 2002: Letter from Mr. Rick Parnell on behalf of BC Gas Utility Ltd. - Whether the Panel can and should consider the effects.

3 December 2001: Letter of Intervention from Mr. Rick Parnell, on behalf of B.C. Gas Utility Ltd.

28 August 2000: Letter to NEB - Comments on Scope of Environmental Assessment.

Barrett, Lisa

15 September 2000: E-mail to Mr. David Anderson - Natural Gas Pipeline Project in B.C. and Washington State.

Bavis, James and/et Joanna

31 July 2000: Letter to NEB received 31 July 2000 commenting on Scope of Environmental Assessment for GSX.

Beaubier, Hiram

21 January 2002: Letter to JRP - Scope of GSX review.

Bell, Gordon L.

18 June 2003: Letter to JRP - Support for GSXCCC Notice of Motion.

10 March 2003: Hearing Submission to JRP - Part of Geological Survey of Canada Map 1553A.

26 February 2003: Hearing Submission - Affidavit for Intervenors.

29 January 2003: Letter to JRP - Response to Panel letters dated 17 and 24 January 2003.

10 December 2002: Letter to JRP - Support of Motions of GSXCCC and Màiri McLennan.

28 November 2002: Letter to JRP - Brief intervenor evidence.

9 July 2002: Letter to Panel - Unanswered information requests dated 28 March 2002.

28 March 2002: Letter - Information requests.

11 February 2002: Fax - Filing of certain gas supply information and pre-hearing technical conference.

6 December 2001: Intervention.

Belot, Margaret and/et Raymond

5 May 2000: Letter to NEB - Natural Gas Pipeline.

24 April 2000: Raymond Belot letter to Williams Gas Pipelines - Airstrip Route.

24 April 2000: Margaret (Horton) Belot letter to BC Hydro - Concern and objection to proposed gas pipeline.

20 April 2000: Raymond Belot letter to BC Hydro - Telephone conversation.

Blakeston, Judith et al/et autres

1 August 2000: Letters to NEB - GSX Environmental Assessment Scoping.

Blanchard, Rene and/et Mary

9 August 2000: Letter to NEB - GSX Project.

Blue Energy Canada Inc.

5 December 2001: Martin Burger fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Bolton, Marilyn K.

29 August 2000: Letter to NEB received 29 August 2000 - NEB Scoping Package for GSX Project.

Bomford, Jim

16 January 2002: Intervention.

Bonner, Virginia M. and/et Ralph G.

14 Januray 2002: Letter to Minister David Anderson and NEB - GSX.

Boston, Alex

27 August 2000: Letter to NEB - Georgia Strait Natural Gas Pipeline Crossing - Environmental impact assessment.

Bowes, Samuel Stark

5 December 2001: Intervention.

Boyce, Stewart and Carol

17 March 2003: Hearing Submission to JRP - Letter of Comment.

Braithwaite Estates Improvement District

22 March 2003: Letter to JRP - Mr. Davies' comments in his final rebuttal should be ignored.

17 March 2003: Hearing Submission to JRP -  Final Argument.

24 February 2003: Hearing Submission - Notice of Motion regarding distribution of transcripts dated 22 February 2003.

16 February 2003: Letter to JRP - Clarification of expert witnesses required for cross-examination.

9 February 2003: Letter to JRP - Request for further information.

14 January 2002: Presentation made by J. Francis Hugo - Trustee for the Braithwaite Estates Imnprovement District at the Public Consultation Sessions.

26 December 2001: Letter to JRP - Registration.

3 December 2001: E-mail from J. Francis Hugo on behalf of Braithwaite Estates Improvement District - Submission of intervention.

3 December 2001: J.F. Hugo fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Briggs, Jolyon and/et Shirley

14 January 2002: Presentation notes of Jolyon Briggs from Scoping Session in Cobble Hill.

31 December 2001: Letter from Jolyon Briggs to JRP - Registration.

6 December 2001: Intervention.

Broten, Delores

28 August 2000: E-mail to Mr. David Anderson - GSX and Green Economy.

Bundy, Anita

9 August 2000: Letter to NEB received 9 August 2000 - GSX Environmental Assessment Scoping.

Caldicott, Arthur

17 March 2003: Hearing Submission to JRP - Final Argument.

19 January 2002: Letter to JRP - Natural gas and methane.

4 January 2002: E-mail - Intervention justification, List of Issues.

6 December 2001: Intervention.

14 September 2000: E-mail to the Honourable David Anderson - Kyoto Targets and Electricity Generation in British Columbia.

13 September 2000: E-mail to NEB - NEB on-line Registry for GSX commentary.

Campbell, A.D.

29 November 2002: Fax received 29 November 2002 to JRP - Unaddressed Issues.

Campbell, James

13 June 2003: Letter to JRP - Comment on date of Oral Hearing for GSXCCC Notice of Motion.

17 March 2003: Hearing Submission to JRP - Final Argument.

27 February 2003: Hearing Submission to JRP - Affidavit of James Campbell.

29 January 2003: Letter to JRP - Need for hearing and enclosing Columbia River Treaty Downstream Benefits.

9 January 2003: Letter to JRP - Comments on Province of B.C. letter dated 16 December 2002.

2 December 2002: Letter to JRP - Support of position of SPEC and DSF in their opposition to the GSX PL Motion.

27 November 2002: Letter to JRP - Minister Neufeld's radio interview on CBC.

25 November 2002: Fax to JRP - Province of B.C.'s new energy plans.

7 November 2002: Letter to JRP - Support of motion made by Tseycum First Nation.

13 August 2002: Letter to JRP - Support intervenor status of Snuneymuxw First Nation.

9 July 2002: Letter to Panel - GSX PL's disregard for important issue.

22 February 2002: Letter - Issue concerning the existing B.C. Centra Gas system.

5 December 2001: Letter of Intervention.

Campbell River, District of

Campbell River, District de

28 December 2001: Letter from Mayor James Lornie - Support of the Georgia Strait Crossing Project.

30 November 2001: Letter of acknowledgement from the Mayor of Campbell River.

Canadian Association of Petroleum Producers (CAPP)

6 December 2001: Brian Troicuk fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Canadian Parks and Wilderness Society

Société pour la protection des parcs et des sites naturels du Canada

13 September 2000: Letter to the Honourable David Anderson - GSX Pipeline Project.

13 September 2000: Letter to Mr. David Anderson - GSX Pipeline Project.

28 August 2000: Letter to NEB - Scoping Package for the GSX Project (Scope of the Assessment).

28 August 2000: Letter to NEB - Scoping Package for the GSX Project (Environmental Assessment Process).

Canfield, Carolyn

28 August 2000: E-mail to NEB - GSX Project: Environmental Assessment Scoping.

Carney, Honourable Pat

Carney, L'honorable Pat

24 August 2000: Fax to NEB enclosing copies of correspondence from the Honourable Pat Carney to the Honourable David Anderson, Minister of the Environment.

Centra Gas British Columbia Inc.

22 January 2002: Letter to JRP - Intervention Application.

Chapman, Warren

20 June 2000: Letter to NEB commenting on the Scope of the Environmental Assessment.

Christison, Ian (Morningside Farms Ltd.)

14 January 2002: Presentation made by Ian Christison, of Morningside Farms Ltd., at Public Consultation Sessions.

Christofferson, A. Marie

6 December 2001: Intervention from A. Marie Christofferson.

Citizens Stewardship Coalition

7 September 2001: Letter from Keith Wyton to Project Review Committee, Port Alberni Generation Project - Concerns about potential health, environmental and socio-economic effects of building a natural gas-fired electricity generating plant within city limits.

Cobble Hill Farm

Ferme Cobble Hill

28 August 2000: Letter to NEB received 28 August 2000 responding to NEB's request for public comment on the scope of the environmental assessment - GSX.

Coell, Murray (M.L.A.)

11 August 2000: Letter to NEB with attached letter sent to the Minister of the Environment.

9 August 2000: Letter to NEB received 9 August 2000 - GSX Scope for Environmental Assessment.

Coleman, Margaret

No date: Margaret Coleman letter to NEB - Scope for Environmental Assessment.

Coleman, Stephen

8 August 2000: Letter to NEB received 8 August 2000 - GSX Scope for Environmental Assessment.

Colwood, City of

Colwood, Ville de

12 February 2002: Letter - Council motion supporting the Georgia Straight Pipeline Project.

17 January 2002: Presentation notes of Beth Gibson, Mayor of Colwood, at Scoping Session held in Victoria.

Concerned Citizens for Clean Energy

28 August 2000: Letter to NEB - GSX Project.

Concert Properties Ltd.

13 May 2002: Letter - Compensation for Cobble Hill Quarry lands.

13 October 2000: Letter to Mr. Lou Rilkoff - Proposed Gas Line, Cobble Hill Quarry Properties, Bamberton.

27 June 2000: Brian McCauley letter to NEB expressing concern regarding proposed pipeline and lack of information for local residents and landowners.

Conrad, Norman C.

6 January 2002: Letter to JRP - Registration for Public Consultation Session.

28 August 2000: Letter to NEB commenting on the factors to be taken into consideration in the environmental assessment of the GSX Project.

Consumers' Association of Canada et al

Association des consommateurs du Canada et autres

20 June 2003: Letter from CAC(BC) to JRP - Comment on letter by Ministry of Energy and Mines, Province of B.C. dated 18 June 2003.

19 June 2003: Letter from CAC(BC) to JRP - Book of Authorities concerning GSXCCC Notice of Motion.

18 June 2003: Letter from CAC(BC) to JRP - Advising they wish to make a Submission at the Oral Hearing.

17 March 2003: Letter dted from CAC(BC) to JRP - Final Argument of CAC(BC).

24 February 2003: Letter from CAC(BC) et al to JRP - Confirmation that participation will be confined to filing arugment at end of hearing and filed evidence.

10 February 2003: Letter from CAC(BC) et al to JRP - Portion of transcript of BC Utilities Commission hearing.

4 February 2003: Letter from CAC(BC) et al to JRP - Application respecting the provision of teleconferencing facilities.

27 January 2003: Letter from CAC(BC) et al to JRP - Completeness of GSX PL materials for hearing.

11 December 2002: Letter to JRP - Support of Motion by GSXCCC.

9 December 2002: Letter to JRP - Comments on whether GSX PL Application should be set down for Hearing.

9 December 2002: Letter to JRP - Opposition to GSX PL filing GHG Offsets in confidence.

10 September 2002: Letter from British Columbia Public Interest Advocacy on behalf of CAC(BC) et al to JRP - Reply of CAC(BC) et al to Responses of GSX PL and governments of BC and AB.

1 August 2002: Letter from CAC(B.C.) et al to JRP - Notice of Motion.

9 July 2002: Letter from British Columbia Advocacy Centre on behalf of CAC et al to Panel - Application to compel GSX PL to answer Information Requests.

8 July 2002: Letter from British Columbia Advocacy Centre on behalf of CAC et al to Macleod Dixon - IR No. 2.

24 June 2002: Letter from British Columbia Public Interest Advocacy on behalf of CAC(BC) et al - 18 June 2002 letter of Mr. Howard (counsel to SPEC and DSF).

30 April 2002: Letter from British Columbia Public Interest Advocacy Centre - Response to Panel letter of 16 April 2002.

2 April 2002: Letter from British Columbia Public Interest Advocacy Centre - Oral argument on the jurisdictional questions scheduled for 9 and 10 April.

28 March 2002: Letter from British Columbia Public Interest Advocacy Centre - IR No. 1 of CAC(BC).

22 March 2002: Letter from CAC(BC) to JRP - Participation via teleconferencing.

15 March 2002: Letter from British Columbia Public Interest Advocacy Centre - Submissions of CAC(BC) et al. on the question of jurisdiction to consider environmental effects of combustion of natural gas.

14 March 2002: Letter from British Columbia Public Interest Advocacy Centre - Two points of procedure.

11 March 2002: Letter from M. Doherty on behalf of CAC(BC) - Comments on Board's letter dated 8 March 2002.

7 February 2002: Letter dated 7 February 2002 (should be 7 March 2002) from Mr. Michael Doherty of the British Columbia Public Interest Advocacy Centre on behalf of CAC(BC) - Alberta Justice request of 4 March 2002.

25 January 2002: Copy of letter from Michael P. Doherty on behalf of British Columbia Public Interest Advocacy Centre, to Arvay Finlay - Clarification of Arvay Finlay letter of 23 January 2002.

15 January 2002: Letter from Michael P. Doherty on behalf of British Columbia Public Interest Advocacy Centre - Possible need for teleconferencing facilities.

20 December 2001: E-mail from Michael Doherty on behalf of CAC(BC) et al - Registration for 11 January 2002 Public Consultation Session.

3 December 2001: Michael Doherty fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

28 August 2000: Fax to NEB enclosing a copy of their letter to the Honourable David Anderson.

28 August 2000: Letter to NEB commenting on format and draft scope of environmental assessment of GSX Project.

Cooke, Roy

16 December 2001: Letter from Roy Cooke - Objection to the proposed natural gas line.

Cowichan Tribes

Tribus Cowichan

11 March 2003: Hearing Submission to JRP - Withdrawal of Intervention.

12 December 2002: Letter to JRP - Setting hearing date for application.

28 November 2002: Letter to JRP - IR No. 18.

13 September 2002: E-mail from counsel for Cowichan Tribes to JRP -  Non-reply to GSX submissions.

1 August 2002: Fax from Ratcliff & Company for Cowichan Tribes to JRP - Notice of Motion.

9 July 2002: Letter from Ratcliff & Company on behalf of Cowichan Tribes to Panel - Notice of Motion of the Intervenor, the Cowichan Tribes.

6 June 2002: Letter from Ratcliff & Company to Department of Justice, Fisheries and Oceans - Consultation with Cowichan Tribes.

21 May 2002: Letter from Ratcliff & Company on behalf of Cowichan Tribes - Letters of 29 April and 13 May from Macleod Dixon to Panel regarding evidence of Crown consultation and new hearing schedule.

21 May 2002: Letter from Ratcliff & Company on behalf of Cowichan Tribes - Letter of 8 May 2002 from Department of Justice to Panel in respect of Crown consultation.

14 May 2002: Fax with attached letter dated 6 May 2002 from Ratcliff & Company on behalf of Cowichan Tribes - Response to Panel letter of 16 April 2002 concerning consultation and Hearing schedule.

6 May 2002: Mr. Gregory McDade, Ratcliff & Company, on behalf of Cowichan Tribes - Panel questions of 16 April, consultation and hearing schedule.

5 April 2002: Letter from Ratcliff & Company (on behalf of Cowichan Tribes) to Fisheries and Oceans Canada - Commencing consultation process.

28 March 2002: Letter from Ratcliff & Company (on behalf of Cowichan Tribes) - Cowichan Tribes IR No. 1.

20 March 2002: Letter from Ratcliff & Company (on behalf of Cowichan Tribes) - Submissions in respect of the Environmental Effects of the Combustion of Gas Proposed to be Transported.

15 March 2002: Letter from Ratcliff & Company (on behalf of Cowichan Tribes) - NEB letter soliciting comments on the merits of a workshop on First Nations interests.

11 March 2002: Letter from Ratcliff & Company (on behalf of Cowichan Tribes) - Their correspondence sent to the B.C. Ministry of Energy and Mines regarding their response to IR No. 2.

28 February 2002: Fax from Ratcliff & Company on behalf of the Cowichan Tribes - Enclosing a copy of letter of 17 January 2002 for distribution to parties.

28 February 2002: Fax from Ratcliff & Company on behalf of the Cowichan Tribes to GSX PL - Requesting copies of reports referenced in IR No. 4 response.

12 February 2002: E-mail from Ratcliff & Company on behalf of the Cowichan Tribes - Clarification of Section 36 of Rules of Practice and Procedure.

22 January 2002: Letter to JRP - Submission of speaking notes.

17 January 2002: Letter to JRP - Cowichan Hearing 02-01-15.

17 Janurary 2002: Fax from Ratcliff & Company on behalf of Cowichan Tribes to JRP General Counsel - Question of adjournment as an appropriate alternative remedy.

6 December 2001: Fax from Mr. Gregory McDade to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

5 November 2001: Letter from Mr. Gregory McDade, Ratcliff & Company, on behalf of the Cowichan Tribes - Meeting held 22 October 2001 with Joint Panel Staff.

Cowichan Valley Raging Grannies

14 January 2002: Comments from Laura Fisher on behalf of Cowichan Valley Raging Grannies.

Cowichan Valley Regional District

20 December 2001: Letter from Richard Hughes to JRP - Registration.

Crockett, Brad

7 September 2000: Fax to NEB - Availability of final scoping document for the public to review.

29 August 2000: E-mail to NEB enclosing comments for consideration by the NEB.

9 July 2000: E-mail to NEB commenting on draft scope for environmental assessment of GSX Project.

Crowder, Jean

21 August 2000: Letter to NEB submitting information that he would like considered when drafting the scope for the environmental assessment to be done for the GSX Project.

Cuthbert, Kyt

26 June 2000: Letter to NEB - Scope for Environmental Assessment.

Cuthbert, Noreen

26 June 2000: Letter to NEB - Commenting on the deadline for public submissions.

Dale, Kathryn A.

26 June 2000: Letter to NEB - Scope for Environmental Assessment.

David Suzuki Foundation (DSF) and/et

Society Promoting Environmental Conservation (SPEC)

17 March 2003: Hearing Submission to JRP - Final Arguments.

5 March 2003: Hearing Submission to JRP - Affidavit of Bohdan (Dan) Hrebenyk.

5 March 2003: Hearing Submission to JRP - Affidavit of Chris Rolfe.

25 February 2003: Hearing Submission - Revised written evidence.

18 February 2003: Letter to JRP - Affidavits for witnesses unless advised of need to cross-examine.

29 January 2003: Letter to JRP - Correction in letter of 28 January 2003.

28 January 2003: Letter to JRP - Response to Panel letter of 27 January 2003.

24 January 2003: Fax to JRP - Response to Panel's request for submissions regarding scheduling.

9 December 2002: Letter from SPEC to JRP - Comments on GSX PL confidentiality motion and submission that application be denied.

29 November 2002: Letter to JRP - Written evidence of SPEC and DSF.

27 November 2002: Letter to JRP - Delay in submitting intervenor evidence and response to GSX PL's confidentiality motion.

19 November 2002: Fax to JRP - Notice of Motion.

6 November 2002: Fax to JRP - Request that GSX answer their IR No. 2.3(f).

9 September 2002: Letter from Sierra Legal Defence Fund on behalf of SPEC and DSF to JRP - Reply Submission of SPEC and DSF on 7 September 2002 motion.

31 July 2002: Letter from SPEC and DSF to JRP - Notice of Motion to compel answer to IR.

9 July 2002: Letter from Sierra Legal Defence Fund on behalf of DSF and SPEC to Panel - Information requests and application to compel GSX to answer earlier questions.

28 June 2002: Letter from Sierra Legal Defence Fund for SPEC and DSF -  Panel letter dated 27 June 2002.

20 June 2002: Letter from Sierra Legal Defence Fund on behalf of SPEC and DSF - Request for revised List of Parties.

18 June 2002: Letter from Sierra Legal Defence Fund on behalf of SPEC and DSF - Timing and procedures for responding to IRs.

12 April 2002: Letter from Sierra Legal Defence Fund (on behalf of DSF and SPEC) - Request for extension of time for filing written evidence set for 9 May 2002.

6 April 2002: Letter dated 6 April 2002 (should be 6 May 2002) from Sierra Legal Defence Fund on behalf of DSF and SPEC - Response to Panel letter of 16 April 2002.

20 March 2002: E-mail from Mr. Tim Howard, Sierra Legal Defense Fund on behalf of DSF and SPEC - Inquiry about comments on the scope of the assessment from federal departmentt.

28 March 2002: Letter from Sierra Legal Defence Fund (on behalf of DSF and SPEC) - Information Requests.

14 March 2002: Letter from Sierra Legal Defence Fund (on behalf of DSF and SPEC) - Comments on issue of workshop on First Nations Interests.

13 March 2002: Letter from Sierra Legal Defence Fund (on behalf of DSF and SPEC) - Submissions, evidence and authorities of SPEC and DSF on the preliminary issue.

6 March 2002: Letter from Sierra Legal Defence Fund on behalf of SPEC and DSF - Opposing a request by Alberta Justice for an extension to the deadline for filing evidence by the Attorney General.

15 February 2002: Fax from Ms. Tina Reale, Sierrra Legal Defence Fund on behalf of DSF and SPEC - Confirmation of distribution list.

5 February 2002: Fax from Mr. Tim Howard on behalf of DSF and SPEC - Comments in reply to Panel letter dated 22 January 2002 regarding relief from filing requirements and the proposed technical conference.

5 February 2002: Letter from SPEC and DSF to JRP - Effects of emissions.

11 January 2002: Input to JRP from SPEC and DSF - Presentation by D. Foley at Public Consultation Session.

11 January 2002: Fax from Sierra Legal Defence Fund on behalf of SPEC and DSF - Concerns arising from Vancouver Session for GH-4-2001.

8 January 2002: Letter from SPEC and DSF to JRP - Request to participate in Consultation Sessions.

19 December 2001: Letter from Timothy Howard of Sierra Legal Defence Fund on behalf of SPEC and DSF - Correction, Sierra Legal represents Intervenor DSF.

13 November 2001: Timothy J. Howard letter to JRP -  Intervenor Status in GSX Canada Pipeline Project public hearing.

28 August 2000: Letter to NEB - Scoping Package for GSX Project, June 2000, pursuant to the Canadian Environmental Assessment Act.

Dimozantos, Michael A.

24 February 2003: Fax to JRP - Request to be reinstated as an intervenor for the purpose of submitting an oral statement at hearing.

31 January 2003: Letter to JRP - Resignation as Intervenor in GSX Public Hearing.

5 March 2002: Letter - Provincial and federal jurisdiction issues.

3 December 2001: Letter to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Dickinson, Brian

2 March 2003: Fax to JRP - Electric Power Generation Options for Vancouver Island.

Douglass, Bill

18 January 2002: Submission - Saturna Island Scoping Session.

Dricot-Fellenius

28 August 2000: E-mail to Mr. David Anderson - Environmental Assessment Process for GSX.

Dudley, Joanna

27 March 2002: Letter - Concerns regarding late intervenors.

21 January 2002: Letter to JRP - Cobble Hill presentation.

29 November 2001: Intervention.

Duke Energy Trading & Marketing, L.L.C. (DETM)

5 December 2001: Letter of Intervention from Gordon J. Smith (John & Hengerer) on behalf of DETM.

Duncan, Loren

20 December 2001: Letter to JRP - Registration for Public Consultation Session.

Dwyer, Jan et al/et autres

30 August 2000: Letters to NEB received 30 August 2000 - GSX Project Environmental Assessment Scoping: Qualifications of GSX Pipeline Limited must be verified.

Dwyer, Richard

6 December 2001: Fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Dzugalo, Ed

5 June 2002: Letter to JRP - Comments on GSX Project.

Easthope, Peter

25 August 2000: E-mail and letter to NEB requesting an Independent Panel Review.

EBA Engineering Consultants Ltd.

18 July 2002: Letter to Panel - Contracting Practices.

Eldstrom, Jewel M.

25 August 2000: Letter to NEB commenting on GSX.

Farkas, Jenny

30 August 2000: Letter to NEB received 30 August 2000 - Environmental assessment scoping considerations.

24 August 2000: E-mail to NEB - Items to be considered when drafting scope for environmental assessment.

Farrar, Chuck (Truswell Property)

Farrar, Chuck (propriété Truswell)

29 August 2000: Letter to NEB received 29 August 2000 - Truswell Landholdings with attached information.

3 July 2000: Letter from Mr. Farrar et al to NEB - Manley South Route, Manley South Route Landowners, no entry and vote form statement of landowners position.

17 June 2000: Letter to NEB - Proposed Williams/Hydro Pipeline Project.

25 May 2000: Letter to NEB - Proposed Hydro/Williams Pipeline Project (File 3200-G049-1).

21 May 2000: Letter to NEB - Hydro/Williams Pipeline Project.

16 May 2000: Letter to NEB - Hydro/Williams and NEB.

5 May 2000: Letter to NEB - Truswell Opposition to Hydro/Williams proposed right of way.

24 April 2000: Letter to NEB - Firm opposition.

22 March 2000: Letter indicating that he has notified BC Hydro that the Truswells are firmly opposed to the right of way on any part of their property and request all future correspondence be directed to him.

10 March 2000: Letter to BC Hydro in response to correspondence dated 21 February 2000 indicating that his clients Gordon and Barbara Truswell objected to the right of way on their property.

Farthing, Dr. Simon

Farthing, Dr Simon

1 September 2000: E-mail to the Honourable David Anderson - GSX Pipeline Project Environmental Assessment.

Faulkner, Susan

14 January 2002: Submission.

2 July 2000: Letter to NEB enclosing a copy of a letter she recently sent to BC Hydro.

Field, Dorothy

14 January 2002: Submission.

7 January 2002: Letter to JRP - Registration for Public Consultation Session.

Fisher, Anthony D.

18 June 2003: Letter to JRP - Intention of Participating in Hearing Notice of Motion by GSXCCC.

17 March 2003: Hearing Submission to JRP - Final Argument.

4 March 2003: Hearing Submission to JRP - Affidavit.

25 February 2003: Hearing Submission - Environment Canada 22 January 2002 News Release - Georgia Basin.

24 February 2003: Hearing Submission - Response to IR No. 21 of 20 January 2003.

20 February 2003: Letter to JRP - Document missing on Exhibit List.

3 September 2002: Letter to JRP - Response to comments of GSX PL and Province of B.C., his IRs.

17 June 2002: Letter to Panel - Panel letter dated 12 July 2002.

21 March 2002: Letter - Request for information.

27 February 2002: Letter - Panel letter dated 31 January 2002 requesting comments on its authority to consider certain environmental effects.

18 January 2002: Letter to JRP - Addition to presentation at Arbutus Ridge.

14 January 2002: Submission from A.D. Fisher at Cobble Hill.

24 December 2001: Letter to JRP - Registration and intervenor status.

3 December 2001: Letter of Intervention.

28 November 2001: E-mail to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

12 August 2000: Letter to NEB - GSX Project update August 2000.

28 July 2000: Letter to NEB received 28 July 2000 - GSX Environmental Assessment Scoping.

Fleming, Lisa and/et Harrison, Don

29 August 2000: E-mail to NEB - Concerns regarding GSX Project.

Foot, Clive and/et Paula

4 July 2000: Letter to NEB received 4 July 2000 expressing concerns - Georgia Strait Crossing Project.

Fowler, Baron

21 August 2000: Letter to NEB - Georgia Strait Natural Gas Pipeline Crossing - Environmental Assessment Scope.

Fox, Charlie

17 January 2002: Submission - Comments to JRP.

FREEe Co-op

29 August 2000: Letter to NEB received 29 August 2000 - GSX.

Freeman, Karen

26 June 2000: Letter to NEB commenting on the deadline for public submissions.

Friends of Ecological Reserves

5 December 2002: Letter to JRP - Comments on GSX Project on Ecological Reserve 67 and Georgia Strait.

9 April 2002: Letter - Request for a meeting with the Minister Responsible for Water, Land and Air Protection, Province of B.C.

Fyles, Richard A.

No date: Submission (undated) - Pender Island Scoping Session.

24 August 2000: Letter to NEB commenting on scope of environmental assessment for GSX Project.

Fyles, Shirley J.

12 January 2002: Submission - Pender Island Scoping Session.

17 August 2000: Fax to NEB - Comments on scope of environmental assessment for GSX Project and copy of letter dated 16 August 2000 to the Honorable David Anderson.

Galiano Conservancy Association

27 August 2000: Letter to NEB - GSX Pipeline.

Garcia-Meredith, Lori

28 August 2000: Letter to NEB - GSX Project, Scope of Environmental Assessment.

Gartshore, Ian E.

24 February 2003: Letter to JRP - Opposition to GSX Project.

22 April 2002: Letter - Opposition to proposed pipeline and reasons.

Gauvreau, Cherie

25 August 2000: Letter to NEB - GSX pipeline project.

Georgia Strait Alliance

25 August 2000: Letter to NEB - GSX Project Scoping Document.

Gervais, Nicole

13 August 2000: Letter to NEB - Project Environmental Review.

GSX Concerned Citizens' Coalition (GSXCCC)

18 March 2003: Hearing Submission to JRP - Final Argument.

13 March 2003: Hearing Submission to JRP - GSX Project Information Sheet No. 4, Information for Property Owners.

12 March 2003: Hearing Submission to JRP - Revisions to The Need for GSX Electricity Supply and Demand Forecasts for Vancouver Island 2002-2012.

7 March 2003: Hearing Submission to JRP - Comments on BC Hydro's public notification and timeframes.

5 March 2003: Hearing Submission to JRP - Synopsis of the Final Report from NTSB Web site.

5 March 2003: Hearing Submission to JRP - Excerpt from National Transportation Safety Board Web site.

5 March 2003: Hearing Submission to JRP - Excerpt from Transportation Safety Board of Canada Web site.

5 March 2003: Hearing Submission to JRP - Corrective Action Order from US Department of Transportation Web site.

5 March 2003: Hearing Submission to JRP - Excerpt from mywesttexas.com Web site.

5 March 2003: Hearing Submission to JRP - J.D. Hughers Report, Geological Survey of Canada.

3 March 2003: Hearing Submission to JRP - Affidavit of Mark Jaccard.

25 February 2003: Hearing Submission - List of member groups.

24 February 2003: Hearing Submission - Notice of Motion requesting leave to file new evidence.

22 February 2003: Letter to JRP - Requesting agreement on scheduling of Rob Woronuk's cross examination.

20 February 2003: Letter to JRP - Evidence, affidavits, witnesses and cross-examination.

10 February 2003: Letter to JRP - Distribution notice to all parties.

6 February 2003: Letter to JRP - Notice of Motion requesting NEB staff be made available to public one week prior to hearing.

27 January 2003: Letter to JRP - Response to request for further submissions on the scheduling of GSX hearing.

21 January 2003: Letter to JRP - Response to IR No. 31.

20 January 2003: Letter to JRP - Response to IR No. 22.

20 January 2003: Letter to GSX PL - Response to GSX PL's IR.

13 January 2003: Letter to JRP - Copies requested by Province of B.C.

6 January 2003: Letter to GSX PL - Request for reports.

19 December 2002: Fax to JRP - Reply to submission in relation to Panel's 22 November 2002 letter to parties.

18 December 2002: Letter to JRP - Fax machine out of service 19 December 2002 to 3 January 2003.

18 December 2002: Letter to JRP - Request to have listed documents distributed to all parties.

16 December 2002: Letter to JRP - Motion requesting Panel suspend the present proceedings.

11 December 2002: Letter to JRP - Support of Motion of Màiri McLennan.

11 December 2002: Letter to JRP - Application is not ready to be set down for hearing.

9 December 2002: Letter to JRP - Response to SPEC and DSF IR No. 2.3(f).

28 November 2002: Letter to JRP - Overview of written evidence.

28 November 2002: Letter to JRP - Overview of Written Evidence.

26 November 2002: Letter to JRP - Evidence in support of GSXCCC intervention.

20 November 2002: Letter to JRP - Incomplete response of GSX to GSXCCC IR No. 1.16(e).

20 November 2002: Letter to JRP - Notice of Motion requesting GSX to comply with JRP's order dated 26 September 2002.

19 November 2002: Fax to JRP - Notice of Motion to reconsider JRP 18 October 2002 Reasons.

18 November 2002: Letter to JRP - Response of GSX PL to GSXCCC IR No. 1.16(d).

18 September 2002: Letter to Macleod Dixon - Inconsistency between statements made by GSX PL.

18 September 2002: Letter from William J. Andrews, counsel for GSXCCC to JRP - Reply to ADOE response to Motions to Compel No. 1 and No. 2.

10 September 2002: Letter to JRP - Request for extension to Event Deadline for Service and Filing.

10 September 2002: Letter from William J. Andrews, counsel for GSXCCC, to JRP - Reply Submission, Motions to Compel No. 1 and No. 2.

23 August 2002: Letter to GSX PL - Request for supplemental information, Volume II, Section 4, Gas Supply.

1 August 2002: Letter to JRP - Notice of Motion with regard to date for filing Intervenors Written Evidence.

1 August 2002: Letter to JRP - Notice of Motion regarding their IR No. 2.

28 July 2002: Letter to JRP - Discontinuation of documents to Arthur Caldicott on their behalf.

9 July 2002: Letter to Macleod Dixon - Their IR No. 2.

9 July 2002: Letter to Panel - Ordering GSX PL to answer Information Requests.

8 July 2002: Letter - Panel's letter of 27 June 2002 and GSXCCC's letter of 21 June 2002.

28 June 2002: Letter from Arthur Caldicott to Panel - Wanting documents e-mailed to him as opposed to faxed.

25 June 2002: Letter to Panel - Responses to Intervenors' Information Requests.

21 June 2002: Letter - Support of 18 June 2002 letter of SPEC and DSF to Panel.

21 June 2002: Letter - Consultant contract.

18 June 2002: Letter - Panel letter of 31 May 2002.

17 June 2002: Letter to Panel - Response to IR No. 9.

6 May 2002: Letter - Response to Panel's letter of 16 April 2002 and to Applicant's comments on questions.

1 May 2002: Letter - Not receiving a copy of comments required by Applicant as mentioned in Panel letter dated 16 April 2002.

20 April 2002: Letter - Project registry and document management.

19 April 2002: Letter - Service of letter from Panel dated 16 April 2002 giving notice that the Panel has suspended the schedule for Review.

13 April 2002: Letter from Mr. Thomas Hackney, GSXCCC - Re-sending page 13 of original IR No. 1 to GSX.

3 April 2002: Letter - Project registry and document management.

1 April 2002: Letter - Distribution of documents at oral hearing.

28 March 2002: Letter - IR No. 1.

22 March 2002: Letter - Clarification regarding receipt of documentation.

20 March 2002: Letter - Authorized representative.

18 March 2002: Fax from William J. Andrews on behalf of GSXCCC - First page of affidavit from Thomas Hackney.

18 March 2002: Letter - Consultation with aboriginal peoples.

18 March 2002: Fax from William J. Andrews on behalf of GSXCCC - Affidavit of Thomas Hackney.

18 March 2002: Letter from William J. Andrews on behalf of GSXCCC - Letter submission and affidavit of Dr. Mark Jaccard.

7 March 2002: Letter from Mr. Thomas Hackney, GSXCCC - Ensuring that GSXCCC receives all documents from parties.

28 February 2002: Letter from William J. Andrews on behalf of GSXCCC - Panel letter dated 31 January 2002, regarding combustion of gas.

18 February 2002: Fax from Thomas Hackney on behalf of GSXCCC - Confirmation that Panel will provide service of documents on behalf of GSXCCC.

15 February 2002: Fax from Thomas Hackney on behalf of GSXCCC - Oral argument on the end use of gas that would be transported by GSX.

12 February 2002: Fax from Arthur Caldicott on behalf of GSXCCC - Revised submission regarding filing of certain gas supply information.

11 February 2002: Letter from Arthur Caldicott on behalf of GSXCCC - Views on filing certain gas supply information.

10 February 2002: Letter from Thomas Hackney on behalf of GSXCCC - Pre-hearing technical conference.

8 February 2002: Letter from Thomas Hackney on behalf of GSXCCC - Authorized representatives.

1 February 2002: E-mail from Thomas Hackney on behalf of GSXCCC - Service of submissions of Intervenors by NEB.

29 January 2002: Letter from Thomas Hackney on behalf of GSXCCC - Various requests.

25 January 2002: E-mail from Thomas Hackney on behalf of GSXCCC and Sierra Club of B.C. - Intervenor status.

23 January 2002: E-mail from Arthur Caldicott on behalf of GSXCCC - Electronic copies of documents.

17 January 2002: Submission from Thomas Hackney on behalf of GSXCCC - Comments on Issues for consideration by the JRP.

9 January 2002: Letter from Thomas Hackney on behalf of GSXCCC - Proposed format of Public Consultation Sessions.

3 January 2002: Letter to JRP - Duplication of intervenors.

17 December 2001: E-mail from Mr. Arthur Caldicott, GSXCCC - Questions about the Consultation Sessions.

5 December 2001: Steve Miller fax to JRP on behalf of GSXCCC - Intervenor Status in GSX Canada Pipeline Project public hearing.

12 November 2001: Thomas Hackney e-mail to CEAA - Participant funding program.

28 October 2001: Letter from Mr. Thomas Hackney, GSXCCC - Procedural questions.

Guay, Dominique

13 June 2003: Letter from GSXCCC to JRP - Confirmation of Oral Submission at Hearing on 23 June 2003.

12 June 2003: Letter from GSXCCC to JRP - Scheduling problem - June 23.

4 June 2003: Letter from GSXCCC to JRP - Motion to hear TGVI evidence.

26 November 2002: Letter to JRP - Clarification of GSX's response to GSXCCC IR No. 1.16(e).

7 November 2002: Letter to JRP - Notice of Motion for applicant to comply.

7 November 2002: Fax to JRP - Receipt of letter dated 6 November 2002 from counsel to SPEC and DSF requesting response to their IR No. 2.3(f).

5 November 2002: Letter to JRP - Response to IR No. 15.

30 August 2000: Letter to NEB received 30 August 2000 - GSX Project: Environmental Assessment Scoping.

Gulf Crab Fishers Association

18 March 2003: Hearing Submission to JRP - Final Argument - In consideration of crabs and marine environment.

25 April 2002: Letter - GSX PL proposed trenching measures.

18 January 2002: Letter from Bill Douglass on behalf of Gulf Crab Fishers Association - Comments on scope of GSX review.

17 November 2001: William Douglas fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

18 August 2000: Letter to NEB - GSX.

Haines, M.

20 November 2001: Letter of Comment to JRP.

Hamilton, Rodger

14 January 2002: Presentation by Rodger Hamilton at Cobble Hill.

Hawkins, Ron

23 January 2002: E-mail - GSX Pipeline Proposal to Vancouver Island.

23 January 2002: E-mail - Columbia River Treaty downstream benefits.

Hayduke, George

2 October 2000: Package received containing BC Hydro Bulletin No. 1 and Times Colonist article of 21 September 2000 - Energy decision-makers follow wrong path.

Haywood, David

27 November 2001: Fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Henley, Michael

24 January 2002: Letter to JRP - Submission guidelines.

Hennell, Valerie

27 March 2002: E-mail - Opposition to Georgia Straight Crossing and gas power plant in Nanaimo.

Hertzog, Stuart

17 January 2002: Presentation and submission - Comments on the proposed routing and the safety of travellers to and from Vancouver Island.

Hillsborough Resources Limited

21 February 2003: Letter to JRP -  Observer and statements at hearing.

Hillyer, Ann

28 August 2000: E-mail to Mr. David Anderson - Environmental Assessment for GSX.

Hodges, Ann

5 December 2001: E-mail - Letter of Comment.

Hood, Phyllis

14 January 2002: Presentation made by Ms. Phyllis Hood at the Public Consultation Sessions.

1 August 2000: Letter to NEB received 1 August 2000 - Environmental Assessment of the GSX Pipeline Project.

Horton Family, R.L.

25 April 2000: Ken Horton fax to Ray Belot - Public Information Session.

23 April 2000: Ken Horton letter to BC Hydro - Airstrip Route.

18 April 2000: Ken Horton fax to NEB - Airstrip Route.

12 April 2000: Letter from Ken L. Horton to BC Hydro indicating that they are opposed to the route through their farm.

Hughes, Richard

14 January 2002: Presentation by Richard Hughes at Cobble Hill.

4 January 2002: Letter to JRP - Cobble Hill public meeting schedule.

20 December 2001: E-mail from Richard Hughes on behalf of the CVRD - Cobble Hill meeting.

6 December 2001: Fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

28 September 2000: E-mail to NEB - Letter sent to NEB dated 27 August 2000.

28 August 2000: E-mail to Mr. David Anderson - Cobble Hill excluded from the consultation process.

25 August 2000: Fax to NEB - GSX Project.

17 August 2000: E-mail to Mr. David Anderson - GSX Pipeline Project Environmental Assessment.

Huneck, Lavonne

14 January 2002: Presentation by Lavonne Huneck at Cobble Hill.

Hupacasath First Nation

Première nation Hupacasath

14 January 2002: Presentation made by Judith Sayers, Chief Councillor, on behalf of the Hupacasath First Nation at the Public Consultation Sessions.

10 January 2002: E-mail from Chief Councillor Judith Sayers, on behalf of the Hupacasath First Nation - Cobble Hill presentation.

7 January 2002: Letter to JRP - Request to register for submission.

Imperial Oil Resources

Pétrolière Impériale Ressources Limitée

3 December 2001: Letter of Intervention from Mr. C. Brian Woods, on behalf of Imperial Oil Resources.

Islands Trust Council

Conseil d'Islands Trust

28 February 2003: Hearing Submission to JRP - Affidavit and CV of David Essig with supplemental information.

21 January 2003: Letter to JRP - Response to IR No. 27.

10 January 2003: Letter to GSX PL - Documents filed by Islands Trust Council.

25 November 2002: Letter to JRP - Intervenor Evidence and attachments.

12 February 2002: Fax from David Essig on behalf of the Islands Trust Council - Pre-hearing technical conference.

13 December 2001: Letter from David Essig on behalf of Islands Trust Council - Session on North Pender Island.

6 December 2001: Intervention from David Essig, Chair, Islands Trust Council.

5 December 2001: Letter from Wayne H. Wright and Em Round, North Pender Island Local Trustees on behalf of the Islands Trust - Request to hold a Public Consultation Session on North Pender Island.

26 November 2001: Letter of Comment from David Essig, Chair, Islands Trust Council.

22 August 2000: Letter to the Honourable David Anderson - Georgia Strait Proposed Gas Pipeline.

17 August 2000: Letter to NEB - Proposed Natural Gas Pipeline.

25 July 2000: Letter to NEB - Comments on Scope of Environmental Assessment for GSX.

28 June 2000: David Essig fax to NEB requesting Intervenor Status - Proposed natural gas pipeline.

Johnson, Richard

24 August 2000: Letter to NEB received 24 August 2000 - Georgia Strait Natural Gas Pipeline Crossing - Project assessment.

Kaller, E.

5 December 2001: Letter of Comment.

Kean, Brian and/et Laura

25 August 2000: Fax to NEB advising that they are opposed to the location of the proposed GSX Pipeline route.

Keller, Ralph

14 January 2002: Presentation made by Ralph Keller, B.C. Green Party at the Public Consultation Sessions.

Kendrick, Bryce

15 January 2002: E-mail - Five considerations for Panel.

Kimmett, Leslie

9 August 2000: E-mail to David Anderson - GSX Pipeline Project Environmental Assessment.

Knowles, Diana

24 February 2003: Hearing Submission - Wish to speak at hearing either as a statement or to make final arguments.

27 January 2003: Letter to JRP - Readiness of project application to proceed to hearing.

14 August 2002: Letter to JRP - Supporting Notices of Motion by other intervenors.

2 April 2002: Letter - Not speaking before the Panel.

10 March 2002: Letter - Request that Panel distribute documents on her behalf.

27 February 2002: Letter - Comments on questions about whether the Panel has the authority to consider certain effects.

22 January 2002: Letter to JRP - Intervention.

Kulikowsky, Dave et al/et autres

29 August 2000: Letters to NEB - GSX Pipeline Project, Scope for Environmental Assessment.

La Flam, Guy

6 January 2002: Letter to JRP - Registration for Public Consultation Session.

Lamb, Alan

1 March 2002: Letter of Comment - Support for GSX Project.

Lamb, Peter

4 September 2000: Letter to NEB - Georgia Strait Natural Gas Pipeline Crossing.

Land Reserve Commission

14 March 2003: Letter to JRP - Terms and conditions relating to construction and design.

Lane, Arne H.

23 February 2002: Letter of Comment - Support for GSX Project.

Lappin, Jack

14 January 2002: Comment submitted at Public Consultation Sessions.

Legg, George

5 February 2003: E-mail to JRP - Letter of Comment.

LeSeur, Joan

3 February 2003: Letter to JRP - Withdrawal of Intervenor Status.

11 February 2002: Fax - Filing of certain gas supply information.

22 January 2002: Letter to JRP - Intervention application.

14 January 2002: Submission made by Joan LeSeur at Public Consultation Sessions.

Levitt, Maureen

7 January 2002: E-mail - Presentation at Cobble Hill.

Life On Earth

20 November 2001: Ralph C. Goodwin e-mail to CEAA - Information required to proceed to file a funding application.

14 November 2001: Ralph C. Goodwin e-mail to JRP - Application documents and procedural information to acquire intervenor status.

MacDonald, J.C.F.

22 February 2002: Letter of Comment - Support of GSX Project.

McDonald, J.A.

28 February 2002: Letter of Comment - Support for GSX Project.

Maher, Kevin

29 December 2001: E-mail - Consultation Session in Cobble Hill on 14 January 2002.

17 March 2000: Letter commenting on how B.C. Hydro is conducting its public notification prior to selecting a final route.

Malcolmson, Claire

12 December 2001: Letter to JRP - Opposition to GSX Project.

Marchant, Philip

14 January 2002: Presentation made by Phil Marchant at Public Consultation Sessions.

4 January 2002: Letter to JRP - Double intervention.

27 November 2001: Fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

3 August 2000: Letter to NEB received 3 August 2000 commenting on GSX Project.

Marek, Tom

26 August 2000: Letter to NEB - GSX Project.

Martin, Bo

7 January 2002: Letter to JRP - Registration for Public Consultation Session.

Mayba, John

14 January 2002: Presentation by John Mayba at Cobble Hill.

McLennan, Màiri

17 June 2003: Letter to JRP - Confirmation of attendance at Hearing for Notice of Motion by GSXCCC.

8 June 2003: Letter to JRP - Support for Notice of Motion filed by GSXCCC.

17 March 2003: Hearing Submission to JRP -  References and Supplementary Notes.

13 March 2003: Hearing Submission to JRP - Excerpt from Natural Resources Canada Web site - Magnitude 7.0 Vancouver Island Earthquake of 1918.

13 March 2003: Hearing Submission to JRP - Excerpt from Canada.com - B.C. Scientists Believe They Can Predict Next 'Big One'.

13 March 2003: Hearing Submission to JRP - Excerpt from Canada.com - 'Deal May Drive BC Hydro Rates Up'.

13 March 2003: Hearing Submission to JRP - Debates of the Legislative Assembly - Province of B.C. Afternoon Sitting, Volume II, No. 16.

13 March 2003: Hearing Submission to JRP -  Letter from GSX PL to B.C. Ministry of Water, Land and Air Protection, B.C. Ecological Reserve 67.

13 March 2003: Hearing Submission to JRP -  B.C. Parks, GSX Project - Record of Conversation, Meeting Notes.

13 March 2003: Hearing Submission to JRP - E-mail titled Heads up - BC Hydro/Williams Propose a second natural gas pipeline crossing.

13 March 2003: Hearing Submission to JRP - Excerpt from Natural Resources Canada Web site - Giant Megathrust Earthquake.

13 March 2003: Hearing Submission to JRP -  Excerpt from bcstats.gov.ab.ca Web site - B.C. Development Region July 1 Population Estimates and Projects 1986-2031.

13 March 2003: Hearing Submission to JRP -  Excerpt from bcstats.gov.ab.ca Web site - Vancouver Island Population Estimates.

13 March 2003: Hearing Submission to JRP - Excerpt from Natural Resources Canada Web site - Magnitude 7.3 Vancouver Island Earthquake 1946.

13 March 2003: Hearing Submission to JRP -  Debates of the Legislative Assembly, Province of B.C. Morning Sitting, Volume 12, No. 1.

11 March 2003: Hearing Submission to JRP -  Affidavit of Màiri McLennan.

7 March 2003: Hearing Submission to JRP - BC Hydro News Release - Vancouver Island First Power Smart Region.

3 March 2003: Hearing Submission to JRP - Appointment of proxy representative.

28 February 2003: Hearing Submission - Mr. Skerik acting as proxy for Màiri McLennan.

26 February 2003: Hearing Submission - Attendance and representative authorization dated 24 February 2003.

24 February 2003: Hearing Submission - Notice of Motion regarding scheduling changes.

18 February 2003: Fax from Màiri McLennan and Shadybrook Farms to JRP - Notice of Motion regarding evidence.

28 January 2003: Letter to JRP - Readiness for Hearing - VIGP News Release.

24 January 2003: Letter to JRP - Compliance with JRP timelines and procedural criteria.

21 January 2003: Letter to JRP - Response to IR No. 23.

30 December 2002: Letter to JRP - Error in reply submission dated 20 December 2002.

20 December 2002: Letter to JRP - Reply submission to responses concerning Notice of Motion dated 18 November 2002.

9 December 2002: Letter to JRP - Comments regarding SPEC and DSF IR No. 2.3(f).

9 December 2002: Letter to JRP - Comments of whether GSX PL application is ready to be set down for hearing.

28 November 2002: Letter to JRP - Preliminary Submission concerning evidence to be presented.

18 November 2002: Letter to JRP - Notice of Motion.

18 September 2002: Letter to JRP - Reply submission: ADOE submission of 29 August 2002.

9 September 2002: Letter to JRP - Reply Submission, Unanswered IRs and Evidence Deadline.

14 August 2002: Letter to JRP - Unanswered Information Requests.

1 August 2002: Letter to JRP - Unanswered IRs and Intervenor Evidence Deadline

8 July 2002: Letter to Panel - Unanswered Information Requests.

8 May 2002: Letter - Further comments on Crown consultation and new schedule and date for the hearing.

7 May 2002: Letter - Comments on Crown consultation and new schedule and date for the hearing.

12 April 2002: Letter - Motion to extend deadline of responses.

28 March 2002: Letter - Information requests.

25 March 2002: Letter - Objection to letter of Christopher Jones on behalf of Province of B.C.

8 March 2002: Fax enclosing copy of submission dated 28 February 2002.

22 January 2002: Letter - Comments to List of Issues.

7 January 2002: Letter to JRP - Registration.

5 December 2001: Fax to JRP -  Intervenor Status in GSX Canada Pipeline Project public hearing.

McMahon, Martha

24 January 2002: Letter - Consultation process considerations.

Meeres, Margaret

18 January 2002: Submission, Saturna Island Scoping Session.

8 August 2000: Letter to NEB received 8 August 2000 - Comments on Scope of Environmental Assessment for GSX.

Miles, Justine

17 January 2002: Presentation notes - Scoping Session in Victoria.

7 January 2002: Letter to JRP - Registration for Public Consultation Session.

Miller, Dusty

17 January 2002: Presentation and submission - Scoping Session in Victoria.

15 January 2002: E-mail - Request to be one of first presenters.

15 January 2002: E-mail - Presentation in Victoria.

Minvielle, Ed

22 September 2000: E-mail to NEB - Propaganda sheet.

Mirant Canada Energy Marketing, Ltd. (Mirant)

6 December 2001: Intervention from Tomaz Lange on behalf of Mirant.

Mitchell, Jennifer

3 August 2000: Letter to NEB received 3 August 2000 - GSX Scope for Environmental Assessment.

Mortimer, Kate

15 January 2002: Letter of Comment.

Morton, E. Ralph

21 November 2002: Letter to JRP - His wish to make a written comment rather than present at the oral hearing.

3 December 2001: Intervention.

24 August 2000: Fax to NEB - Scope of environmental assessment for GSX Project.

Motherwell, Aueril

7 July 2000: Letter to NEB enclosing a copy of a letter recently sent to BC Hydro.

Nanaimo, City of

Nanaimo, Ville de

18 February 2002: Fax - Council motion supporting the Vancouver Island Electricity Generation Project and the Georgia Straight Crossing Pipeline Project.

Nanoose Property Owners and Residents Association

17 June 2003: Letter to JRP - Notice of Motion of GSXCCC.

Newman, Virginia

16 November 2001: Letter of Comment.

Norris, George and/et Phylis

14 January 2002: Presentation made by George and Phyllis Norris at Public Consultation Sessions.

NorskeCanada Limited

6 March 2003: Letter to JRP - Invitation to reconsider decision not to call a witness.

18 February 2003: Letter to JRP - Request for late intervenor status.

Northern Pipeline Projects Ltd.

5 January 2002: Letter to JRP - Registration.

4 December 2001: Letter of Intervention from Mr. Doug Anguish, on behalf of Northern Pipeline Projects Ltd.

Olynyk, Jane

10 March 2002: Letter - Concerns with harmful effects of project.

Outer Gulf Island Electoral Area

District électoral des îles du Golfe extérieures

24 August 2000: Fax to the Honourable David Anderson - Independent panel review of GSX Project.

Parker, John L.

11 March 2003: Letter to JRP - Unable to attend hearing, request Dodie Miller read prepared statement.

23 January 2002: Intervention.

Patchett, Brenda

5 October 2000: Letter to the Minister of Environment - BC Hydro Proposed GSX Project.

Paxman, Marvin G.

30 June 2000: Fax to NEB - Scope for Environmental Assessment.

Pender Islands Conservancy Association

19 January 2002: Submission from Ms. Sara J. Steil on behalf of the Pender Islands Conservancy Association.

19 January 2002: Submission from Don Harrison on behalf of the Pender Islands Conservancy Association - Consultation Session comments.

Pender Islands GSX Coalition

11 November 2002: Letter to JRP - Request for extension of deadline for filing intervenor evidence.

31 August 2002: Letter to JRP -  Disagreement with Province of B.C. reply to the motion to compel answers on electricity generation.

2 July 2002: Letter - Participation in Marine Pre-Hearing Technical Conference.

1 February 2002: E-mail from Sara J. Steil on behalf of the Pender Islands GSX Coalition - Letter to Panel from Arvay Finlay dated 23 January 2002.

28 January 2002: E-mail from Sara J. Steil on behalf of Pender Islands GSX Coalition - Inquiry, intervenor status.

19 January 2002: Submission from Sara J. Steil, Pender Island Scoping Session.

16 January 2002: Letter to JRP - Intervenor status.

21 December 2001: Letter to JRP -  Withdrawal of intervenor status.

21 December 2001: Letter to JRP -  Registration.

15 November 2001: Fax from Sara J. Steil to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Peramaki, B.L.

18 January 2002: Presentation notes, Saturna Island Scoping Session.

Petition Form Letters

17 March 2003: Hearing Submissions to JRP -  Form letters urging Panel to reject pipeline application.

Positive Energy Quilters

13 March 2003: Hearing Submission to JRP - Letter of Comment and petition on GSX Pipeline Project.

Powerex Corp.

18 July 2002: Letter to JRP - Revisions to regulatory schedule.

6 December 2001: Brian Moghadam fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Randall, Paul

28 August 2000: Fax to NEB - Comments on scope of Environmental Assessment for GSX Project.

Rankin, Susan

24 August 2000: Letter - Environmental Assessment Scoping.

8 July 2000: Letter - Scope for Environmental Assessment.

Rencher, Craig

3 July 2000: Fax to NEB - Proposed natural gas pipeline.

Roberts, Isabel

22 January 2002: Letter to JRP - Pender Island.

19 January 2002: Submission - Pender Island Scoping Session.

6 September 2000: Letter to NEB received 6 September 2000 - Concerns about the Project.

26 August 2000: E-mail to NEB - Concerns she would like to put to the Board about the Project.

Ronald, Peter

28 August 2000: E-mail to NEB - GSX Project Scoping Document.

Rose, Mary

20 February 2002: Letter of Comment - Protest extension of a gas pipeline to Vancouver Island.

Rumble, John and/et Heather

30 August 2000: Fax to NEB requesting an independent panel review, not a comprehensive study, 23 August letter attached.

23 August 2000: Letter to NEB - GSX Project.

Rundall, Phil

30 August 2000: Letter to NEB - Scope for Environmental Assessment.

Saanich Inlet Protection Society

17 January 2002: Letter to JRP -  Public Consultation Session.

Salt Spring Island Conservancy

7 January 2002: Letter to JRP -  Registration for Public Consultation Session.

5 September 2000: Letter to NEB received 5 September 2000 - Georgia Strait Natural Gas Pipeline Crossing - Environmental Assessment Scope.

Saturna Community Club

Club communautaire Saturna

19 February 2003: Letter from Saturna Community Club (Marine Coalition) to JRP - Evidence, Witnesses, cross-examination.

9 December 2002: Letter to JRP - Application is not ready to be set down for hearing.

28 November 2002: Letter to JRP - Direct Evidence of the Marine Coalition.

8 November 2002: Letter to JRP - Notice of Motion to extend date for filing intervenor evidence.

9 September 2002: Letter from Saturna Community Club et al to JRP - Further comment on filing of intervenor evidence.

9 September 2002: Letter to JRP -  Relevance of Evidence and unanswered IRs.

9 July 2002: Letter to JRP - Compelling GSX PL to answer questions in their 23 March 2002 letter.

26 June 2002: Letter - Participation in pre-hearing technical conference.

24 June 2002: Letter - No response to their information request of 23 March 2002.

19 June 2002: Letter - Consulting services.

23 March 2002: Letter - Information Request on marine portion.

23 March 2002: Letter from Mr. Ian Smyth on behalf of the Saturna Community Club - Panel IR No. 5 to GSX PL and request for information regarding other electricity supply options.

18 March 2002: Letter - Consultation with aboriginal peoples.

19 January 2002: Presentation notes from C. Barnett on behalf of the Saturna Community Club - Saturna Island Scoping Session.

19 December 2001: E-mail from Susie Washington Smyth on behalf of Saturna Community Club - Wish to clarify that they are part of three separate applications for intervenor status with respect to GH-4-2001.

17 December 2001: Letter to JRP - Style of public consultation.

16 December 2001: Letter to JRP - Alternate contact.

4 December 2001: Intervention from Mr. Ian Smyth and Mr. Cunliffe Barnett, on behalf of the Saturna Community Club.

23 November 2001: Letter from Susie Washington Smyth on behalf of Saturna Community Club to JRP - Request to consider sponsorship of a pre-hearing conference on the marine portion of the Georgia Strait Crossing pipeline application.

No date: Undated information request to JRP - Questions for the GSX JRP Secretariat.

19 November 2001: E-mail from Susie Washington Smyth to JRP - Tour of Saturna Island.

24 August 2000 - Fax to NEB - GSX Project.

22 June 2000: Letter from Cunliffe Barnett to NEB -  Scoping for Georgia Strait Crossing Project.

Saturna Marine Coalition

17 June 2003: Letter to JRP - Unable to attend Hearing of Notice of Motion by GSXCCC but supports Motion.

18 March 2003: Hearing Submission to JRP - Final Arguments.

10 March 2003: Hearing Submission to JRP - Parks Canada News Release - Action Plan to protect Canada's Natural Heritage.

10 March 2003: Hearing Submission to JRP - Excerpt from CEAA Web site - Operation Policy Statement.

10 March 2003: Hearing Submission to JRP - Affidavit of William Morgan Douglass.

10 March 2003: Hearing Submission to JRP - Affidavit of Susie Washington Smyth.

10 March 2003: Hearing Submission to JRP - Affidavit of Katherine Dunster.

5 March 2003: Hearing Submission to JRP - B.C. Coastal Waterbird Survey - Canadian Wildlife Service.

5 March 2003: Hearing Submission to JRP - Affidavit of David Aldcroft.

5 March 2003: Hearing Submission to JRP - Copy of CEAA Report.

4 March 2003: Hearing Submission to JRP -  Article from Nature Magazine, Volume 421.

4 March 2003: Hearing Submission to JRP -  Excerpt from the Great Blue Heron by R.W. Butler.

4 March 2003: Hearing Submission to JRP -  Excerpts from Fisheries and Oceans Canada Web site.

4 March 2003: Hearing Submission to JRP -  Report entitled Opportunities for using Navy marine mammals to explore associations between organochlorine contaminants and unfavourable effects on reproduction.

4 March 2003: Hearing Submission to JRP -  High intensity anthropagenic sound damages fish ears by Robert McCauley.

21 January 2003: Letter to JRP - Response to GSX PL Information Request.

14 November 2002: Fax to JRP - Response to GSX PL letter of 13 November 2002.

8 November 2002: Letter to JRP - Response of GSX PL to Marine Coalition 7 November 2002 Notice of Motion.

7 November 2002: Letter to JRP - Notice of Motion of the Marine Coalition.

6 May 2002: Letter from Ms. Susie Washington Smyth on behalf of the Saturna Marine Coalition - Comments in reply to Panel letter of 16 April 2002, crown consultation and appropriate new schedule.

20 March 2002: E-mail of from Ms. Susie Washington Smyth, on behalf of the Saturna Marine Coalition - Away 24 March to 5 April, alternate contact K. Symington.

8 February 2002: Fax from Susie Washington Smyth and William Douglass, on behalf of the Saturna Community Club, Gulf Crab Fishers Association, Pender Islands Conservancy Association, Salt Spring Island Conservancy, Saanich Inlet Protection Society, Canadian Parks and Wilderness Society (B.C. Chapter), Georgia Straight Alliance - Pre-hearing technical conference.

30 January 2002: E-mail from Susie Washington Smyth of the Saturna Community Club on behalf of various associations - Pre-hearing conference.

16 December 2001: Letter from Saturna Community Club et al to JRP -  Alternate contact.

30 November 2001: Intervention from Susie Washington Smyth, on behalf of the Saturna Community Club, Pender Islands Conservancy Association, Salt Spring Island Conservancy, Saanich Inlet protection Society, Georgia Strait Alliance and Canadian Parks and Wildernes Society (B.C. Chapter).

23 November 2001: Intervention and letter from Susie Washington Smyth, on behalf of Saturna Community Club, Pender Island Conservancy Association, Canadian Parks and Wilderness Society, Georgia Strait Alliance and Salt Spring Conservancy.

Scott, Rowena

4 January 2002: Letter to JRP - Registration for Public Consultation Session.

Sencot'en Alliance

11 March 2003: Letter to JRP -  Withdrawal of intervention.

27 February 2003: Letter to JRP - Notice of Motion dated 17 February 2003 is withdrawn.

21 February 2003: Letter to JRP - Possibility of withdrawing their intervention: will confirm intentions.

17 February 2003: Letter to JRP - Notice of Motion - Crown Consultation.

27 January 2003: Letter to JRP - Support of submission filed by SPEC and DSF on 27 January 2003.

6 January 2003: Letter to JRP - IR No. 25.

11 December 2002: Letter to JRP - Support of Motions of GSXCCC and Màiri McLennan.

9 December 2002: Letter to JRP - Application is not ready to set down for hearing.

5 December 2002: Fax to JRP - Page 54 missing from Affidavit No. 2 of Sharon Charles.

27 November 2002: Letter to JRP - Affidavits that comprise Sencot'en Alliance written evidence.

10 September 2002: Letter from Mandel Pinder on behalf of Sencot'en Alliance to JRP - Reply comments on the Motion to Compel GSX PL to answer IRs.

1 August 2002: Letter from Mandell Pinder for Sencot'en Alliance - Notice of Motion regarding date for filing Intervenors evidence.

9 July 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance to Panel - Signed letter replacing previous unsigned letter.

9 July 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance to Panel - Information Requests on the Combustion of Gas.

9 July 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance to Panel - Application to compel GSX PL to answer information requests.

4 July 2002: Letter from Mandell Pinder for Sencot'en Alliance - Crown consultation and request revision in current schedule.

2 July 2002: Letter - Response to Panel's letter of June 27, 2002.

17 May 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance - Independent Power Producers Review Panel's Report.

6 May 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance - Response to Panel's letter dated 16 April 2002.

4 April 2002: Letter from Ms. Brenda Gaertner, Mandell Pinder on behalf of the Sencot'en Alliance - Names of experts for Pre-hearing conference.

9 April 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance - Map of territories.

28 March 2002: Letter from Mandell Pinder on behalf of Sencot'en Alliance - Information Requests.

18 March 2002: Fax with letter of 15 March from Mandell Pinder on behalf of Sencot'en Alliance - Workshop on First Nations interests.

14 February 2002: Fax from Mandell Pinder on behalf of Sencot'en Alliance - Panel's jurisdiction to consider environmental effects of combustion of gas.

12 February 2002: Fax from Mandell Pinder on behalf of Sencot'en Alliance - Filing of certain gas supply information.

12 February 2002: Fax from Mandell Pinder on behalf of Sencot'en Alliance - Comments on pre-hearing technical conference.

8 February 2002: Letter from Brenda Gaertner of Mandell Pinder on behalf of Sencot'en Alliance - Identification of contact.

23 January 2002: Letter from Brenda Gaertner of Mandell Pinder on behalf of Sencot'en Alliance - Comments on List of Issues.

8 January 2002: E-mail from Brenda Gaertner of Mandell Pinder on behalf of Sencot'en Alliance - Request to participate in the Consultation Sessions on January 12, 2002.

8 January 2002: Letter to JRP - Late registration.

6 December 2001: Intervention from Sharon Charles, Chairperson, on behalf of Sencot'en Alliance.

Shadybrook Farm

Ferme Shadybrook

18 June 2003: Letter to JRP - Intention of presenting Oral Argument in support of GSXCCC Notice of Motion.

18 June 2003: Letter to JRP - Advising they will be making Oral Submission in Support of GSXCCC Notice of Motion.

18 March 2003: Hearing Submission to JRP - Final Argument.

27 February 2003: Hearing Submission to JRP - Natural Gas Prices - History and Forecast - Sproule Web site.

24 February 2003: Hearing Submission - Vancouver Sun, 24 February 2003 article by Scott Simpson.

24 February 2003: Hearing Submission - Notice of Motion regarding scheduling changes dated 23 February 2003.

29 January 2003: Fax to JRP - Notice of Motion.

28 January 2003: Letter to JRP - Response to inquiry concerning readiness of application for hearing.

24 January 2003: Letter to JRP - Status of Vancouver Island Generation Project.

10 December 2002: Letter to JRP - Comments on Motions of GSXCCC and Màiri McLennan.

27 January 2002: Letter from Steve Miller on behalf of Shadybrook Farms - Panel letter dated 25 January 2002.

26 January 2002: E-mail from Steve Miller on behalf of ShadyBrook Farm to Christopher Jones - Contact information.

6 January 2002: Letter to JRP - Registration.

14 January 2002: Presentation made by Dodie Miller at Public Consultation Sessions.

31 December 2001: E-mail from Steve Miller on behalf of Shadybrook Farms - Public consultation Questions and Answers.

29 December 2001: E-mail from Steve Miller on behalf of Shadybrook Farms - Panel letter dated 18 December 2001.

6 December 2001: Intervention from Steve and Dodie Miller, on behalf of Shadybrook Farm.

18 September 2000: E-mail to NEB - NEB decision - GSX Project.

15 September 2000: E-mail to NEB entitled Jumping the Gun.

30 August 2000: Letters to NEB received 30 August 2000 - Environmental Assessment Scoping.

26 August 2000: Fax to NEB - GSX Project: Environmental Assessment Scope.

19 July 2000: Letter from Steve and Dodie Miller to NEB - Part V of the NEB Act.

30 June 2000: Letter from Steve and Dodie Miller to NEB - Scope for Environmental Assessment.

12 June 2000: Letter from Steve and Dodie Miller to NEB - Early Public Notification.

19 April 2000: Letter from Steve Miller to NEB - Georgia Strait Crossing Project.

Shephard, G.P.

30 November 2001: Fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Sierra Club of British Columbia

17 January 2002: Submission, Victoria Scoping Session.

11 September 2000: Letter to the Honourable Herb Dhaliwal - CEEA.

24 August 2000: Letter to NEB responding to Scoping Package for GSX Project.

15 June 2000: Sierra Club letter to Project Manager, Georgia Strait Crossing Project - Environmental consequences.

28 March 2000: Letter of Comment.

Skerik, Don et al/et autres

18 March 2003: Hearing Submission to JRP - Final Argument.

11 December 2002: E-mail to JRP - Alternatives to Project.

24 July 2002: Letter to JRP - Notice of Motion to compel answers to IRs.

27 March 2002: E-mail to JRP - List of Questions.

25 February 2002: E-mail attaching 3 documents, including: comments dated 18 February 2002 regarding the Panel's authority to consider certain environmental effects; and comments dated 18 February regarding GSX's request for relief of Filing of Certain Gas Supply Information.

14 January  2002 : Submission at Cobble Hill.

1 January 2002: E-mail - Clarification of intervention.

2 December 2001: Fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

21 August 2000: Letter to NEB presenting some items to be considered when drafting the scope for the environmental assessment for the GSX Project.

8 August 2000: E-mails to the Honourable David Anderson and the NEB - GSX Pipeline Project Environmental Assessment.

Smith, Susan M.

8 December 2001: E-mail to CEAA - Comments on GSX.

21 June 2000: Letter to NEB commenting on recent meeting regarding proposed pipeline.

Smyth, Ian and Susie Washington

No date: E-mail from Ms. Susie Washington Smyth on behalf of herself - Comments regarding whether the Panel has the authority to consider end use impacts.

28 August 2000: Letter to NEB responding to the Scoping Package of the GSX Project and expressing their concern about the approach to the environmental assessment being taken.

Snuneymuxw First Nation

3 January 2003: Letter to JRP - Response to IR No. 34.

10 December 2002: Letter to JRP - Interim Report on Status of Review and Outstanding Issues.

27 November 2002: Letter to JRP - Response to IR No. 18.

27 November 2002: Letter to JRP - Reports by Dr. Bates as part of Snuneymuxw's written evidence.

18 July 2002: Letter received 2 August 2002 to JRP - Request for Intervenor Status.

Sterk, Jane

17 January 2002: Presentation , Victoria Scoping Session.

Stobbart, Marcia

14 January 2002: Submission from Marcia Stobbart at Cobble Hill.

Storey, Randy

25 October 2002: E-mail to JRP - Comments on GSX Project.

Summit Strategies

21 August 2000: Letter to NEB - Georgia Strait Natural Gas Pipeline Crossing - Environmental Assessment Scope.

Sustainable Communities Consultancy

28 August 2000: Letter to NEB - Assessment of the Georgia Strait Natural Gas Pipeline Crossing.

Swan, Pat et al/et autres

29 August 2000: Letters to NEB received 29 August 2000 - GSX Project, Environmental Assessment Scoping, Qualifications of GSX Pipeline Limited.

Swierenge, Sabine H.H.

29 August 2000: Letter to NEB received 29 August 2000 - GSX Project, Environmental Assessment Scoping.

Taffan, Gordon

27 August 2000: E-mail to NEB - Request to B.C. Hydro for a public meeting be added to their agenda for the Sunshine Coast.

Tancock, Kat

9 August 2000: E-mails to NEB and the Honourable David Anderson - GSX Project, Environmental Assessment Scoping.

Taylor, Graeme

18 January 2002: Letter to JRP - Concerns about GSX Project.

Taylor, Jill

19 January 2002: Presentation, Pender Island Scoping Session.

25 July 2000: Letter to NEB received 25 July 2000 - Comments on Scope of Environmental Assessment for GSX Project.

Taylor, Shawn

28 August 2000: E-mail to NEB - Georgia Strait Natural Gas Pipeline Crossing.

28 August 2000: E-mail to NEB - Georgia Strait Natural Gas Pileline Crossing (Bonjour).

31 July 2000: E-mail to NEB - BC Hydro - Georgia Strait Natural Gas Pipeline Crossing.

Tebbitt, Jillian

18 April 2002: Letter - Objection to the project.

18 January 2002: Presentation notes, Saturna Island Scoping Session.

Terasen Gas (Centra)

13 June 2003: Letter to JRP - Advising that they do not anticipate taking a position in support of opposing the Notice of Motion by GSXCCC.

Tetreau, Lillian

17 March 2003: Hearing Submission to JRP - Letter of Comment in opposition to GSX Project.

25 July 2000: Letter to NEB received 25 July 2000 - Comments on Scope of Environmental Assessment for GSX.

Thomson, Dave and/et Shirley

25 August 2000: Fax to NEB commenting on the Environmental Assessment of the GSX Pipeline.

Thorgeirson, Trudy

14 January 2002 - Presentation made by Trudy Thorgeirson at Public Consultation Sessions.

9 January 2002: E-mail - Follow up to phone message of 9 January 2002: will only be able to speak on 14 January 2002 at the Cobble Hill Session in the afternoon.

31 December 2001: Letter to JRP - Registration for Public Consultation Session.

Thornton, Glenn

20 September 2002: Letter to JRP - Safety on GSX Vancouver Island Gas Pipeline.

6 January 2002: E-mail from Glenn Thornton - Letter of Comment for GH-4-2001.

28 July 2000: E-mail to NEB - Commenting on Scope of Environmental Assessment.

28 June 2000: E-mail to NEB - Commenting on Scope of Environmental Assessment.

Toffan, Ms. Marion

Toffan, Mme Marion

11 October 2000: E-mail to NEB - IPR for GSX Project.

10 August 2000: E-mail to NEB - GSX Pipeline Project Environmental Assessment.

Truswell, Gordon

14 January 2002: Presentation made by Gordon Truswell, of GT Farms Ltd., at Public Consultation Sessions.

Tsartlip First Nation

Première nation de Tsartlip

7 September 2000: Letter to NEB - GSX Project and the Tsartlip First Nation.

30 June 2000: Chris Pretty fax to NEB - NEB Scope Letter dated 12 June 2000.

Tseycum First Nation

Première nation Tseycum

24 February 2003: Hearing Submission - No further crown consultation required.

28 November 2001: Chief Vern Jacks letter to JRP -  Intervenor Status in GSX Canada Pipeline Project public hearing.

Underwater Harvesters Association

16 February 2003: Letter to JRP - Withdrawal of Intervenor Status.

24 December 2001: Letter to JRP - Change of e-mail address.

19 December 2001: E-mail from Grant Dovey on behalf of Underwater Harvesters Association - Requesting confirmation on their application for intervenor status.

6 December 2001: Grant Dovey fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

University of British Columbia

24 February 2003: Fax to JRP - Affidavit of Byron Braley.

24 May 2002: Letter to Panel - Request for name of authorized representative.

29 April 2002: Letter - Request for intervenor status.

University of British Columbia and The Cedar Lodge Society

20 January 2003: Letter to JRP -  Response to IR No. 29.

28 November 2002: Letter to JRP - Written evidence.

VWVulcan Energy of Canada, Ltd.

25 January 2002: Letter from David Seymour on behalf of VWVulcan Energy of Canada, Ltd. - Comments by Beth Gibson.

Vancouver Island Advanced Technology Centre (VIATeC)

15 January 2003: E-mail to JRP - Clarification of Procedure.

5 April 2002: Letter received with Intervention dated 27 March 2002 from Mr. Colin Lennox on behalf of VIATeC.

27 March 2002: Letter - Application for intervenor status.

20 March 2002: E-mail from Mr. Colin Lennox on behalf of VIATeC - Intent to intervene.

25 January 2002: E-mail from Colin Lennox on behalf of VIATeC - Request for advice.

Vancouver Island Pipeline Landowners Association (VIPLA)

24 February 2003: Letter to JRP - Request for permission to withdraw from hearing.

21 February 2003: Letter to JRP - Request for transcripts.

20 February 2003: Letter to JRP - Intention to appear on 24 February 2003.

7 February 2003: Letter to JRP - Supplement to pre-filed evidence of VIPLA.

20 January 2003: Letter to JRP - Responses to various IR's including Schedules and Maps.

14 January 2003: E-mail to JRP - Comments on anticipated schedule.

23 December 2002: Letter to GSX PL - Request for Seismic Analysis Reports.

17 December 2002: Letter to GSX PL (cc: JRP) - VIPLA undertaking negotations with GSX PL.

9 December 2002: Letter to JRP - Clarification of documents submitted.

4 December 2002: Letter to JRP - Comments with respect to GSX PL application proceeding to hearing.

28 November 2002: Letter to JRP - Response to IR No. 18.

28 November 2002: Letter to JRP - VIPLA written evidence.

6 May 2002: Letter from Cohen Highley on behalf of VIPLA - Response to Panel's letter of 16 April 2002.

28 March 2002: Letter - Information Requests.

11 March 2002: Letter from Mr. Dave Thomson on behalf of VIPLA - Supports combining the effects of emissions.

26 February 2002: Letter from Cohen Highley on behalf of VIPLA - Designation of authorized representative.

22 February 2002: Letter from Cohen Highley on behalf of VIPLA - Request to allow two designated representatives.

20 February 2002: Letter from Cohen Highley on behalf of VIPLA - Concerns with respect to right of way and temporary workspace agreements, and impacts of construction.

5 February 2002: Letter from Ms. Dawn J. Kershaw, Cohen Highley, on behalf of VIPLA - Authorized representative.

14 January 2002: Presentation notes of Dave Thomson, VIPLA, Cobble Hill Scoping Session.

5 January 2002: Letter to JRP - Registration.

6 December 2001: Cohen Highley fax to JRP - Intervenor Status in GSX Canada Pipeline Project public hearing.

Vassilopoulos & Williamson, LC (VW)

24 May 2002: Letter to JRP - Change of representative.

17 May 2002: Letter to JRP - Request for intervenor status.

Veuger, Fred

17 January 2002: Letter to JRP - Environmental concerns vs GSX.

Vrkic, Damir

No date: Letter to NEB - Co-generation plant at Duke Point.

Wadds, Morris

18 January 2003: Letter to JRP - Hydrological Assessment of Georgia Strait Crossing Project.

2 February 2002: E-mail forwarded from the B.C. Environmental Assessment Office.

23 January 2002: E-mail - GH-4-2001 Supplementary Submission - 14 January presentation in Cobble Hill.

14 January 2002: Submission made by Morris E. Wadds and Bonnie C. Wadds at Cobble Hill.

7 January 2002: Letter to JRP - Registration for public Consultation Session.

Wales, Gordon

29 August 2000: Letter to NEB received 29 August 2000 - Environmental Assessment of the GSX Pipeline Project.

17 July 2000: Gordon Wales et al letters to NEB received 17 July 2000 - Scope for Environmental Assessment.

Wales, Janet and/et Gordon

24 July 2000: Letter to NEB received 24 July 2000 - Environmental Assessment Scoping, providing information on the 1946 Vancouver Island Earthquake.

Warner, Iris

24 August 2000: Fax to NEB - GSX Pipeline Limited.

Watson, Kath

8 August 2000: Letter to NEB received 8 August 2000 - Environmental Assessment of the GSX Pipeline Project.

Weland, Marilyn

29 September 2000: Letter to NEB expressing her concern and opposition to the proposed GSX Pipeline Project.

Westcoast Energy Inc.

22 February 2002: Letter providing supplementary information in support of a request for late intervention.

18 February 2002: Intervention from Mr. Barry Jardine.

West Coast Environmental Law

31 August 2000: Letter to Mr. David Anderson - Proposed GSX Project.

Wightman, W. Esther

11 January and 14 January 2002: Submission dated at Public Consultation Session.

Williams, J.D.

29 November 2002: Letter - Comments on GSX Project.

Wilson, L.

26 February 2003: Letter to JRP - Letter of Comment in opposition to GSX Project.

Winter, Trudy

8 July 2000: Letter to NEB - Scope for Environmental Assessment. (GSX)

Woods, Morris E.

2 July 2000: Letter to NEB enclosing a copy of his letter to B.C. Hydro dated 1 July 2000.

Worsley, Phyllis M.

17 August 2000: Letter to NEB - Environmental Assessment of the GSX Pipeline Project.

Wright, Irene

16 January 2002: Intervention.

8 January 2002: E-mail - Registration for Saltspring Session for GH-4-2001.

Wyton, Bernadette

17 March 2003: Hearing Submission to JRP - Letter of Comment in opposition to GSX Project.

14 January 2002: Presentation made by Bernadette Wyton at Cobble Hill.

Wyton, Keith

14 January 2002: Presentation made by Keith Wyton at Public Consultation Session.

Yates, Susan

1 September 2000: E-mail to NEB enclosing E-mail from Delores Broten to Susan Yates dated 1 September 2000.

Young, Sonja

17 January 2002: Submission, Victoria Scoping Session.

2 January 2002: Letter to JRP - Registration for Public Consultation Session.

Comments received on Draft Agreement

Comments received on Draft Agreement, A. D. Fisher
Comments received on Draft Agreement, Andrew Day
Comments received on Draft Agreement, Ann Hodges
Comments received on Draft Agreement, Anne Wilson
Letter asking for extension of comment period, Arthur Caldicott
Notice of intention to comment, Arthur Caldicott
Comments received on Draft Agreement, Arthur Caldicott
Comments received on Draft Agreement, Bill Henderson
Comments received on Draft Agreement, Brenda Gaertner
Comments received on Draft Agreement, Brenda Reimer
Comments received on Draft Agreement, Catherine Craig
Comments received on Draft Agreement, D. Anderson
Comments received on Draft Agreement, D. Anderson
Comments received on Draft Agreement, Diana Knowles
Letter asking for extension of comment period, Dodie Miller
Comments received on Draft Agreement, Dodie Miller
Comments received on Draft Agreement, Don Davies
Comments received on Draft Agreement - 2nd letter, Don Davies
Comments received on Draft Agreement - 3rd letter, Don Davies
Comments received on Draft Agreement, Don Harrison
Comments received on Draft Agreement, Don Skerik
Comments received on Draft Agreement, Doran Doyle
Comments received on Draft Agreement, E.R. Morton
Comments received on Draft Agreement, Erin Keast
Comments received on Draft Agreement, Ethel M. Johnson
Comments received on Draft Agreement, Faye Morgansen
Letter expressing opposition to the project, Fiona Chambers
Comments received on Draft Agreement, Gary Greenstein
Comments received on Draft Agreement, Glenn Thornton
Comments received on Draft Agreement, Glenys Verlhust
Letter asking to be included in all Public Meetings, Gordon Toffan
Letter enquiring about Public meetings, Gordon Toffan
Comments received on Draft Agreement, Gordon Toffan
Letter asking for extension of comment period, Gregor Robertson
Comments received on Draft Agreement, H. Joannides
Comments received on Draft Agreement, Ingmar Lee
Comments received on Draft Agreement, Jan Zwicky
Comments received on Draft Agreement, Joanna Wilkinson
Comments received on Draft Agreement, Joe Allen
Copy of comment letter sent to Minister Anderson, Jolyon Briggs
Comments received on Draft Agreement, Jolyon Briggs
Comments received on Draft Agreement, Jon Guy
Comments received on Draft Agreement, K. Mortimer
Comments received on Draft Agreement, Kevin Maher and Tracy Drews
Comments received on Draft Agreement, Lorraine and Larry Pommen
Comments received on Draft Agreement, Lowell and Ann Wilson
Comments received on Draft Agreement, Lydia Hwitsun
Comments received on Draft Agreement, Màiri McLennan
Copy of comment letter sent to Minister Anderson, Malcolm Maclure
Copy of comment letter sent to Minister Anderson, Margaret Fear
Comments received on Draft Agreement, Melanie Ransom
Comments received on Draft Agreement, Michael Doherty
Comments received on Draft Agreement, Michael Eckford
Comments received on Draft Agreement, Michael Mascall
Comments received on Draft Agreement, Pat McMahon and John Lancaster
Comments received on Draft Agreement, Phil Marchant
Comments received on Draft Agreement, Philip Grange
Comments received on Draft Agreement, Raymond Moss
Comments received on Draft Agreement, Richard Hughes
Comments received on Draft Agreement, Sherri Hobert
Comments received on Draft Agreement, Simon Farthing
Comments received on Draft Agreement, Steve and Dodie Miller
Comments received on Draft Agreement and petition, Steve and Dodie Miller
Comments received on Draft Agreement, Susan and J.G. Smith
Letter asking for extension of comment period, Thomas Hackney
Comments received on Draft Agreement, Thomas Hackney
Comments received on Draft Agreement, Thomas Hackney
Comments received on Draft Agreement, Tim Howard
Comments received on Draft Agreement, Valorie Cunningham
Petition expressing opposition to the project, various
Petition expressing opposition to the project, various
Comments received on Draft Agreement, Warren Chapman
Comments received on Draft Agreement, William Andrews
Comments received on Draft Agreement - 2nd letter, William Andrews
Comments received on Draft Agreement, William Davis

Commentaires reçus concernant l'ébauche d'entente

Commentaires reçus concernant l'ébauche d'entente, A. D. Fisher
Commentaires reçus concernant l'ébauche d'entente, Andrew Day
Commentaires reçus concernant l'ébauche d'entente, Ann Hodges
Commentaires reçus concernant l'ébauche d'entente, Anne Wilson
Lettre demandant un rallongement de la période de commentaires, Arthur Caldicott
Avis d'intention de soumettre des commentaires, Arthur Caldicott
Commentaires reçus concernant l'ébauche d'entente, Arthur Caldicott
Commentaires reçus concernant l'ébauche d'entente, Bill Henderson
Commentaires reçus concernant l'ébauche d'entente, Brenda Gaertner
Commentaires reçus concernant l'ébauche d'entente, Brenda Reimer
Commentaires reçus concernant l'ébauche d'entente, Catherine Craig
Commentaires reçus concernant l'ébauche d'entente, D. Anderson
Commentaires reçus concernant l'ébauche d'entente, D. Anderson
Commentaires reçus concernant l'ébauche d'entente, Diana Knowles
Lettre demandant un rallongement de la période de commentaires, Dodie Miller
Commentaires reçus concernant l'ébauche d'entente, Dodie Miller
Commentaires reçus concernant l'ébauche d'entente, Don Davies
Commentaires reçus concernant l'ébauche d'entente - 2e lettre, Don Davies
Commentaires reçus concernant l'ébauche d'entente - 3e lettre, Don Davies
Commentaires reçus concernant l'ébauche d'entente, Don Harrison
Commentaires reçus concernant l'ébauche d'entente, Don Skerik
Commentaires reçus concernant l'ébauche d'entente, Doran Doyle
Commentaires reçus concernant l'ébauche d'entente, E.R. Morton
Commentaires reçus concernant l'ébauche d'entente, Erin Keast
Commentaires reçus concernant l'ébauche d'entente, Ethel M. Johnson
Commentaires reçus concernant l'ébauche d'entente, Faye Morgansen
Lettre exprimant opposition au projet, Fiona Chambers
Commentaires reçus concernant l'ébauche d'entente, Gary Greenstein
Commentaires reçus concernant l'ébauche d'entente, Glenn Thornton
Commentaires reçus concernant l'ébauche d'entente, Glenys Verlhust
Lettre demandant d'être inclus dans les réunions publiques, Gordon Toffan
Lettre demandant de l'inforamtion au sujet des réunions publiques, Gordon Toffan
Commentaires reçus concernant l'ébauche d'entente, Gordon Toffan
Lettre demandant un rallongement de la période de commentaires, Gregor Robertson
Commentaires reçus concernant l'ébauche d'entente, H. Joannides
Commentaires reçus concernant l'ébauche d'entente, Ingmar Lee
Commentaires reçus concernant l'ébauche d'entente, Jan Zwicky
Commentaires reçus concernant l'ébauche d'entente, Joanna Wilkinson
Commentaires reçus concernant l'ébauche d'entente, Joe Allen
Copie de lettre de commentaires envoyés au ministre Anderson, Jolyon Briggs
Commentaires reçus concernant l'ébauche d'entente, Jolyon Briggs
Commentaires reçus concernant l'ébauche d'entente, Jon Guy
Commentaires reçus concernant l'ébauche d'entente, K. Mortimer
Commentaires reçus concernant l'ébauche d'entente, Kevin Maher et Tracy Drews
Commentaires reçus concernant l'ébauche d'entente, Lorraine and Larry Pommen
Commentaires reçus concernant l'ébauche d'entente, Lowell et Ann Wilson
Commentaires reçus concernant l'ébauche d'entente, Lydia Hwitsun
Commentaires reçus concernant l'ébauche d'entente, Màiri McLennan
Copie de lettre de commentaires envoyés au ministre Anderson, Malcolm Maclure
Copie de lettre de commentaires envoyés au ministre Anderson, Margaret Fear
Commentaires reçus concernant l'ébauche d'entente, Melanie Ransom
Commentaires reçus concernant l'ébauche d'entente, Michael Doherty
Commentaires reçus concernant l'ébauche d'entente, Michael Eckford
Commentaires reçus concernant l'ébauche d'entente, Michael Mascall
Commentaires reçus concernant l'ébauche d'entente, Pat McMahon et John Lancaster
Commentaires reçus concernant l'ébauche d'entente, Phil Marchant
Commentaires reçus concernant l'ébauche d'entente, Philip Grange
Commentaires reçus concernant l'ébauche d'entente, Raymond Moss
Commentaires reçus concernant l'ébauche d'entente, Richard Hughes
Commentaires reçus concernant l'ébauche d'entente, Sherri Hobert
Commentaires reçus concernant l'ébauche d'entente, Simon Farthing
Commentaires reçus concernant l'ébauche d'entente et pétition, Steve and Dodie Miller
Commentaires reçus concernant l'ébauche d'entente, Steve and Dodie Miller
Commentaires reçus concernant l'ébauche d'entente, Susan and J.G. Smith
Lettre demandant un rallongement de la période de commentaires, Thomas Hackney
Commentaires reçus concernant l'ébauche d'entente, Thomas Hackney
Commentaires reçus concernant l'ébauche d'entente, Thomas Hackney
Commentaires reçus concernant l'ébauche d'entente, Tim Howard
Commentaires reçus concernant l'ébauche d'entente, Valorie Cunningham
Pétition exprimant opposition au projet, variés
Pétition exprimant opposition au projet, variés
Commentaires reçus concernant l'ébauche d'entente, Warren Chapman
Commentaires reçus concernant l'ébauche d'entente - 2e lettre, William Andrews
Commentaires reçus concernant l'ébauche d'entente, William Andrews
Commentaires reçus concernant l'ébauche d'entente, William Davis