Report of the Auditor General
O A G
Main Points
Introduction
Observations and Recommendations
Conclusion
About the Audit
1—Key points in the engineering firm's analysis of advantages and disadvantages to using the design-build approach for the Mayo-Dawson City transmission system project
2—Key players in the Mayo-Dawson City transmission system project
3—Summary of Yukon Energy Corporation's internal costs for the transmission system project ($ thousands)
4—Mayo-Dawson City transmission system project—Authorized costs compared with expenditures ($ thousands)

Soil conditions can affect the installation of wood poles.

Soil conditions can affect the installation of wood poles.