Report Card on Nuclear Power Plant Performance
as of January 2005
CNSC staff assesses licensee programs (“P”) and their implementation
(“I”) separately, according to five ratings. As of January 2005, Pickering A
Units 1, 2 and 3 remained fuelled and in a guaranteed shutdown state, and Unit 1
was undergoing restart work. Bruce A Units 1 and 2 remained defuelled and in a
lay-up state.
Safety Area
Program |
P or
I |
Bruce |
Darling-
ton |
Pickering |
Gen-
tilly-2 |
Point Lepreau |
A |
B |
A |
B |
Operating Performance |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
Organization & Plant
Management |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
C |
B |
B |
Operations |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
Occupational Health & Safety
(Non-Radiological) |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
|
Performance Assurance |
P |
B |
B |
B |
B |
B |
C |
B |
I |
B |
B |
B |
B |
B |
C |
B |
Quality Management |
P |
C |
C |
B |
B |
B |
B |
B |
I |
B |
B |
C |
C |
C |
B |
B |
Human Factors |
P |
B |
B |
B |
B |
B |
C |
C |
I |
B |
B |
B |
B |
B |
C |
C |
Training |
P |
B |
B |
B |
B |
B |
C |
B |
I |
B |
B |
B |
B |
B |
C |
B |
|
Design and Analysis |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
C |
B |
B |
Safety Analysis |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
Safety Issues |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
Design |
P |
B |
B |
B |
B |
B |
B |
C |
I |
B |
B |
B |
B |
C |
B |
C |
|
Equipment Fitness for Service |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
C |
Maintenance |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
C |
B |
B |
Structural Integrity |
P |
B |
B |
B |
B |
B |
B |
C |
I |
B |
B |
B |
B |
B |
B |
C |
Reliability |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
Equipment Qualification |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
C |
B |
B |
B |
C |
|
Emergency Preparedness |
P |
A |
A |
A |
A |
A |
A |
A |
I |
A |
A |
A |
A |
A |
B |
C |
|
Environmental Performance |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
|
Radiation Protection |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
C |
B |
|
Site Security |
P |
Protected |
I |
Protected |
|
Safeguards |
P |
B |
B |
B |
B |
B |
B |
B |
I |
B |
B |
B |
B |
B |
B |
B |
Legend:
A = Exceeds requirements
B = Meets requirements
C = Below requirements
D = Significantly below requirements
E = Unacceptable
Information Sources
For further information or to request publications, contact:
Canadian Nuclear Safety Commission
Office of Communications and Regulatory Affairs
280 Slater Street, P.O. Box 1046, Station B
Ottawa, Ontario K1P 5S9
Telephone: (613) 995-5894 or 1-800-668-5284 (within Canada)
Fax: (613) 995-5086
e-mail: info@ccsn-ccsn.gc.ca
The following information is available on the CNSC Web site
at www.nuclearsafety.gc.ca
Information on the plans, priorities, and activities of the CNSC may
be found in:
Canadian Nuclear Safety Commission, Annual Report
Canadian Nuclear Safety Commission, Report on Plans and Priorities
Canadian Nuclear Safety Commission, Departmental Performance Report
The CNSC administers the following Acts and associated regulations:
Nuclear Safety and Control Act, 1997, c.9
Nuclear Liability Act, 1985, c. N-28
For further information you may also consult the CNSC Web