Canadian Environmental Assessment Agency - Government of Canada
Skip all menusSkip first menu
FrançaisContact UsHelpSearchCanada Site
  HomeAbout the AgencyMedia RoomLinksSite Map
  Search the RegistryAbout the Registry
 
Environmental Assessments
Public Participation
How to do Environmental Assessments
Legislation & Regulations
Training Opportunities
Research & Development
Strategic Environmental Assessment
Publications
Frequently Asked Questions
Canadian Environmental Assessment Registry. CEAR Main»
A primer for Industry. Will your project need a federal EA? More »
 
Search our site
CEAR Home » Basic Search »
04-01-8081

Canadian Environmental Assessment Registry

CEA Registry Reference Number: 04-01-8081

(Document List)

NOTICE OF COMMENCEMENT

of an environmental assessment

Bruce A Refurbishment for life extension and continued operation (Bruce Power)

Tiverton (ON)

December 14, 2004 (Update) -- The Canadian Nuclear Safety Commission will conduct a screening commencing on December 14, 2004 of the project: Bruce A Refurbishment for life extension and continued operation (Bruce Power).

The proposal is to return Units 1 and 2 of Bruce A to service (operational status) and extend their life through the end of a potential Bruce Power lease in 2043. In addition, the proposal includes the possible extended operational life of Units 3 & 4 through 2043, as well as the potential use of Low Void Reactivity Fuel (New Fuel) in all 4 units at Bruce A. Authorizations required for the life extension of Units 3 and 4 and the use of New Fuel may be sought by Bruce Power as required at a later date. This would occur after Units 1 and 2 have been restarted if authorization to do so is provided by the CNSC.

Under section 5 of the Canadian Environmental Assessment Act, an EA is required for this project because the Canadian Nuclear Safety Commission may issue a permit or license under subsection 24(2) of the Nuclear Safety and Control Act.

For further information on this environmental assessment, please contact:
Guy Riverin
Environmental Assessment Specialist
Canadian Nuclear Safety Commission
P.O. Box 1046, Station B
Telephone: (800) 668-5284
Fax: (613) 995-5086
Email address: ceaainfo@cnsc-ccsn.gc.ca

and refer to CEAR reference number  04-01-8081



Note: The Notice of Commencement has been amended on the following dates.
December 14, 2004 at 07:44
December 14, 2004 (Current)
Document List
[Jan 09, 2006] Request for Public Input into the Draft Screening Report for the Environmental Assessment of the Bruce A Refurbishment for Life Extension and Continued Operations Project
[Jan 06, 2006] Draft Screening Report on the Environmental Assessment of the Bruce A Refurbishment for Life Extension and Continued Operations Project
[Jan 14, 2005] Description of factors considered in the environmental assessment
[Jan 14, 2005] Request For Public comment on Draft Environmental Assessment Guidelines(Scope of project and scope of assessment) Proposed Bruce A Refurbishment for Life Extension and Continued Operations Project (Bruce Power)
[Dec 14, 2004] Draft EA Guidelines (Scope of Project and Assessment) Environmental Assessment of a Proposal for the Refurbishment for Life Extension and Continued Operations of Bruce A Reactors at the Bruce A Nuclear Generating Station (Bruce A NGS)
[Dec 14, 2004] Notice of Commencement

 