Cernavoda

Cernavoda Units 1 and 2
CernavodaCernavoda, Romania

The Cernavoda Unit 1 nuclear power plant—the first CANDU in Europe—provides about 10% of Romania’s electricity requirements, saving millions of dollars in oil imports.

AECL supplied the CANDU nuclear steam plant design for Cernavoda Unit 1 and with an Italian partner, ANSALDO, also provided overall project management. The owner and operator is the Romanian nuclear state utility, Societatea Nationala Nuclearelectrica (SNN, one of the successors of RENEL).

AECL and ANSALDO operated the reactor for the first six months after its commissioning—to ensure that operating procedures were well established. It also provided formal and on-the-job training for the Romanian personnel who now operate the reactor. Almost 100 Romanian operating staff and nuclear safety inspectors from Cernavoda Unit 1 participated in on-the-job training at the Point Lepreau and Gentilly CANDU nuclear power plants in Canada. Cernavoda Unit 1 has been operating under Romanian management since July 1, 1997, and completed its first year of operation with a capacity factor of 87.3%.

AECL also transferred its CANDU fuel and heavy water technology to Romania, so it could manufacture fuel bundles and heavy water for the moderator and coolant locally.

Romania realizes an annual savings equivalent to USD $100 million by using nuclear generated electricity instead of fossil fuel. And because a nuclear plant does not emit greenhouse gases that contribute to acid rain and global warming, Unit 1 has avoided the release of more than four million tonnes per year of carbon dioxide (CO2) that would have been produced had a fossil fuel plant been built instead.

AECL and ANSALDO are now working on Cernavoda Unit 2, which is about 40% complete. They are providing engineering services, supply and installation of critical components and equipment, and construction, all with increased customer involvement.

Cernavoda Major Project Milestones

Gross Output

First Containment Concrete (reactor building base slab)

Start of Fuel Loading

First Synchronization

In-Service

Unit 1

706 MWe

Summer 1982

May 29, 1995

July 11, 1996

Dec. 2, 1996


Cernavoda Project Responsibilities

Role

Cernavoda Unit 1

Cernavoda Unit 2

Owner

SNN

SNN

Operator

SNN

SNN

Overall Project Manager

AECL/ANSALDO

AECL/ANSALDO

Main Contractor

AECL/ANSALDO

AECL/ANSALDO

Architect Engineer

AECL/ANSALDO

AECL/ANSALDO

Reactor System Supply

AECL

AECL

Reactor Vessel Supply

AECL

AECL

First Fuel Load Supply

Zircatec

SNN

Fuel Reloads

SNN

SNN

Turbine Generator Supply

GE USA

GE USA

Civil Construction

SNN

SNN