Ontario Power Generation Refurbishment
Ontario Power Generation![](/web/20061206210020im_/http://www.aecl.ca/system/images/ExternalLink.gif)
(OPG) is undertaking preliminary evaluations of the potential refurbishment of Pickering Units 5 to 8, as well as Darlington Units 1 to 4. These projects could result in refurbishment outages in the 2013 to 2017 time frame for Pickering, and later for Darlington. These potential projects form a key part of the Energy Supply and Demand Strategy currently under consideration by the
Ontario Power Authority![](/web/20061206210020im_/http://www.aecl.ca/system/images/ExternalLink.gif)
. AECL is supporting OPG to establish the basis for Retubing and continued plant life operation.