Skip to page content

Canadian Wheat Board

Prairie strong, worldwide

Farmers

Rejected selected barley

Producers who have selected barley that was rejected at delivery or unload, can complete the GDC for Rejected Selected Barley if they wish to deliver the grain as feed barley to the CWB.

The Guaranteed Delivery Contract (GDC) is a delivery option that offers 100 per cent delivery calls by a specified date. The CWB had two pool periods for feed barley in the 2005-06 crop year. The first pool period ran from August 1, 2005 to January 31, 2006 and the second runs from February 1, 2006 to July 31, 2006. Producers are eligible for the Pool in effect at the time of rejection.

If the producer has a Selected Barley EPO locked in, they should consider their transfer options to a Feed Barley EPO, by calling the CWB at 1-800-275-4292.

If selected barley is rejected at delivery or unload because it does not meet minimum germination levels, producers may be eligible for storage payments based on the following criteria: