Environment
Contact Us

Search
Government of Alberta
 Location: Alberta Government > Environment > Water > Water Management Operations > Water Management Projects > Southern Alberta
 
Last Review/Updated: October 19, 2005

Southern Alberta

WMO water projects within Southern Alberta lie within the Bow River Sub-basin, Oldman River Sub-basin, lower Red Deer River sub-basin and the South Saskatchewan sub-basin. These sub-basins all feed into the South Saskatchewan River.

(Map Under Construction)

Projects in Southern Alberta include:

  • Bow Operations
    • Western Headworks System - Owned by AENV, Operated by Contractor
    • Carseland Bow River Headworks System - Owned by AENV, Operated by Contractor
    • Sheerness-Deadfish Water Supply System
    • Pine Coulee Project
    • Highwood River Diversions
    • Twin Valley Dam and Reservoir
    • Clear Lake Project
  • Oldman Operations
    • Oldman Dam and Reservoir
    • Lethbridge Northern Headworks
    • Waterton-St. Mary Headworks
    • Mountain View Leavitt Aetna Headworks - Owned and Operated by AENV
    • Cavan Lake Headworks
    • Cypress Hills Area Projects - Owned and Operated by AENV
  • Real Time Monitoring Data for Alberta River Basins
  • Bow River Basin – 3 day operational forecast
  • Highwood River – weekly report
  • Status of Major Water Storage Reservoirs (Province –wide)

Southern Operations Manager: Saba Gnanakumar


Environment Home | Search | Contact Us | Privacy Statement

Emergency Numbers

The user agrees to the terms and conditions set out in the Copyright and Disclaimer statement.

© 2006 Government of Alberta
Government of Alberta