Over the next three years, Transport Canada will manage the following transfer
payment programs (TPP) in excess of $5 million:
1) Name of Transfer Payment Program: Grant to the Province
of British Columbia for ferry and coastal freight and passenger services.
|
2) Start Date: 1977
|
3) End Date: ongoing
|
4) Description: The Province of British Columbia assumes the entire
responsibility for the operation of ferry and coastal freight and passenger
services.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results:
- Transportation links to the national surface transportation
system from various regions and isolated areas of British Columbia.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
$24,890
|
$25,426
|
$ 25,426
|
$25,426
|
12) Total Contributions |
|
|
|
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$24,890
|
$25,426
|
$ 25,426
|
$25,426
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the
next risk based annual Audit Plan development cycle of Audit and Advisory
Services. An evaluation of the program was completed in 2005. |
1) Name of Transfer Payment Program: Contribution for ferry
and coastal passenger and freight services
|
2) Start Date: 1941
|
3) End Date: ongoing
|
4) Description: Operating funding for two regional passenger and
vehicle ferry services, CTMA Traversier Ltee and Northumberland Ferry
Ltd.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results:
- Ensuring commercial viability of ferry services that effectively
meet demand and rates that reflect market conditions.
- Access to mainland transportation network.
- Safe, efficient and reliable ferry services between Cap-aux-Meules,
Iles-de-la-Madeleine and Souris, Prince Edward Island, and Wood
Islands, Prince Edward Island and Caribou, Nova Scotia, that contribute
to local and regional economic development.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$9,355
|
$8,466
|
$8,649
|
$8,734
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$9,355
|
$8,466
|
$8,649
|
$8,734
|
14) Planned Audits and Evaluations |
An audit was carried out in 2004. A follow-up of the status of the
management action plan will be carried out and the program will be considered
for audit in the next Annual Audit Plan development cycle. An evaluation
of the program was completed in 2004. The next evaluation is planned
for 2010. |
1) Name of Transfer Payment Program: Name of Transfer Payment Program
-
Strategic Highway Infrastructure Program - Highway
Component
Strategic Highway Infrastructure Program - Border Crossing
Transportation Initiative
Strategic Highway Infrastructure Program - Transportation Planning/Modal
Integration (TPMI) Initiative
Strategic Highway Infrastructure Program - Intelligent Transportation
Systems Initiative
|
2) Start Date: March 29, 2001 |
3) End Date:
-
SHIP Highway Component ends March 31, 2009.
SHIP Border Crossing Transportation Initiative and
Transportation Planning and Modal Integration (TPMI) Initiative
have been extended until March 31, 2007.
SHIP Intelligent Transportation Systems Initiative has
been extended until March 31, 2007.
|
4) Description:
-
SHIP Highway Component: Provide federal
funding under cost-shared contribution agreements with provincial
and territorial governments for highway improvement projects to
address the needs of Canada's National Highway System.
SHIP Border Crossing Transportation Initiative and TPMI Initiative:
Provide federal funding under cost-shared contribution agreements
with provincial, territorial, municipal governments and other partners
to improve the access to land border crossings, mobility, modal
integration and transportation efficiency.
SHIP Intelligent Transportation Systems Initiative:
Provide federal funding under cost-shared contribution agreements
with provincial, territorial, municipal governments and other partners
to enable the undertaking of the deployment of intelligent transportation
systems.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results:
- SHIP - Highway Component: Sustained
strategic infrastructure investments in all regions, enhanced safety
performance, support to trade and economic development and promotion
of sustainable transportation. This funding will provide an efficient,
integrated and accessible transportation system.
- SHIP - Border Crossing Transportation Initiative
and TPMI Initiative: Increased operational and regulatory
efficiencies for system users and public agencies, improved mobility
and traveller information, enhanced safety and security for passengers
and freight including inter-modal connections, reduced congestion
and enhanced trade and economic development.
- SHIP Intelligent Transportation Systems Initiative:
Improved mobility and transportation efficiencies, and enhanced
safety performance and sustainable transportation.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$155,834
|
$90,317
|
-
|
-
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$155,834
|
$90,317
|
-
|
-
|
14) Planned Audits and Evaluations |
The program components will be considered for audit work in the next
Annual Audit Plan development cycle of Audit and Advisory Services.
An evaluation of all three SHIP components is currently underway and
will be completed in 2006. |
1) Name of Transfer Payment Program: Outaouais Roads Agreement
|
2) Start Date: January 7, 1972
|
3) End Date: No sunset clause
|
4) Description: Contributions to the Province of Quebec related to
the Outaouais Roads Agreement toward highway improvements are made to
enhance overall efficiency and promote safety while encouraging regional
and industrial development and tourism.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results:. An improved National Capital transportation
system by reducing congestion and improving safety, while encouraging
regional, industrial development and tourism.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$14,344
|
$11,773
|
$12,588
|
$3,075
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$14,344
|
$11,773
|
$12,588
|
$3,075
|
14) Planned Audits and Evaluations |
A limited scope audit of this program was completed in the 2005‑2006
fiscal year. An evaluation was completed in 2005. The next evaluation
is planned for 2009-10. |
1) Name of Transfer Payment Program: Contribution in support
of the divestiture of the non-National Airport System (Non-NAS) airports
|
2) Start Date: April 1st, 2005 (Original program started
July 1994) |
3) End Date: March 31st, 2007
|
4) Description: The Contribution Program allows offering, as part
of the transfer of Non-NAS airports, funding for base capital expenditures
and operational deficits for a transition period.
|
5) Strategic Outcome(s): An efficient transportation
system that contributes to Canada's economic growth and trade objectives.
|
6) Expected Results: Funding to new airport operators during a transition
period for base capital expenditures and operating deficits to ensure
a viable system of airports in Canada.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
-
|
$5,600
|
-
|
-
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
-
|
$5,600
|
-
|
-
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the next risk based
annual Audit Plan development cycle of Audit and Advisory Services.
An evaluation was completed in 2004. The next evaluation is tentatively
planned for 2007-08. |
1) Name of Transfer Payment Program: Airports Capital Assistance
Program
|
2) Start Date: April 1st, 1995
|
3) End Date: March 31st, 2010
|
4) Description: Airports Capital Assistance Program(ACAP) assists
eligible applicants in financing capital projects related to safety,
asset protection and operating cost reduction.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results: Maintained or increased safety, contribution
to asset protection, reduction in operating cost and increased use of
environmentally sustainable practices at airports, where possible.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$35,400
|
$38,000
|
$38,000
|
$38,000
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$35,400
|
$38,000
|
$38,000
|
$38,000
|
14) Planned Audits and Evaluations |
Project specific audits are planned for the spring of 2006.
An evaluation was completed in 2004-05. The next evaluation is planned
for 2008-09. |
1) Name of Transfer Payment Program: Contribution Program
for operating, capital and start-up funding requirement for Regional
and Remote Passenger Rail Services
|
2) Start Date: June 1, 2004
|
3) End Date: March 31, 2010
|
4) Description: Provide operating funding for the regional and remote
passenger rail services not provided by VIA Rail, for capital and start-up
costs for regional and remote passenger rail services, and to address
potential costs of transferring regional services.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results: Continuation of safe, viable, reliable and sustainable
regional and remote passenger rail services.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$25,292
|
$8,100
|
$8,100
|
$5,600
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$25,292
|
$8,100
|
$8,100
|
$5,600
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the next risk based
annual Audit Plan development cycle of Audit and Advisory Services.
An evaluation of the program was completed in 2004. The next evaluation
is planned for 2009-10. |
1) Name of Transfer Payment Program: Northumberland Strait
Crossing subsidy payment (Statutory)
|
2) Start Date: April 1, 1997
|
3) End Date: April 1, 2032
|
4) Description: Subsidy payments are made to bridge operator to honour
constitutional obligations to provide a transportation link between
Prince Edward Island and the mainland.
|
5) Strategic Outcome(s): An efficient transportation system that
contributes to Canada's economic growth and trade objectives.
|
6) Expected Results: Federal funding is provided for continuous and
efficient year-round transportation of people and goods between Prince
Edward Island and the mainland to support an efficient, integrated and
accessible transportation system.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
Policies, Programs and Infrastructure in support of a market-based
framework |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$52,790
|
$53,928
|
$55,023
|
$56,119
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$52,790
|
$53,928
|
$55,023
|
$56,119
|
14) Planned Audits and Evaluations |
The program is included in Audit and Advisory Service's Annual Audit
Plan 2005-2006 and the audit is scheduled to be completed early in 2006-07.
This is a statutory payment and therefore, no evaluation is planned. |
1) Name of Transfer Payment Program: Grade Crossing Improvement
Contribution Program (approved under Railway Safety
Act)
|
2) Start Date: 1989
|
3) End Date: ongoing
|
4) Description: Payments made to railway companies, municipalities
to improve the safety at public road/railway grade crossings.
|
5) Strategic Outcome(s): A safe and secure transportation system
that contributes to Canada's social development and security objectives.
|
6) Expected Results: Safety Improvements at Grade crossings that
result in accident reductions.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
12) Total Grants |
$200
|
$300
|
$300
|
$300
|
12) Total Contributions |
$11,045
|
$7,145
|
$7,145
|
$7,145
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$11,245
|
$7,445
|
$7,445
|
$7,445
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the next risk based
annual Audit Plan development cycle of Audit and Advisory Services.
An evaluation of the program was completed in 2005. The next evaluation
is planned for 2010-11. |
1) Name of Transfer Payment Program: Marine Security Contribution
Program
|
2) Start Date: Dec. 1, 2004
|
3) End Date: Nov. 30, 2007
|
4) Description: Enhanced Marine Security
|
5) Strategic Outcome(s): A safe and secure transportation system
that contributes to Canada's social development and security objectives.
|
6) Expected Results: Output:
- Financial assistance to aid in the speedy implementation of
security measures and to help offset the costs of operators who
would not have the financial capacity to cover security costs without
significantly affecting operating costs.
Expected Results (Immediate):
- Accelerated implementation, construction and other changes to
security procedures, equipment and training.
- Enhanced ability of marine facility operators and ports to address
security gaps.
- Offset costs of rapid regulatory change placed on ports and
marine facility owners and operators
Outcomes:
- Establishment and maintenance of a high and consistent security
standard for all visitors and trade entering Canada
- Reduced likelihood of a marine transportation security incident,
including terrorist acts
- Maintenance of the competitiveness of Canada's marine transportation
sector.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1 |
8) Planned
Spending
2006-2007 |
9) Planned
Spending
2007-2008 |
10) Planned
Spending
2008-2009 |
11) Program Activity |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
Policies, Rulemaking, Monitoring and Outreach in support of a safe
and secure transportation system |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$17,403
|
$56,000
|
$15,000
|
-
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$17,403
|
$56,000
|
$15,000
|
-
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the next risk based
annual Audit Plan development cycle of Audit and Advisory Services.
An evaluation of the program is planned for 2006-07. |
1) Name of Transfer Payment Program: Action Plan 2000 for
Climate Change - Urban Transportation Showcase Program
|
2) Start Date: June 21, 2001
|
3) End Date: March 31, 2007
|
4) Description: To test and measure the impacts of strategies to
reduce urban Greenhouse Gas (GHG) emissions from transportation, so
as to lay a foundation for the adoption of effective, integrated GHG
reduction strategies in urban centres across Canada by 2010.
|
5) Strategic Outcome(s): An environmentally responsible transportation
system that contributes to Canada's sustainable development objectives.
|
6) Expected Results: Intermediate:
- Behavior changes in showcase communities result in GHG reductions;
- Capacity to reduce GHG emissions is enhanced;
- Decision makers from communities across Canada select more energy
efficient land use and transportation planning strategies;
- GHG emissions reduction strategies are replicated in communities
across Canada and GHG emissions are reduced.
Long-term:
- Showcase communities GHG emissions are reduced by 0.8 MT of
GHG (by 2010).
- Urban transportation GHG emissions across Canada are reduced
- the potential reduction of the strategies is 12 - 15 MT by 2010.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1
|
8) Planned
Spending
2006-2007
|
9) Planned
Spending
2007-2008
|
10) Planned
Spending
2008-2009
|
11) Program Activity |
Policies and Programs in support of sustainable transportation |
Policies and Programs in support of sustainable transportation |
Policies and Programs in support of sustainable transportation |
Policies and Programs in support of sustainable transportation |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$6,986
|
$21,432
|
-
|
-
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$6,986
|
$21,432
|
-
|
-
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the
next risk based annual Audit Plan development cycle of Audit and Advisory
Services. An evaluation is planned for 2006-07. |
1) Name of Transfer Payment Program: Climate Change:
Emission Reduction Package - non-roads freight initiatives.
|
2) Start Date: April 23, 2004
|
3) End Date: March 31, 2007
|
4) Description: The Freight Efficiency Program is
a four-year, $11 million program that aims to reduce the growth of greenhouse
gas emissions in Canada's freight transportation sector through: i)
providing financial incentives to encourage the use of efficiency-enhancing
technologies, equipment and practices in the rail, marine and aviation
sectors; ii) facilitating the sharing of information; and iii) establishing
new awareness programs for shippers and freight forwarders to help them
make more informed modal choices.
|
5) Strategic Outcome: An environmentally responsible transportation
system that contributes to Canada's sustainable development objectives.
|
6) Expected Results:
- Greater adoption of efficiency enhancing technologies, equipment
and practices in the rail, marine and aviation sector to increase
freight efficiency within and across modes.
- Increased awareness and uptake of the environmental, economic
and other benefits of different transportation choices by shippers
and freight forwarders.
|
($ thousands) |
7) Forecast
Spending
2005-2006 1 |
8) Planned
Spending
2006-2007 |
9) Planned
Spending
2007-2008 |
10) Planned
Spending
2008-2009 |
11) Program Activity |
Policies and Programs in support of sustainable transportation |
Policies and Programs in support of sustainable transportation |
Policies and Programs in support of sustainable transportation |
Policies and Programs in support of sustainable transportation |
12) Total Grants |
|
|
|
|
12) Total Contributions |
$282
|
$5,308
|
-
|
-
|
12) Total Other Types of Transfer
Payments |
|
|
|
|
13) Total Program Activity |
$282
|
$5,308
|
-
|
-
|
14) Planned Audits and Evaluations |
An audit of the program will be considered in the next risk based
annual Audit Plan development cycle of Audit and Advisory Services.
A Climate Change Review was completed by TBS in 2005 in lieu of a program
evaluation. |
Note:
- Due to the lateness of tabling the Report on Plans and Priorities 2006-2007,
the Forecast Spending 2005‑2006 reflects the actual spending as published
in the Public Accounts.
|
|