Canadian Food Inspection Agency Canada
Français Contact Us Help Search Canada Site
Home What's New Acts and Regulations Site Map
Food Safety Animal Health Plant Protection Corporate Affairs

bullet Main Page - Livestock and Meat Processing
bullet Main Page - Meat Hygiene Manual of Procedures
bullet Meat Hygiene Directives
bullet Chapter 1
bullet Chapter 2
bullet Chapter 3
bullet Chapter 4
bullet Chapter 5
bullet Chapter 6
bullet Chapter 7
bullet Chapter 8
bullet Chapter 9
bullet Chapter 10
bullet Chapter 11
bullet Chapter 12
bullet Chapter 13
bullet Chapter 14
bullet Chapter 15
bullet Chapter 16
bullet Chapter 17
bullet Chapter 18
bullet Chapter 19

Food > Meat and Poultry Products > Manual of Procedures > Chapter 15  

Chapter 15 - Canning


15.1 Introductions

15.2 Definitions

15.3 Background

  • 15.3.1 Important General Characteristics of Microorganisms
  • 15.3.2 Environmental Characteristics Affecting Growth
    • 15.3.2.1 Nutritional Requirements
    • 15.3.2.2 Moisture Requirements
    • 15.3.2.3 Environmental pH
    • 15.3.2.4 Temperature requirements
    • 15.3.2.5 Oxygen requirements
  • 15.3.3 Clostridium botulinum
  • 15.3.4 Low acid foods

15.4 Establishment: Hygienic Processing Requirements

  • 15.4.1 Raw material requirements
  • 15.4.2 Prevention of cross-contamination
  • 15.4.3 Filling and sealing operations
    • 15.4.3.1 Empty product containers
    • 15.4.3.2 Examination of empty product containers
    • 15.4.3.3 Proper use of product containers
    • 15.4.3.4 Protection of empty product containers during plant cleaning
    • 15.4.3.5 Filling of product containers
    • 15.4.3.6 Vacuum production
    • 15.4.3.7 Closing operations
    • 15.4.3.8 Inspection of closures
      • 15.4.3.8.1 Non-Destructive (visual) inspection for external defects
      • 15.4.3.8.2 Destructive examination of closures
        • 15.4.3.8.2.1 Tear-Down evaluation of rigid metal can double seams
          • 15.4.3.8.2.1.1 Round Can
          • 15.4.3.8.2.1.2 Non-Round cans
        • 15.4.3.8.2.2 Two-piece cans
        • 15.4.3.8.2.3 Identification of can defects
        • 15.4.3.8.2.4 Classification of can defects
      • 15.4.3.8.3 Glass containers
        • 15.4.3.8.3.1 Thermal shock
        • 15.4.3.8.3.2 Classification of glass container defects
        • 15.4.3.8.3.3 Identifying problems in glass containers
        • 15.4.3.8.3.4 Types of closures for glass containers
        • 15.4.3.8.3.5 Examination of closures
        • 15.4.3.8.3.6 Classification of glass closure defects
      • 15.4.3.8.4 Flexible packages
        • 15.4.3.8.4.1 Package Integrity
        • 15.4.3.8.4.2 Flexible package inspection
        • 15.4.3.8.4.3 Action required when serious defects are found
      • 15.4.3.8.5 Product retention for closure defects
    • 15.4.3.9 Handling of containers after closure
    • 15.4.3.10 Coding
    • 15.4.3.11 Washing
  • 15.4.4 Thermal Processing
    • 15.4.4.1 General considerations
      • 15.4.4.1.1 Low-acid foods
      • 15.4.4.1.2 Acidified low-acid foods
    • 15.4.4.2 Establishing scheduled processes
      • 15.4.4.2.1 Low acid-foods
      • 15.4.4.2.2 Acidified Low-acid foods
    • 15.4.4.3 Acidification and thermal processing conditions
      • 15.4.4.3.1 Acidification
      • 15.4.4.3.2 Thermal processing
    • 15.4.4.4 Critical factors and the application of the scheduled process
  • 15.4.5 Equipment and procedures for acidification and thermal processing
    • 15.4.5.1 Acidification systems
      • 15.4.5.1.1 Direct acidification
      • 15.4.5.1.2 Acidification by fermentation and salt curing
    • 15.4.5.2 Instruments and controls common to different thermal processing systems
      • 15.4.5.2.1 Indicating thermometer
      • 15.4.5.2.2 Temperature/time recording devices
      • 15.4.5.2.3 Pressure gauge
      • 15.4.5.2.4 Steam controller
      • 15.4.5.2.5 Pressure safety valve
      • 15.4.5.2.6 Timing devices
    • 15.4.5.3 Pressure processing in steam
      • 15.4.5.3.1 Batch still retorts
        • 15.4.5.3.1.1 Common instruments and controls
        • 15.4.5.3.1.2 Steam inlet
        • 15.4.5.3.1.3 Crate supports
        • 15.4.5.3.1.4 Steam spreaders
        • 15.4.5.3.1.5 Bleeders for condensate removal
        • 15.4.5.3.1.6 Stacking equipment
        • 15.4.5.3.1.7 Vents and venting systems
        • 15.4.5.3.1.8 Venting considerations
          • 15.4.5.3.1.8.1 Venting horizontal retorts
          • 15.4.5.3.1.8.2 Venting vertical retorts
        • 15.4.5.3.1.9 Air inlets
      • 15.4.5.3.2 Batch agitating retorts
        • 15.4.5.3.2.1 Steam inlet (see 15.4.5.3.1.2)
        • 15.4.5.3.2.2 Steam spreaders (see 15.4.5.3.1.4)
        • 15.4.5.3.2.3 Bleeders and condensate removal (see 15.4.5.3.1.5)
        • 15.4.5.3.2.4 Stacking equipment (see 15.4.5.3.1.6)
        • 15.4.5.3.2.5 Vents (see 15.4.5.3.1.7)
        • 15.4.5.3.2.6 Air inlets (see 15.4.5.3.1.9)
        • 15.4.5.3.2.7 Retort or reel speed timing
      • 15.4.5.3.3 Continuous agitating retorts (e.g. FMC)
        • 15.4.5.3.3.1 Steam inlet (see 15.4.5.3.1.2)
        • 15.4.5.3.3.2 Steam spreaders (see 15.4.5.3.1.4)
        • 15.4.5.3.3.3 Bleeders and condensate removal (see 15.4.5.3.2.3)
        • 15.4.5.3.3.4 Vents (see 15.4.5.3.1.7)
        • 15.4.5.3.3.5 Retort and reel speed timing (see 15.4.5.3.2.7)
      • 15.4.5.3.4 Hydrostatic retorts (e.g. Stork)
        • 15.4.5.3.4.1 Indicating thermometers (see 15.4.5.2.1)
        • 15.4.5.3.4.2 Temperature/time recording device (see 15.4.5.2.2)
        • 15.4.5.3.4.3 Pressure gauges (see 15.4.5.2.3)
        • 15.4.5.3.4.4 Steam controllers (see 15.4.5.2.4)
        • 15.4.5.3.4.5 Steam inlet (see 15.4.5.3.1.2)
        • 15.4.5.3.4.6 Bleeders
        • 15.4.5.3.4.7 Venting
        • 15.4.5.3.4.8 Conveyor speed
    • 15.4.5.4 Pressure processing in water
      • 15.4.5.4.1 Batch still retorts
        • 15.4.5.4.1.1 Indicating thermometer (see 15.4.5.2.1)
        • 15.4.5.4.1.2 Temperature/time recording device (see 15.4.5.2.2)
        • 15.4.5.4.1.3 Pressure gauge (see 15.4.5.2.3)
        • 15.4.5.4.1.4 Pressure safety valve (see 15.4.5.2.5)
        • 15.4.5.4.1.5 Pressure control valve
        • 15.4.5.4.1.6 Pressure recorder
        • 15.4.5.4.1.7 Steam controller (see 15.4.5.2.4)
        • 15.4.5.4.1.8 Steam inlet
        • 15.4.5.4.1.9 Steam distribution (see 15.4.5.3.1.3)
        • 15.4.5.4.1.10 Crate supports (see 15.4.5.3.1.3)
        • 15.4.5.4.1.11 Stacking equipment
        • 15.4.5.4.1.12 Drain valve
        • 15.4.5.4.1.13 Water level
        • 15.4.5.4.1.14 Air supply and controls
        • 15.4.5.4.1.15 Cooling water entry
        • 15.4.5.4.1.16 Retort head space
        • 15.4.5.4.1.17 Water circulation
      • 15.4.5.4.2 Batch agitating retorts
        • 15.4.5.4.2.1 Indicating thermometer (see 15.4.5.2.1 and 15.4.5.3.1.1)
        • 15.4.5.4.2.2 Temperature/time recording device (see 15.4.5.2.2)
        • 15.4.5.4.2.3 Pressure gauges (see 15.4.5.2.3)
        • 15.4.5.4.2.4 Pressure safety valve (see 15.4.5.2.5)
        • 15.4.5.4.2.5 Pressure control valve (see 15.4.5.4.1.5)
        • 15.4.5.4.2.6 Pressure recorder (see 15.4.5.4.1.6)
        • 15.4.5.4.2.7 Steam controller (see 15.4.5.2.4)
        • 15.4.5.4.2.8 Steam inlet (see 15.4.5.3.1.2)
        • 15.4.5.4.2.9 Steam spreader (see 15.4.5.3.1.1)
        • 15.4.5.4.2.10 Drain valve (see 15.4.5.4.1.12)
        • 15.4.5.4.2.11 Water level indicator (see 15.4.5.4.1.13)
        • 15.4.5.4.2.12 Air supply and controls (see 15.4.5.4.1.14)
        • 15.4.5.4.2.13 Cooling water entry (see 15.4.5.4.1.15)
        • 15.4.5.4.2.14 Water circulation (see 15.4.5.4.1.17)
        • 15.4.5.4.2.15 Retort speed timing (see 15.4.5.3.2.7)
    • 15.4.5.5 Pressure processing in steam-air mixtures (eg.Lagarde retort
    • 15.4.5.6 Aseptic processing and packaging systems
      • 15.4.5.6.1 Product sterilization equipment and operation
        • 15.4.5.6.1.1 Temperature indicating device (see Sub-Section 15.4.5.2.1)
        • 15.4.5.6.1.2 Temperature recording device (see Sub-Section 15.4.5.2.2)
        • 15.4.5.6.1.3 Temperature recorder-controller
        • 15.4.5.6.1.4 Product-to-product regenerators
        • 15.4.5.6.1.5 Differential pressure recorder-controller
        • 15.4.5.6.1.6 Metering pump
        • 15.4.5.6.1.7 Product-holding section
        • 15.4.5.6.1.8 Start up
        • 15.4.5.6.1.9 Temperature drop in product holding section
        • 15.4.5.6.1.10 Loss of proper pressures in the regenerator
      • 15.4.5.6.2 Product container sterilization, filling and closing operations
        • 15.4.5.6.2.1 Recording devices
        • 15.4.5.6.2.2 Timing method(s)
        • 15.4.5.6.2.3 Start up
        • 15.4.5.6.2.4 Loss of sterility
    • 15.4.5.7 Flame sterilizers, equipment and procedures
    • 15.4.5.8 Other systems
  • 15.4.6 Evaluation of deviation in thermal processing
  • 15.4.7 Cooling
    • 15.4.7.1 Cooling water quality
      • 15.4.7.1.1 Chlorination treatment
  • 15.4.8 Post Process Container Handling
    • 15.4.8.1 Retort crate unloading
    • 15.4.8.2 Container drying
    • 15.4.8.3 Container abuse
    • 15.4.8.4 Post-process cleaning and disinfection

15.5 Quality Assurance

  • 15.5.1 Processing and production records
    • 15.5.1.1 Processing in steam
      • 15.5.1.1.1 Batch still retorts 15.5.1.1.1 Autoclaves statics
      • 15.5.1.1.2 Batch agitating retorts
      • 15.5.1.1.3 Continuous agitating retorts (See 15.5.1.1.2)
      • 15.5.1.1.4 Hydrostatic retorts
    • 15.5.1.2 Processing in water
      • 15.5.1.2.1 Batch still retorts
      • 15.5.1.2.1 Autoclaves statics
      • 15.5.1.2.2 Batch agitating retorts
    • 15.5.1.3 Processing in steam/air mixtures
      • 1.5.1.3.1 Batch still retorts
    • 15.5.1.4 Aseptic processing and packaging
      • 15.5.1.4.1 Product container sterilization conditions
      • 15.5.1.4.2 Product line conditions (see 15.4.5.6)
      • 15.5.1.4.3 Filling and closing conditions (see Sub-Section 15.5.1.4.1)
    • >15.5.1.5 Flame sterilizers
  • 15.5.2 Record review and maintenance
    • 15.5.2.1 Processing records
    • 15.5.2.2 Container closure records
    • 15.5.2.3 Water quality records
  • 15.5.3 Retention of records

15.6 Storage and Transport of Finished Product

15.7 Laboratory Control Procedures

15.8 End Product Sepcification

15.9 Incubation

  • 15.9.1 Incubation facilities
  • 15.9.2 Product requiring incubation
  • 15.9.3 Incubation samples
  • 15.9.4 Incubation temperature and time
  • 15.9.5 Incubation checks and records maintenance
  • 15.9.6 Abnormal containers
  • 15.9.7 Shipping

15.10 Records to Maintain

  • 15.10.1 Processing and production records
  • 15.10.2 Distribution records
  • 15.10.3 Incubation records

15.11 Required Inspection Procedures (Additional to normal monitoring of construction, sanitation, etc.)

  • 15.11.1 Verification of empty container inspection
  • 15.11.2 Verification of handling and storage of incoming product, product preparation, filling and closure operations
  • 15.11.3 Verification of retort operations
  • 15.11.4 Verification of cooling operations and post retort handling
  • 15.11.5 Controlling incubation procedures
  • 15.11.6 Verification of distribution records

15.12 Lot Sampling and Inspection Procedures

15.13 Recall Procedure

15.14 Guidelines for Temperature Distribution Studies When Processing in Steam Still Retorts Excluding Crateless Retorts

  • 15.14.1 Introduction
  • 15.14.2 Application
  • 15.14.3 Inventory of the thermal processing system
    • 15.14.3.1 Lay-out diagram
    • 15.14.3.2 Steam supply to the retorts
      • 15.14.3.2.1 Boiler(s) capacity (psi or kPa)
      • 15.14.3.2.2 Retort header pressure
      • 15.14.3.2.3 Headers, manifolds, lines and valves
      • 15.14.3.2.4 All connecting steam lines other than to the retort
    • 15.14.3.3 Retort(s)
      • 15.14.3.3.1 Retort shell
      • 15.14.3.3.2 Retort crates
      • 15.14.3.3.3 Steam supply from pressure/steam regulator to retort
      • 15.14.3.3.4 Steam control
      • 15.14.3.3.5 Air system for controls (if applicable)
      • 15.14.3.3.6 Other piping and required equipment
      • 15.14.3.3.7 Recording device
    • 15.14.3.4 Loading equipment
    • 15.14.3.5 Selection of test retort(s)
  • 15.14.4 Test equipment
    • 15.14.4.1 Data logger
    • 15.14.4.2 Thermocouples
    • 15.14.4.3 Temperature indicating device
    • 15.14.4.4 Pressure indicating device(s)
    • 15.14.4.5 Stuffing box (packing gland)
  • 15.14.5 Standardization of test equipment
    • 15.14.5.1 Retort Mercury-in-glass (MIG) thermometer (or equivalent temperature indicating device)
    • 15.14.5.2 Temperature measurement system (e.g. data logger, thermocouples, extension wires, or other Temperature Measuring Devices (TMD) etc.)
  • 15.14.6 Placement of the temperature measuring devices in the retort
  • 15.14.7 Preparing the test crates or baskets with containers
  • 15.14.8 Temperature distribution test
    • 15.14.8.1 Set-up
    • 15.14.8.2 Critical items
    • 15.14.8.3 Important items
    • 15.14.8.4 Conducting the test
    • 15.14.8.5 Required parameters for the determination of a vent schedule



Top of Page
Top of Page
Important Notices