A legacy for future generations, The Long Term Vision and Plan

Phase 3 (2012 - 2016)

Centre Block

Arial view of Parliament Hill

Among Parliamentary Precinct buildings, the Centre Block is uniquely important. As home to the Senate and House of Commons Chambers, the offices of senior parliamentarians and major committee rooms, the Centre Block symbolizes Canada's system of government. It is also the Precinct building most in need of repair. Beginning in 2012 - after other buildings have been readied to fill its place temporarily - the Centre Block will be closed for 5 years to allow extensive renovations.

Renewing A Heritage Treasure

After decades of use without major repairs, most Centre Block components - including its foundations, exterior masonry, rooves, windows, and building systems to name a few - are all in urgent need of repair or replacement. The program of Centre Block repairs planned for Phase 3 of the Long-Term Vision and Plan includes:

Substructure & Structure

  • Excavation and foundation underpinning.
  • Deepening of the basement for new mechanical equipment.
  • Seismic reinforcement of the towers.
  • Roof repairs.

Exterior Cladding

  • Masonry conservation of the north, west, east and courtyard façades to the same standard as the South Façade (repaired in 1997).
  • Window replacement and door conservation.
  • New copper where not already renewed

Interior Partitions, Doors & Finishes

  • Selective demolition and reinstatement to accommodate new mechanical systems.
  • New baseboard and trim detail for electrical and information distribution in offices.
  • Restoration of art finishes, trim, stained glass, etc.

Mechanical Systems

  • Replace existing plumbing.
  • Replace existing heating, ventilation and air conditioning systems
  • Introduction of sprinklers where not already present.
  • Elevators refurbishment

Electrical / Information Systems

  • Complete replacement.
  • Create new pathways for electrical, communications and security cabling.

Furnishings

  • Rehabilitate heritage furniture.

When the renovations are complete in 2016, the Centre Block will again house the Senate and House of Commons Chambers, as well as five modern committee rooms, press facilities, office units for parliamentarians, and a wide variety of support services.