Performance Report FY 01-02
SD Performance Report 01-02 PDF
File - 421K
Table Of Contents
- Goal No. 1:
PWGSC will green its operations as a custodian and provider of facilities and common-use office space to federal departments and agencies
- Reduce Greenhouse Gas Emissions
- Reduce Energy Consumption
- Implement Environmental Management Systems
- Implement Means to Comply More Effectively with the Canadian Environmental Assessment Act (CEAA)
- Responsible Management of Hazardous Waste
- Responsible Management of Asbestos
- Implement Integrated Pest Management
- Responsible Management of Contaminated Sites
- Develop and Implement Environmental Emergency Response Plans
- Responsible Management of Ozone-Depleting Substances
- Reduce Water Consumption
- Responsible Management of Tenant Office Waste
- Develop and Implement Environmentally Responsible Leasing Practices
- Goal No. 2:
PWGSC will green the services it provides to federal departments and agencies in its role as a common-service agent
- Expand Use of e-Purchasing-Cataloguing Application
- Increase Capacity to Deliver Real Property Projects in an Environmentally Responsible Manner
- Facilitate Green Procurement in Government
- Green Services as Property Manager of Other Custodial Departments' Properties
- Reduce Paper Consumption in Services Provided to Client Departments
- Provide Tools to Green Federal Government Travel
- Goal No. 3:
PWGSC will green its internal operations
- Reduce Paper Consumption in PWGSC
- Develop and Deliver Environmental Training Programs for Employees of PWGSC
- Increase Internal Purchases of Environmentally Responsible Goods and Services
- Green PWGSC Fleet Activities
- Increase Environmental Awareness in PWGSC Employees
- Encourage Green Travel within PWGSC
Executive Summary
Public Works and Government Services Canada (PWGSC) is currently
working toward fulfilling the three goals set out in its second
Sustainable Development Strategy (SDS 2000). Simply put, PWGSC is
seeking to "green" its facilities, to"green"
the services that it makes available to other federal departments
and agencies, and to "green" its own internal operations.
This summary reviews PWGSC's performance during Fiscal Year 2001-2002
and its progress toward meeting the targets associated with each
goal.
Excellent progress is being made. Of the 43 departmental targets:
- five have been achieved ahead of schedule including three by
more than 25-percent of the target;
- 19 have been achieved on schedule;
- 16 are still in progress (deadline dates are still in the future);
- one was missed for reasons outside of the department's control;
and,
- two targets exist where data is not available or is inconclusive.
Overall, we are reducing the environmental footprint of our facilities.
We have developed an ISO 14001 Environmental Management System
and in particular, have achieved full ISO registration of the Esquimault
Graving Docks. Reductions of our Greenhouse Gas Emissions are on-track
to meet our long-term Kyoto related target. Hazardous materials
have been removed from service, we have improved our waste management
practices and are on-track to do more. We have taken steps to improve
our leasing practices.
As a common service agency, we are assisting other departments
in the greening of their operations. We have taken steps to make
the delivery of real property projects and property management services
more environmentally responsible. We have expanded e-Purchasing
and found other ways to reduce paper consumption related to the
services we offer. There is now a tool provided to facilitate green
travel and we are on-track to facilitate green purchasing by others.
PWGSC has also "greened" our internal operations through
the reduction of our own paper consumption, increased purchases
of environmentally responsible goods and services and the use of
alternative fuel vehicles in our vehicle fleet. We have also taken
positive steps to increase environmental awareness in our own employees.
Last fiscal year, the department significantly improved its environmental
management processes as it brought itself in line with ISO requirements,
making the achievement of targets more reliable. While there is
great room for optimism, it should also be recognised that the achievement
of several of the remaining targets will not be easy. Some can best
be viewed as "stretch" targets.
While much has been achieved, success will likely breed expectations
that are even higher. The challenge will be to find new and cost-effective
means to further reduce environmental impacts while continuing to
support other key initiatives such as long-term costs reductions
and broader government objectives. A significant challenge will
also exist to share the means of achieving our successes with others,
whether in the public or private sectors, so that they may achieve
the same.
Public Works and Government Services Canada
Public Works and Government Services Canada (PWGSC) was created
in June 1993 through the amalgamation of Public Works Canada,
Supply and Services Canada, the Government Telecommunications Agency,
and the Translation Bureau.
PWGSC's operating environment is complex and our activities are
broad in scope. The department has approximately 12,000 employees,
supporting the work of more than 100 federal departments and
agencies. The department provides office accommodation for some
179,000 public servants and parliamentarians who work in more than
2,500 locations across the country.
PWGSC manages a diverse real property portfolio, including some
400 buildings worth more than $6.8 billion, and administers more
than 2,000 leases every year in every province and territory. The
department's real property portfolio also includes wharves, dams,
bridges, housing and unoccupied lands, for a total of more than
1,900 real property assets.
As the nation's largest contracting agent, PWGSC annually issues
over 50,000 contracts for approximately $8 billion of goods and
services on behalf of its client departments, representing about
60-percent of the federal government's contracting in goods and
services.
Through Government Telecommunications and Informatics Services
(GTIS), PWGSC provides electronic infrastructure services to support
government operations, information management and information technology
(IM/IT) services. It acts as a key delivery agent of the government's
IM/IT Federated Infrastructure, which provides a secure delivery
channel for electronic commerce and electronic service delivery
government-wide.
PWGSC also performs the government's Receiver General functions,
prepares the Public Accounts, banks and disburses all public money
for the government, and administers the government's payroll and
pension plans.
Our goal at PWGSC is to provide the best value for taxpayers' dollars
in common and central services for the Government of Canada, with
due regard for the important values of prudence, probity and transparency.
By focusing on what PWGSC does best, providing cost-effective services
to government, we help departments focus on what they do best.
Background
n accordance with the 1995 amendments to the Auditor General
Act, Ministers tabled their first Sustainable Development Strategy
(SDS) in Parliament in 1997. The legislation calls for updates to
the SDS to be submitted at least once every three years.
Each fall, Departmental Performance Reports are tabled in Parliament
to report on departmental activity over the previous fiscal year.
Beginning in FY 2000/2001, the SDS portion of the PWGSC Departmental
Performance Report referenced a separate, more detailed account
of the progress of the department toward meeting its SDS objectives.
The same approach has been followed this year and has been adopted
as PWGSC's practice for reporting against its SDS commitments.
Since tabling its first SDS in 1997, PWGSC has been engaged in
a process of continuous learning and improvement. Data collection
systems have been developed and modified. The initial SDS targets
were refined to enhance measurability of performance. Reporting
mechanisms have been adjusted to better align with existing frameworks.
At the heart of this ongoing effort is the attainment of the following
aims:
- to integrate a comprehensive Environmental Management System
(EMS) into PWGSC's overall management framework and ensure environmental
performance is achieved and sustained according to established
objectives;
- to green PWGSC's operations, using a pollution-prevention approach
to meet or exceed requirements of applicable environmental regulations
and policies;
- to green PWGSC's daily activities by practising Green Citizenship;
and
- to assist clients in their initiatives to green operations wherever
feasible, and purchase environmentally responsible goods and services.
This report will examine each of these broad aims, looking at specific
targets, performance highlights, areas of concern and corrective
action planned.
Goal No. 1: PWGSC will green its
operations as a custodian and provider of facilities and common-use
office space to federal departments and agencies.
Objective 1.1
Reduce Greenhouse Gas Emissions
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
Reduce the production of greenhouse gas (GHG) emissions.
As per the Federal House-in-Order Strategy, PWGSC will limit
GhG emissions from buildings to a CO2 equivalent
of 619.3 kilotonnes per year by 2010.
|
Total GHG emissions from PWGSC Crown-owned buildings during
the 2001/2002 fiscal year were equivalent to 590.1 kilotonnes
of CO2.
|
Continue to implement measures to reduce energy consumption
as outlined in Objective 1.2.
|
About Greenhouse Gas Reductions
PWGSC is a full participant in the Federal House-in-Order (FHIO)
initiative aimed at identifying opportunities to improve energy
efficiency and reduce greenhouse gas (GHG) emissions. The FHIO initiative
is the Government of Canada's own contribution to the National Action
Program on Climate Change. The purpose of the initiative is to demonstrate
leadership by reducing GHG emissions from federal government operations.
Canada's Kyoto Protocol commitment is to reduce the country's GHG
emissions by 2008/2010 to a level six-percent below the 1990 level.
PWGSC conducted a building energy-use assessment to identify the
potential for energy efficiency and GHG emission reductions. The
assessment resulted in PWGSC's GHG emission reduction strategy and
a three-year action plan. The department is on track to reduce PWGSC
emissions, by 2010, to a level 19-percent below the 1990 level;
considerably exceeding Kyoto Protocol targets. (This excludes contributions
from "green power" purchases).
To ensure that these projects take priority, a special PWGSC program
for the implementation of building energy initiatives has been established.
The scope of these activities is as follows:
- comprehensive building energy audits;
- building operations refinements (recommissioning);
- implementation of Federal Buildings Initiative (FBI) projects
where they are cost effective;
- implementation of the National Capital Area central heating
plant strategy; and
- establishment of a national energy management reporting protocol.
A key strategy under PWGSC's SDS 2000 commitment to reduce greenhouse
gas emissions is the purchase of green power, which the department
is tasked to undertake on behalf of the federal government. To date,
PWGSC has achieved the following:
- it has established an interdepartmental management infrastructure;
- it has signed Memoranda of Understanding with suppliers having
green power production capabilities (SaskPower, Maritime Electric
in PEI, Nova Scotia Power, Newfoundland and Labrador Hydro, and
New Brunswick Power); and
- it is negotiating with Nova Scotia Power and New Brunswick Power
to secure an annual 190 gigawatt hour (GWh) supply of green
power. The department also plans to issue, on or before December 31, 2002,
a Request for Proposal for an annual purchase of 225 GWh
of electricity from renewable resources in Alberta and Ontario.
Objective 1.2
Reduce Energy Consumption
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2005, implement energy conservation measures
associated with the Federal Buildings Initiative and other
programs in PWGSC Crown-owned buildings, when an energy assessment
has demonstrated that it is cost effective to do so.
|
Cost effective energy-saving measures have been implemented
in 60-percent of the Crown-owned inventory (233 of 391 facilities).
|
Continue to assess PWGSC Crown-owned buildings for energy
conservation opportunities and implement cost effective measures
where they are identified.
|
By March 31, 2002, introduce enhanced energy-efficiency specifications
into the 23 sections of the National Master Specifications
relating to equipment that uses energy.
|
Target complete.
All sections of the NMS have been reviewed for the inclusion
of environmentally responsible choices.
|
Continue to monitor technological change and ensure appropriate
sections are updated as industry evolves and lessons learned
are published.
|
About Energy Consumption
Energy efficiency is a key component of PWGSC operating practices
and has reduced building energy consumption over the past decade.
However, energy consumption is on the rise again in response to
increasing inventory demands, and these demands are expected to
continue to escalate over the next ten years.
The Federal Buildings Initiative (FBI) program is being evaluated
to assess its applicability to PWGSC building stock with floor areas
of under 10,000 square metres. To date, 44-percent of PWGSC office
space (48 buildings) have received energy-saving upgrades under
the FBI program. The 29 contracts, which cost $40 million,
will save $6.5 million a year, so that the upgrades will pay for
themselves in six years. Crown-funded energy-saving upgrades were
implemented in an additional 20-percent of PWGSC office space (139
buildings). With the FBI and Crown-funded energy-saving upgrades
combined, 60-percent of PWGSC office building space has been upgraded.
The National Master Specification (NMS) is a specification guide
for both public- and private-sector specification writers. The NMS
is a library of master specifications with some 720 separate
sections covering all aspects of the construction industry for both
vertical and horizontal construction. The NMS is a "delete
master". This means PWGSC must try to ensure the NMS contains
everything that a designer would need to tell a contractor delivering
a new or renovated construction project or facility. In reality,
even in PWGSC projects, about 25-percent of the information in the
average project specification is derived from sources other than
the NMS. Departmental Policy 039 (Use of the National Master
Specification) specifies that the NMS must be used as the basis
for producing construction specifications on projects done by or
for PWGSC. The Department of National Defence has a similar policy.
Adding Specification Notes to the NMS outlining the use of more
energy-efficient equipment in the construction of facilities is
just one of the many actions that have been taken by the NMS Secretariat.
Other environmentally responsible strategies include writing articles
on construction waste and demolition, contaminated sites, hazardous
material remediation, water use efficiency, greenhouse gas reduction
initiatives and ozone-depleting substances. All of these initiatives
affect PWGSC projects and their impact filters down to construction
projects in general in Canada. The NMS is seen internationally as
a model on how to include environmentally responsible activities
and products in everyday construction.
Objective 1.3
Implement Environmental Management Systems
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, implement an environmental management
system (EMS) consistent with ISO 14001 at the Real Property
Services (RPS) corporate level.
|
Target has been met.
|
Continual improvement based upon the Annual EMS Reviews.
|
By March 31, 2004, implement an EMS consistent with ISO 14001
in the 107 PWGSC Crown-owned facilities with a floor area
of 10,000 square metres or more.
|
66-percent complete: weighted average from the regional performance.
|
Continued application of the Key Performance Indicator (KPI)
for EMS including the application of corrective actions for
deficiencies noted in the Environmental KPI Reviews.
|
About Environmental Management System Implementation
The PWGSC Environmental Management System (EMS) Manual was published
on-line on the department's intranet site in the Fall of 2001. Branches
are developing their respective Environmental Management Systems
in keeping with the corporate direction.
In FY 2000/2001, an internal Real Property Services (RPS)
branch EMS Review indicated that the RPS EMS had reached 100-percent
conformance with three of five ISO 14001 elements, and 90-percent
conformance with the remaining two elements. An EMS Manual was required
to achieve full conformance with the remaining two elements. During
FY 2001/2002 RPS completed its EMS Manual and released it as an
interim draft, pending translation and completion of the full approval
process through the RPS Policy Network. RPS retained the Canadian
General Standards Board CGSB, an ISO 14001 Registrar, to verify
that the RPS EMS was consistent with the requirements detailed in
the ISO 14001:1996 Standard. In their review of the RPS EMS Manual,
CGSB found only three minor non-conformances with ISO 14001, and
recommended that RPS could proceed with a pre-registration audit.
Two of the three non-conformances have been rectified. The remaining
non-conformance will be addressed with the updating of the Departmental
Policy 074 - the PWGSC Environmental Policy during FY 2002-2003.
Facility-level target
The verification of the RPS corporate elements at the facility-level
is achieved through the Environmental Key Performance Indicator
(KPI) Review. The criteria stipulated for the EMS portion of the
review has been expanded to articulate clearly what must be in place
so that the facility is fully conforming to the RPS EMS. Through
the continued application of the KPI for EMS, full conformance with
the RPS EMS is achieved and assured.
ADM Update article, August 2002
This is an extract from an article on a nation-wide initiative
to achieve ISO registration for RPS pilot programs. Seven
of 11 projects in RPS are now registered to the ISO 9001 or
ISO 14000 standard, demonstrating their commitment to a world-class
standard of quality or environmental management. The following
success story is from the Pacific Region.
Esquimalt Graving Dock
The Esquimalt Graving Dock is owned and operated by PWGSC.
The facility is capable of handling vessels of up to 100,000
tonnes.
This ship building and repair yard near Victoria, B.C., is
the largest civilian dry dock on the West Coast of North America.
The Dock is owned and operated by PWGSC, which provides its
services for a variety of private-sector companies.
Recognizing that ship building and repair
work can have significant environmental impacts, PWGSC decided
to implement an Environmental Management System (EMS) for
the facility and have it registered to the ISO 14001 standard.
A major challenge was to attain support for the endeavour
not only from PWGSC staff but from private-sector users as
well. To do this, the project team formed a committee of all
affected parties and convinced tenants of the wisdom and benefits
of adhering to an EMS. The team then developed an EMS manual
of operating protocols for all activities, products and services
conducted and provided at the Dock over which PWGSC has influence
or control. Users were invited to participate in EMS training
sessions for PWGSC employees. This helped promote the "buy
in" of everyone involved.
The Canadian General Standards Board registrars
had nothing but praise for the Esquimalt Graving Dock team
and publicized the story in their magazine, Calibre.
The article points out that the Dock is the first publicly
owned, multi-user ship repair facility to obtain registration
and one of only three large shipyards in the world to achieve
this designation.
|
Objective 1.4
Implement Means to Comply More Effectively with the Canadian
Environmental Assessment Act
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, develop and implement a departmental Canadian
Environmental Assessment Act (CEAA) follow-up monitoring
framework.
|
A departmental CEAA monitoring framework has been developed
and implemented for environmental assessment (EA) quality
assurance. The framework outlines a cyclical three-year program.
Implementation of the first program was completed in 2001/2002.
|
No corrective action required.
|
About CEAA Compliance
Purpose of the CEAA
PWGSC assesses the environmental effects of its projects in accordance
with the provisions and regulations of the Canadian Environmental
Assessment Act (CEAA). CEAA sets out the responsibilities and
procedures involved in conducting environmental assessments (EAs)
of projects in which the federal government holds decision-making
authority. The purpose of the Act is to ensure that environmental
impacts are considered before action is taken; to promote sustainable
development; to ensure an efficient EA process; to eliminate or
minimize adverse environmental effects; and to provide for public
participation.
Under CEAA, PWGSC must conduct an EA before it:
- commits to carry out a project;
- provides financial assistance to a proponent to enable a project
to be carried out;
- sells, leases, disposes of or otherwise transfers control or
administration of land to enable a project to carried out; or,
- issues a regulatory approval to permit a project to be carried
out.
The level of environmental assessment required will vary, depending
on the nature of the project and the significance of any potential
environmental impacts. Most projects are assessed relatively quickly
under what is known as a screening level environmental assessment,
as opposed to the more rigorous comprehensive study process.
Environmental assessment is also a useful tool for ensuring that
other legislation, such as the Fisheries Act and the Canadian
Environmental Protection Act, are considered during a project's
planning stages. In addition, CEAA ensures that social and economic
issues are considered in a project's development and design.
PWGSC Performance and Initiatives
During the 2001/2002 fiscal year, PWGSC continued to apply CEAA
legislation to its proposed undertakings. This commitment is reiterated
in PWGSC's Environmental Policy, Departmental Policy 074.
PWGSC has fulfilled the requirements of the Canadian Environmental
Assessment Act (CEAA) target by completing a three-year compliance
monitoring framework which was developed and implemented for environmental
assessment quality assurance. Completion of the program involved
implementation of the action items identified to improve the National
EA Program. Such actions included holding the first National Workshop
of EA Regional Coordinators, delivering EA training for PWGSC staff,
and creating procedural guidelines.
PWGSC continues to use CEAA checklists to document whether proposed
projects are legally required to conduct an environmental assessment.
The checklists are tracked using both manual and electronic reporting
systems. In 2001/2002, it was reported that 1,631 PWGSC proposals
were assessed to determine whether CEAA requirements applied. Of
these, 1,550 were exempted from EA requirements, either because
they were not "projects" as defined by the Act, or because
they were projects listed in the Exclusion List Regulations. The
remaining 81 projects required EAs. Only one project required a
comprehensive study. The other 80 projects required EA screenings.
At the end of the fiscal year, 63 of the screenings had been completed
and the remaining 17 were on-going.
During 2001/2002, PWGSC worked on means to better monitor the number
of projects requiring EAs, including improvement of the CEAA Checklist
in our Project Business Management System (PBMS) and the related
electronic checklist reporting system.
Besides conducting EAs during 2001/2002, PWGSC undertook other
initiatives to ensure CEAA compliance, high-quality EA practices,
and consistency amongst regional EA practitioners.
For example, PWGSC introduced the Guide for Environmental Assessment
Follow-Up and Monitoring for use by EA practitioners and project
managers. The Guide enables them to determine when and how to implement
EA follow-up programs and use mitigation monitoring techniques.
PWGSC also began to develop the Environmental Assessment Officer's
Guide as a supplement to the department's Environmental Assessment
Manual for PWGSC, which was initiated in the previous
fiscal year. The Guide is intended to help EA practitioners conduct
and prepare nationally consistent EA analyses and reports.
In addition, the first Environmental Assessment National Workshop
was held in December 2001; EA practitioners from every region and
representatives from the Canadian Environmental Assessment Agency
attended. Workshop outcomes included commitments to:
- develop national EA report templates and terms of reference;
- develop topic-specific reference guides to improve the efficiency
of CEAA implementation;
- make recommendations to further tailor the department's CEAA
monitoring framework;
- implement the framework's Quality Assurance Program in 2002/2003;
- develop tools to better track and report on the number of projects
requiring EAs and to ensure that the CEAA is considered early
in the planning process; and,
- develop best practices to clarify roles and responsibilities
throughout the EA process.
Many of these items, such as the Environmental Assessments for
Real Property Services' Projects were started and completed
in 2001/2002, while others will be undertaken in 2002/2003 or in
future years. To maintain communication among regions, monthly teleconferences
have been initiated and continue to be held to provide a forum for
sharing information about best practices and the achievement of
the above-mentioned objectives.
Further to its commitment to improve departmental EA practices,
PWGSC continued to deliver a one-day training session entitled
Introduction to Environmental Assessment . The purpose of the
EA course is to help employees understand and apply federal EA legislation
and procedures. During FY 2001-2002, the course increased delivery
and participation. Implementation by PWGSC EA practitioners was
very successful and generated much positive feedback.
Strategic Environmental Assessments
Although not mandated under the CEAA, strategic environmental
assessments (SEAs) provide a process for evaluating the environmental
effects of policies, plans or programs and their alternatives. SEA
direction is found in the 1999 Cabinet Directive on the Environmental
Assessment of Policy, Plan and Program Proposals. During 2001/2002,
PWGSC completed a number of SEAs for departmental plans and
policies. These SEA processes and the resulting lessons learned
continue to provide guidance for future PWGSC SEA projects.
Objective 1.5
Responsible Management of Hazardous Waste
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, develop a protocol to use economical alternatives
to hazardous materials and processes that generate hazardous
waste (reflects SDGO target).
|
Target has been met. The protocol has been finalized and
currently a distribution and implementation strategy is being
developed.
|
To support the protocol, PWGSC entered into a Memorandum
of Understanding (MOU) with Canadian Centre for Occupational
Health and Safety to jointly develop an online database which
will give users access to information on thousands of hazardous
materials/products and their alternatives.
The database format was completed by March 31, 2002 and will
be completely populated by March 31, 2003.
|
By March 31, 2002, remove from service the three remaining
PWGSC transformers that
contain askeral PCBs.
|
Target has been met.
The three remaining transformers in the Parliamentary Precinct
were removed this fiscal year.
|
No further action required.
|
About Hazardous Materials Management
Hazardous Materials
PWGSC has a list of more than 260 hazardous materials currently
in use throughout its facilities. The main hazardous materials present
in PWGSC facilities include oils, glycol, fluorescent lamps, batteries
and cleaning solvents. Some of these materials are more toxic than
others. Some have been targeted by Canadian environmental legislation
for elimination or life-cycle management. Hazardous materials not
targeted should still be considered for 3R management opportunities:
reduce (e.g., practise material substitution, perform preventive
maintenance, use appropriate purchasing and inventory management
techniques); reuse (e.g., modify equipment, install alternative
equipment on site); and recycle (e.g., practise on-site or
off-site recycling).
PWGSC Departmental Policy 037, the Workplace Hazardous Materials
Information System (WHMIS) Policy, requires that, "prior
to purchasing chemical/hazardous products for the workplace, Managers
in charge of worksites and Supervisors should determine if a suitable
substitute can be purchased that is not hazardous or that is less
hazardous".
The Protocol to Promote the Use of Alternative Hazardous Materials
and/or Processes for PWGSC was developed in order to meet the
requirements of PWGSC Departmental Policy 037 and SDS Objective 1.5.
There are financial as well as environmental considerations in
reducing the use of hazardous materials. In general, buying hazardous
material alternatives may cost more but, on the other hand, disposing
of hazardous waste may cost many times more than disposing of normal
waste.
When it is not possible to use non-hazardous material, PWGSC licenses
private-sector disposal firms to dispose of hazardous wastes through
long-term contracts. The contracts stipulate that all applicable
Acts and Regulations must be adhered to during all stages of removal
and final disposal. PWGSC receives Certificates of Disposal for
all its hazardous materials. A typical PWGSC office facility generates
fewer than 100 kg of hazardous waste per year, and that amount is
diminishing every year.
Polychlorinated biphenyls (PCBs)
Polychlorinated biphenyls (PCBs) were widely used prior to 1980
as a dielectric fluid in electrical equipment enhancing conductivity
in transformers. They pose a serious threat if released into the
environment or involved in a fire. The by-products of their combustion,
if burned at too low a temperature, are dioxins and furans,
which are carcinogens. All 35 tonnes of PCB waste materials held
in PWGSC storage in 2001/2002 were transferred for destruction.
The percentage of PWGSC Crown-owned inventory considered to be
PCB-free declined slightly from the previous year to 57-percent,
due to more accurate information collection during the past year.
There are no longer any askarel-filled transformers in the PWGSC
inventory. In the National Capital Area (NCA), six transformers
with a concentration of more than 50 parts per million of PCBs remain,
but are undergoing decontamination. The success of this decontamination
process has yet to be determined, due to technical problems with
the program. Virtually all the PCBs left in PWGSC buildings are
in lighting ballasts. These are routinely removed as refits, renovations,
maintenance procedures, and energy-conservation measures are implemented.
It is therefore anticipated that the year-by-year elimination of
PCBs will be gradual.
Environment Canada is currently reviewing the regulations that
govern PCB storage and disposal and has been involved in public
meetings and discussions with other departments regarding the proposed
changes to the Regulations.
Standing offers for PCB disposal have been established across the
country as a service to PWGSC and other government departments.
Objective 1.6
Responsible Management of Asbestos
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2003, achieve full implementation of the National
Asbestos Management Plan at all asbestos-containing Crown-owned
PWGSC facilities.*
|
72-percent complete:
167 of 233 asbestos-containing facilities have an asbestos
management plan (AMP).
|
The target has had to be extended by a year because the Asbestos
Management Plan required additional time to achieve full implementation
in all asbestos-containing Crown-owned PWGSC facilities.
Director of Maintenance Management has issued instructions
to the Regional officials to complete the remaining AMPs by
March 31, 2003.
|
*This target was modified by the Report of Plans
and Priorities for FY 2002/2003. Please visit http://www.tbs-sct.gc.ca/est-pre/20022003/rGSC___e.pdf
for details.
About Asbestos Management
Asbestos is the common name for a group of naturally occurring
mineral silicates best described as having long, thin, easily separated
fibres. Because they are naturally occurring, asbestos fibres can
be found virtually anywhere. Asbestos is primarily used as an insulating
material and a fire retardant.
Two main classes of materials contain asbestos:
- Friable materials - when dry, these can be crumbled, pulverized
or reduced to powder by hand
- Non-friable materials - these remain intact under hand pressure
Because of the health risks (lung cancer and other diseases) associated
with exposure to asbestos and to asbestos dust in particular, friable
products are now banned from production.
Asbestos Management Plan
PWGSC is highly involved in the stewardship of federal buildings.
Departmental Policy 057, Asbestos Management, provides the
department with a framework for asbestos management. The policy
includes a code of practice with guidelines for monitoring, reporting,
communicating, training and conducting of assessments and surveys.
The PWGSC Asbestos Management Plan (AMP) has been developed to meet
federal and provincial regulatory requirements.
The AMP was developed to enable the department to:
- identify all friable asbestos materials;
- maintain all accessible friable asbestos materials in good condition;
- prevent unintended asbestos exposures to client staff and visitors,
contractors, and PWGSC staff;
- manage all construction and maintenance activities that might
disturb asbestos materials; and,
- comply with all federal, provincial, territorial and municipal
requirements for occupational health and safety, and environmental
control.
In 2001/2002, PWGSC implemented AMPs in 72-percent (167 of 233)
of its facilities identified as containing asbestos. The relative
percentage remains unchanged from 2000/2001 for the following reasons:
- AMPs are only implemented in buildings where asbestos may be
disturbed due to renovation or retrofit projects, or maintenance.
Facilities may be listed as containing asbestos, yet have no AMP
because the asbestos is contained in locations where it poses
no risk to health.
- The number of buildings identified as containing asbestos fluctuates
because initial asbestos surveys cannot always determine the presence
of asbestos. Asbestos may not be discovered until a building's
walls and ceilings are removed to expose the inner cavities. This
is not practical during the initial survey, nor is it recommended,
as there is no threat of exposure from contained asbestos. Consequently,
a major renovation or retrofit project requiring the removal of
a wall or ceiling may reveal asbestos that, until then, has not
been found. With the passage of time, increasing numbers of major
retrofits can be expected to result in the identification of additional
buildings containing asbestos, allowing its progressive removal.
- The sale or demolition of older facilities is progressively
reducing the inventory of asbestos-containing buildings.
Objective 1.7
Implement Integrated Pest Management
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2003, implement integrated pest management plans
at applicable Crown-owned PWGSC facilities.
|
30-percent complete: 117 of 386 facilities that
require an integrated pest management (IPM) plan have IPM
practices in place.
|
To clarify the intent of the target, the requirement for
an IPM plan has been changed to a requirement for an implemented
IPM program. A checklist will be used to measure IPM compliance
on a per-building basis.
|
About Integrated Pest Management
PWGSC is responsible for protecting personnel and the integrity
of property from the harmful effects of pests. Any decision to use
chemical control measures must follow a careful assessment of the
value of the asset at risk and the potential damage to personal
health. Integrated Pest Management (IPM) is defined as
a decision-making process that uses cultural, natural, mechanical
and chemical controls to suppress pests effectively, economically
and in an environmentally sound manner. Applying IPM minimizes any
adverse environmental impact and risk associated with using pesticides.
The PWGSC Guidance Document on Integrated Pest Management (IPM)
and Sustainable Landscape Design and Maintenance is now available
as a PDF document, downloadable through the departmental intranet
site. This will assist the Client Service Units in developing and
assessing their IPM programs.
In October 2001, representatives of federal custodial departments
and agencies established a Working Group under the Federal
Committee on Environmental Management Systems (FCEMS) so as to have
a formal mechanism for developing a standard approach for pest management
decisions in federal government operations. The mandate of the Working
Group, co-chaired by PWGSC and National Defence, was to ensure that
current directives, policies and initiatives of the federal government
are consistent with Integrated Pest Management principles and practices,
beginning with lawn care.
Guidance for the Implementation of IPM in Federal Government
Operations was drafted by the working group as a first step
towards developing a general policy that could be adopted by all
federal custodial departments and agencies. The document is currently
being circulated in both official languages within all departments
and agencies to gather comments before the Working Group reconvenes
in the fall of 2002.
In addition, a National Best Practice on Integrated Pest Management
has now been included in the RPS Environmental Management System
Manual. This Best Practice reflects much of the approach
recommended in FCEMS draft document on Integrated Pest Management.
Objective 1.8
Responsible Management of Contaminated Sites
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2003, complete the assessment of all PWGSC sites
for contamination, including determination of the extent of
contamination. *
|
On track to meeting the target.
83-percent complete.
Assessments have been completed at 703 of the 850 sites on
record. Of the remaining sites, 53 are currently under assessment.
|
Those sites with the greatest likelihood of contamination
have been assessed. The target was extended by a year,
because a discrepancy in the inventory of real property sites
reported for PWGSC expanded the number of sites to be considered
in this initiative. The remaining sites are expected to pose
a low risk of contamination, but still must be assessed
To manage contaminated sites data more effectively, a Records
Management Best Practice document will be prepared, along
with an updated CatchAll screen which will include Geographic
Information System (GIS) capabilities.
These activities are in the design stage during FY 2002/2003,
and will be incorporated into the Project and Business Management
System (PBMS) in FY 2003/2004.
|
By March 31, 2003, complete preparation of plans for remediation
or risk management of PWGSC sites where contamination has
been identified.
|
44-percent complete.
Remediation or risk management plans have been prepared for
63 of the 144 sites on record where contamination has been
identified.
|
As a result of the delay in receipt of funding for the National
Capital Area, a small portion of the remaining activities
may have to be completed in FY 2003/2004 in order to complete
this target.
|
*This target was modified by the Report of Plans
and Priorities for FY 2002/2003. Please visit http://www.tbs-sct.gc.ca/est-pre/20022003/rGSC___e.pdf
for details.
About Responsible Management of Contaminated Sites
If managed improperly, contaminated lands, sediments and waters
can be both a financial and a regulatory environmental burden. Dealing
with a contaminated site involves assessing the site, evaluating
the risk, doing careful remediation where warranted, and conducting
continuous monitoring. By sharing and implementing best practices,
existing contamination problems can be solved and future problems
prevented.
Under the 2000/2001 contaminated sites program at PWGSC, significant
progress was made in completing the environmental site assessment
work. The number of sites that were assessed increased in 2001/2002.
Assessments have been completed at 703 of the 850 sites on record.
Five hundred and forty-three require no further action and 18 were
remediated. Of the 144 sites where contamination was identified,
remediation or risk management was ongoing at 44 sites and plans
had been prepared for another 19.
The process of reconciling the Directory of Federal Real Property
(DFRP) and PWGSC's Facility Inventory System (FIS) has created new
challenges in defining the real property inventory. Formerly, targets
involved only office buildings, as these structures were considered
to pose the biggest environment risk for PWGSC. In 2000/2001, PWGSC
included all types of assets (including office buildings, housing,
infrastructure and land) in its reporting program, for an overall
inventory of close to 1,400 assets. This increased the challenges
and pressures facing our environmental management resources in meeting
our contaminated sites targets. However, with resources provided
by the Treasury Board Secretariat through its Federal Contaminated
Sites Assessment Initiative, PWGSC was able to increase the number
of sites assessed significantly, and to prepare management plans
for known contaminated sites.
Regarding assets not formerly reported on, PWGSC continued to employ
integrated risk management principles in order to complete the assessments
in the most cost-effective manner. The majority of these assets
include residences, infrastructures and unused lands which generally
present a lower risk of contamination than more intensive-use sites
such as buildings, where more contaminant sources may exist. As
a result, PWGSC is completing screening-level reviews of these properties
in order to evaluate past land use and to prioritize them in a more
cost-effective manner for environmental site assessment activities.
As for residences, a representative sampling approach has been
taken to evaluate the presence of contamination in this type of
land use.
Objective 1.9
Develop and Implement Environmental Emergency Response Plans
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
Specific targets to be established pending finalization of
requirements for environmental emergency response plans in
light of proposed CEPA regulations.
|
34-percent complete:
42 of 122 facilities requiring an environmental emergency
response plan (EERP) have one.
|
Target will be on track to being met by 2004, provided that
funding is identified through the Building Management Plan
Process and that funds are subsequently provided to the Infrastructure
Continuity Unit.
|
About Environmental Emergency Response Plans
An Environmental Emergency Response Plan (EERP) is designed to
deal with events that threaten the environment and human health.
It is an integral part of an infrastructure continuity plan (ICP),
which is an emergency response plan aimed at dealing with threats
that may affect the daily operations of a particular facility.
Under the provisions of the Canadian Environmental Protection
Act (CEPA), a building or facility must have a plan in place
for dealing with substances that may harm the environment or pose
a risk to human health if they enter the environment as a result
of an emergency. In keeping with that notion, PWGSC has taken on
the task of developing EERPs and processes for its facilities, and
of offering these services to all federally-owned or managed facilities.
The ICP/EERP initiative is also a requirement under the Emergency
Preparedness Act and supports PWGSC's departmental policies
and Sustainable Development Strategy commitments.
Objective 1.10
Responsible Management of Ozone-Depleting Substances
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, complete a full evaluation of the PWGSC
inventory of equipment containing major ozone depleting substances
(ODS) and implement further ODS recovery enhancements, or
phase out replacements to achieve a downward trend in
weighted ozone-depleting potential (ODP).
|
PWGSC is currently updating a per-region ODS equipment inventory.
|
A CFC phase-out strategy for ODS equipment with a cooling
capacity of over 100 tonnes is currently being prepared.
|
By March 31, 2002, replace all PWGSC-owned halon systems.
|
Target was not met. Four halon systems remain (at the clients' request).
In February 2002, through Memoranda of Understanding (MOUs)
with other government departments (OGDs), PWGSC assumed responsibility
for an additional five halon systems.
|
PWGSC continues to discuss the need for a conversion or replacement
with the clients. Funding is in place for the replacement
of the system during 2002/3003.
PWGSC is currently developing phase-out plans for these systems.
|
About Managing Ozone-Depleting Substances Responsibly
Safeguarding the earth's ozone layer and preventing the accumulation
of greenhouse gases are important international issues. To meet
current standards and avoid adverse long-term environmental effects,
PWGSC has targeted the phase-out of ozone-depleting substances (ODSs)
because of their contribution to climate change and the depletion
of the earth's ozone layer.
In 1987, Canada signed an international agreement known as the
Montreal Protocol on Substances that Deplete the Ozone Layer. Under
this agreement, the production, import and export of ODSs and their
use in certain situations have been or will be restricted or prohibited
in accordance with the deadlines set in the Montreal Protocol and
in its subsequent amendments. The Kyoto Protocol reinforces Canada's
commitment to addressing climate change.
At PWGSC facilities, ODSs are used in chillers and in air-conditioning
and refrigeration systems for the most part, which account for most
of the traditional refrigerants such as chloroflurocarbons (CFCs)
and alternative refrigerants such as hydroflurocarbons (HFCs) and
hydrochloroflurocarbons (HCFCs). ODSs are also found in fire protection
systems and extinguishers that use halons.
Based on the 2001/2002 ODS inventory, the following table summarizes
the quantities of ODS materials contained in PWGSC equipment. These
respective ozone-depleting and global warming potentials are expressed
in terms of kilogram equivalents of baseline substances.
PWGSC 2001/2002 inventory of ODS equipment
ODS Material
|
Quantity in Service (kg)
|
Ozone-Depleting Potential (equivalent kg of CFC 11)
|
Global Warming Potential (equivalent kg of CO2)
|
Refrigeration and air-conditioning equipment
|
CFCs
|
7,448
|
6,534
|
32,747,613
|
HCFCs
|
20,244
|
941
|
20,900,018
|
HFCs
|
17,069
|
0
|
22,189,765
|
Other
|
45
|
1
|
107,956
|
Total
|
44,806
|
7,476
|
264,045,352
|
|
Halon Systems
|
Total halons
|
319
|
3,193
|
1,981,840
|
PWGSC developed its 1992 CFC Management Strategy by adopting a
phase-out approach commensurate with the Montreal Protocol. Therefore,
rather than immediately replacing all CFC-containing equipment,
PWGSC developed a systematic replacement, conversion and improvement
approach. To date, equipment that could be converted has been, with
a limited replacement of equipment. A new strategy focusing on our
largest pieces of equipment which contain CFCs (chillers with a
cooling capacity of over 100 tonnes) is being prepared.
Regulatory requirements relating to the management of ODS materials
became more stringent with the introduction of the Federal Halocarbon
Regulations (FHRs), 1999 under Part IX of the Canadian Environmental
Protection Act. These Regulations focus on refrigeration, air
conditioning, solvent cleaning and fire protection systems for the
federal house (Government of Canada operations and operations under
federal jurisdiction). These Regulations, which came into effect
on July 1, 1999, put in place new control measures for the end-use
of ODSs and their halocarbon alternatives for activities in the
federal house. The objectives are to minimize releases, require
recovery and recycling, establish reporting mechanisms and to implement
environmental awareness training. Training on the Regulations continued
to be delivered to appropriate PWGSC staff in 2001/2002.
Objective 1.11
Reduce Water Consumption
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, implement water conservation measures
at all PWGSC Crown-owned facilities, when it is feasible and
cost-effective to do so (reflects SDGO target).
|
191 of 386 facilities, representing 65-percent of PWGSC Crown-owned
floor area, have implemented water saving initiatives.
|
Additional measures to be taken:
- A template for Water Management plan for particularization
by Regional staff is being developed
- A template for Occupant Awareness Program for water conservation
is being developed
- Regions are continuing to investigate water conservation
measures, conduct water assessment/audits and pursue water
conservation projects.
|
About Water Consumption
Water conservation measures have been implemented in 65-percent
of the PWGSC floor space in Crown-owned facilities. The remaining
35-percent of the Crown-owned inventory is being evaluated. It is
suspected that it will not be cost-effective to implement water
savings in approximately 30-percent of the remaining inventory because
of the type of facility, i.e., warehouses, storage sheds, small
office buildings, etc.
There are many barriers to implementing a consistent national water
conservation program. In general, many of these barriers are linked
to the inconsistent price of water, which varies from region-to-region
and city-to-city. The price that PWGSC is charged for consumption
varies similarly. In major centres in Ontario and Quebec, for example,
the price of water may be five times higher than it is on both coasts
(excluding Vancouver), a fact that directly affects the implementation
of water conservation initiatives for every region. In other cases,
the city charges a flat rate or includes the water charges in its
property tax structure. Unless direct negotiations are undertaken,
a successful water conservation program will not result in
a lower water bill and will make cost-effectiveness impossible.
With this in mind, water conservation should and will remain on
the PWGSC agenda. As demands on potable water increase and water
treatment costs rise, the cost-effectiveness of a water conservation
program will only increase in importance. Specific initiatives that
are unfeasible today may become feasible in the future, and regions
where water costs are low today may see sharp increases in the future.
While continuing to implement the cost-effectiveness programs, PWGSC
is positioning itself to continue implementing new programs as opportunities
arise.
Objective 1.12
Responsible Management of Tenant Office Waste
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, achieve and maintain an average of 60-percent
diversion rate of office solid waste from landfill and incineration
in Crown-owned RPS facilities - i.e., 60-percent by weight
of all office solid waste is to be recycled (reflects SDGO
target).*
|
Target has been met:
62-percent diversion rate
10,663,334 kg of a total 17,200,326 kg of waste was
diverted from landfill.
|
The wording of this target was modified to reflect that nationally,
municipal solid waste programs do not all have recycling capabilities,
making diversion from landfill difficult. Therefore, the target
has been changed to reflect an intended performance standard
to maintain an overall average diversion rate of 60% nationally.
No further corrective action required
|
*This target was modified by the Report of Plans
and Priorities for FY 2002/2003. Please visit http://www.tbs-sct.gc.ca/est-pre/20022003/rGSC___e.pdf
for details.
About Tenant Office Waste Management
Of the 767 landfills operating nation-wide, 41-percent will likely
reach capacity within the next six years. The federal government's
1992 Green Plan acknowledged this issue by committing to divert
from landfill 50-percent of the waste generated in its own operations
by 2000 (relative to 1988 levels). Studies carried out by Environment
Canada have established a 1998 benchmark of 190 kg per full-time
equivalent employee per year for the overall waste-generation level
(landfilled and diverted from landfill combined). A federal office
worker generates about one-tenth the waste produced by a typical
household, with paper fibre accounting for 86-percent.
PWGSC provides office accommodation for almost 200,000 federal
servants working in more than 1,000 sites. In its capacity as common
service provider, PWGSC is implementing an extensive office recycling
program. The program, called Recycling for the Nation, involves
educating occupants to either reuse their office supplies or place
their office waste into special collection centres and containers
so that the waste may be manufactured into new products such as
office paper or file folders. More than 90-percent of normal office
waste is potentially recyclable. The Ottawa offices of the Treasury
Board Secretariat and Finance Canada were informed of their outstanding
accomplishment during celebrations for Environment Week 2002. An
enhanced motivational program is under development to honour workplaces
that achieve exceptional performance.
When offices achieve outstanding recycling performance, six types
of benefits occur:
- Recycling establishments may pay departments up to $6.00 per
year per employee in supplementary funds for the waste they recycle;
- the cost to the taxpayer for landfill or incineration is reduced
from $8.50 to $2.85 per year per employee;
- one tree is saved per year per employee;
- municipal waste disposal requirements decrease;
- a reduction of 0.09 metric tonnes in Greenhouse Gas emissions
is achieved per year per employee; and,
- for every 25 workers, approximately one box of surplus office
supplies, such as binders, is made available for donation either
to charities or to local school boards.
Despite the target being achieved, PWGSC staff, through its Green
Citizenship Network, has expressed a strong desire to perform within
the top quartile of federal workers. In the National Capital Region,
at PWGSC's Client Service Unit Office for Indian and Northern Affairs
Canada and in the Parliamentary Precinct, approximately 100 employees
are operating a vermiculture composting system. In other locations,
refundable beverage containers are collected with proceeds going
to local charities. New communication tools and localised performance
reporting systems are being piloted.
Canadians readily understand which types of paper, metals and glass
are recyclable. However, they have trouble determining which plastics
to recycle. This is the long-term educational challenge facing policy-makers.
The large variety of plastics used in consumer product packaging,
coupled with improper individual sorting and soiled products, makes
it extremely difficult to obtain high-quality recyclable plastic
from home or office recycling programs. A joint effort by the department,
its service providers and municipalities has made the issue manageable
to date. A continuing effort by all parties will be required in
the future. The issue will have to be re-examined by the department
in the coming years in terms of the cost-effectiveness of recycling
plastic. As landfill capacity becomes scarce, European-style wet/dry
municipal collection systems will become more prevalent in Canada.
These next-generation systems reduce the amount of individual sorting.
Halifax, Guelph and Edmonton are currently operating such systems.
Objective 1.13
Develop and Implement Environmentally Responsible Leasing Practices
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, implement cost-effective multi-material
recycling in lease facilities where the infrastructure exists
and where PWGSC is the majority lessee.
|
- Four pilot projects are underway in two Regions.
- The PWGSC National Centre of Expertise (NCOE) on Leasing,
in conjunction with the Department of Justice, has developed
a clause on multi-recycling. The clause will become part
of PWGSC's Specimen Lease.
- Architectural and Engineering Services in RPS is reviewing
the use of the Project and Business Management System (PBMS)
as a tracking tool. It has identified three sites for pilot
project implementation.
|
The consultation process with the regions and Crown Assets
Distribution Centres has been completed. The clause and operating
procedures will be finalized in 2002 and ready for implementation.
The Environmental Services Directorate is to set up reporting
process using PBMS. Funds for implementation have been requested
in the Annual Reference Level Update (ARLU). Full completion
is expected by September 2003.
|
By March 31, 2002, complete a Green Leasing Strategy in consultation
with clients and private-sector stakeholders.
|
A Green Leasing Strategy has been completed. Through an initial
assessment of standards for leased accommodation, opportunities
have been identified and are being discussed with the Building
Owners and Managers Association (BOMA) Canada and other interested
stakeholders.
|
PWGSC is committed to ensuring ongoing discussions with clients
and private-sector stakeholders in the implementation of a
green leasing strategy by promoting opportunities and initiatives
and by developing applicable standard lease provisions.
|
About Environmentally Responsible Leasing Practices
PWGSC holds approximately 2,000 leases, representing some two million
square metres of space. The standard leasing document requires landlords
to:
- grant PWGSC the right to reuse existing improvements in space
offered;
- ensure compliance with legislation;
- ensure the absence of hazardous materials (friable asbestos,
formaldehyde and PCBs);
- ensure the provision of multi-material recycling and paper recycling
programs where recycling facilities exist in the community;
- grant PWGSC the right to conduct environmental assessments of
projects; and
- ensure that all workplace cleaning products are classified,
labelled and environmentally responsible.
In addition, leases include a Consumer Price Index (CPI) adjustment
clause that includes energy expenditures. This clause has been recognized
as an effective energy-saving inducement and an innovative business
practice. The CPI clause permits landlords to benefit financially
from any energy-efficiency savings measures they implement.
Goal No. 2:
PWGSC will green the services it provides to federal departments
and agencies, in its role as a common service agent.
Objective 2.1
Expand Use of e-Purchasing Application
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By April 2004, expand external client base for the e-Purchasing
application.
|
The external client base has expanded. As of March 31, 2002,
there were approximately 218 PWGSC clients and 96 clients
in other government departments (OGDs) using e-Purchasing.
|
The approach has changed. The focus is now on the Government
of Canada Marketplace (GoCM), e-Purchasing replacement. However,
some enhancements are being made to e-Purchasing to benefit
existing clients or to implement new legislation.
Those PWGSC staff with acquisition cards (credit cards) are
encouraged to use the application in making purchases.
|
By April 2004, increase number of green products and suppliers
available in the e-Purchasing application.
|
The number of green products and suppliers has increased.
As of April 2002, the e-Purchasing catalogue listed about
31 suppliers, 18 of which supply green products. Of the 46,519
products listed in the catalogue, 1,472 are considered green.
An electronic e-Purchasing call-up document for software
acquisitions has been developed.
|
PWGSC will work with standing-offer suppliers to add products
to the e-Purchasing catalogue.
PWGSC will consult with client departments to determine which
products and services should be targeted.
|
About Use of e-Purchasing-Cataloguing
A lead departmental working group has been established to participate
actively with PWGSC's Electronic Supply Chain Sector (ESCS) to meet
the objectives of the Government of Canada Marketplace (GoCM), which
is replacing e-Purchasing. This working group will provide a forum
where client departments can work together with the ESCS project
team, the GoCM service provider, and various PWGSC supply business
areas, to prepare their organizations for GoCM implementation. The
four participating departments are Transport Canada, the Royal Canadian
Mounted Police, the Transportation Safety Board of Canada and PWGSC.
In addition, ESCS convenes a committee called the Business Design
Coordination Team (BDCT), which has representation from approximately
15 client departments as well as the ESC Steering Committee, which
is chaired by the ADM Supply Operations Service Branch (SOSB). The
ESC Steering Committee also has representation from approximately
15 client departments - although not necessarily the same departments
that are part of the BDCT. The BDCT provides input into the functional
design of the new service. The Steering Committee provides advice
on strategies and the vision of a government-wide electronic procurement
system that will meet the needs of PWGSC and its client community.
The GoCM environment will be defined to support SDS commitments.
Objective 2.2
Increase Capacity to Deliver Real Property Projects in an Environmentally
Responsible Manner
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 2002, complete development and by March 31, 2004,
complete application of the key tools used in the department's
project delivery system.
|
Development of Key Tool: completed.
The PWGSC - Building Research Establishment Environmental
Assessment Method (BREEAM) Green Leaf Environmental Performance
of Buildings prototype design guide has been completed. This
complements those tools already developed and applied to the
Architectural and Engineering Services Project Delivery System.
|
RPS is working with industry to further develop and refine
design assist tools to more effectively incorporate sustainable
development into project delivery. This field is rapidly evolving
and will require review to maintain currency with these developments.
Demonstration projects are being identified to evaluate effectiveness
of the tools developed to date. The RPS Environmental Training
program is ongoing and includes application of these enhanced
tools for the project delivery system.
|
Improve application of construction, renovation and demolition
(CRD) waste management practices by at least 25-percent per
year to reach full implementation by March 2004 (reflects
SDGO target).
|
In the baseline year, 2000/2001, 25-percent of projects needed
to be implemented to reach the target. In 2001/2002, an increase
of a further 25-percent was required to reach 50-percent of
all projects.
Of the 747 projects that were reported on nation-wide, 271
indicated implementation of CRD waste management practices,
while 476 indicated that no diversion of materials had been
undertaken.
|
Steps are being taken to improve reporting completeness and
accuracy. Training on CRD waste management implementation
is ongoing and underlines the importance of this initiative.
|
About Environmentally Responsible Project Delivery
The main activities targeted in this area are to complete the development
of key tools used in the departmental Project Delivery System (PDS),
and then to ensure that these tools are put into use.
The key tool which remained to be developed was a building environmental
performance assessment system applied to the departmental Project
Delivery System. A prototype building assessment tool based on the
internationally recognized Building Research Establishment Environmental
Assessment Method (BREEAM) system has been completed. A complementary
BREEAM system already exists in the Department's asset management
system related to Operations and Maintenance. Other tools which
had already been developed include:
- The Generic Request for Proposals, incorporating Sustainable
Development Principles;
- The Architects' Guide to the Sustainable Design of Office Buildings;
- The Environmentally Responsible Construction and Renovation
Handbook, Ed. 2;
- The Green Office at a Glance;
- The RPS Construction, Renovation and Demolition Non-Hazardous
Solid Waste Management Protocol; and,
- The Construction, Renovation and Demolition (CRD) Screening
Tool.
While these tools have been developed, this area is rapidly evolving,
and we are continuing to work with industry representatives to further
enhance and improve them. We will also continue to examine departmental
Project Delivery practices and update them as opportunities occur
when it is feasible to do so. For example, the subject of investment
and cost analysis will continue to be an area for research and development.
In the regions across Canada, several projects, in their planning
stages, are already using this or another fully complementary system
know as Leadership in Energy and Environmental Design (LEEDTM).
These projects include new construction, such as the Government
of Canada Buildings in Charlottetown, PEI and Vancouver, BC as well
as major renovations such as the Victoria Memorial Museum Building,
the CD Howe Building, L'Esplanade Laurier and the National Portrait
Gallery of Canada, all in Ottawa.
The AthenaTM Environmental Impacts Estimator computer
program has also been used to evaluate design alternatives for a
number of projects on a demonstration basis. Finally, Natural Resources
Canada's Commercial Buildings Incentive Program has also been successfully
applied to two recent projects in the Gatineau, Quebec area to achieve
improved energy performance in a lease proposal. This experience
is being repeated for two additional projects in Ottawa Ontario.
Construction and demolition activities in Canada are the largest
contributors to solid waste in landfills, accounting for between
25- and 30-percent of all waste. Ontario has implemented waste management
regulations and a number of other provinces are in the process of
developing similar measures. Municipalities across the country are
imposing increasingly strict landfill bans on an ever-broadening
range of construction materials. It is clear that PWGSC needs to
adopt effective CRD waste management practices. Accordingly, the
department will continue to work with organizations such as the
Canadian Construction Association to achieve this objective.
The department has embarked on a program to incorporate CRD waste
management more effectively into project delivery. There have been
some notable successes. These include the demolition of Industry
Canada's Electronics Testing Laboratory in Ottawa (99-percent diversion
rate), the renovation of the East Memorial Block in Ottawa (89-percent
diversion rate), and the decommissioning of the former United States
naval base at Argentia, Newfoundland, where enormous amounts of
construction material were diverted from landfill. Similar successes
can be found in every region of the country.
Although PWGSC has made significant progress in managing CRD waste,
a full evaluation of whether the 50-percent implementation target
can be reached cannot be fully assessed. Reporting in this area
is to be enhanced to capture more complete information for CRD projects.
From the sample of data reported, 271 projects out of 742 (36-percent)
have incorporated some CRD waste management initiatives for their
project.
Objective 2.3
Facilitate Green Procurement in Government
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, ensure that environmental impacts are
taken into consideration in all PWGSC contracting.
|
A green contracting strategy (GCS) has been drafted and provided
to senior management.
A green procurement course has been developed. As of March
31, 2002, 147 contracting officers have taken the training.
|
Green procurement training will continue to be provided to
all contracting officers.
Further promotional initiatives are underway to increase
participation.
|
About Green Procurement in Government
The Green Contracting Strategy (GCS) will need to be approved.
Once the GCS is approved, PWGSC contracting sectors and regions
will undertake supporting actions and will work with clients to
ensure their needs are being met. PWGSC will encourage clients and
employees to consider environmental impacts in making purchasing
decisions.
The Green Procurement Network, a website for federal employees,
is one of the tools that has been developed to help clients and
employees become more aware of the environmental factors that need
to be considered in making purchasing decisions.
PWGSC has provided venues where clients can meet suppliers of green
goods and services.
Green procurement training is an important part of greening federal
government procurement and it will be provided to all contracting
officers. PWGSC is promoting the green procurement course with client
departments. Green procurement training has also been given to 21 employees
of other government departments.
Objective 2.4
Green Services as Property Manager of Other Custodial Departments'
Properties
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, the EMS and SDS reporting of PWGSC's property
management services will, at the request of the client:
- be commensurate with the objectives and targets of the
client SDS; and
- be commensurate with the level of service in PWGSC Crown-owned
facilities
|
Target has been met. A protocol on levels of service
available to other government departments (OGDs) has been
developed.
|
Conduct client awareness consultation identifying the availability
of this service.
Work with Regional Client Service Unit Directors to explore
potential opportunities with regional clients for meeting
the clients' SDS targets and objectives.
Meet with clients to negotiate agreements as requested.
|
About Green Services as Property Manager of Other Custodial
Departments' Properties
Where the Other Government Department (OGD) clients are custodians,
PWGSC, upon request, will help develop their reporting mechanisms
based on the current templates used within PWGSC. The mechanisms
will be customized for the OGD to incorporate their own objectives
and targets.
PWGSC will continue to provide environmental services currently
offered to PWGSC property managers and OGD clients. It will continue
to customize services based on specific needs expressed by the clients,
e.g., laboratories, fleets, penitentiaries, etc.
The tracking and reporting capacities of PWGSC's Environmental
Management System and Sustainable Development Strategy have been
included in a menu of services offered to clients for incorporation
into client agreements.
ADM Update September 2002
RPS and the RCMP enter partnership
RPS has successfully entered into one of
the largest Transfer of Administration agreements ever undertaken
by the department.
On April 1, 2002, a major Transfer of Administration
between RPS and the Royal Canadian Mounted Police (RCMP) came
into effect. The transfer, which is also commonly referred
to as a custody transfer, applied to the RCMP's national headquarters
in Ottawa, as well as most of its divisional headquarters
across Canada. The only exceptions are Whitehorse, Yukon and
the Depot training academy in Regina.
"This is a very significant achievement,"
said Henry Sano, Director of the RCMP National Client Service
Unit (NCSU), RPS. "The RCMP has placed tremendous trust in
us in our new 'landlord' role, but our focus has not changed.
Our job continues to be one of providing the best service
that we can for the Force."
The RCMP National Headquarters, located
in Ottawa, is one of the locations involved in the recent
Transfer of Adminstation Agreement between RPS and the RCMP.
The custody transfer involves the transfer
of property administration and responsibility for 10 RCMP
sites in total to PWGSC. The day-to-day operations and maintenance
of the RCMP facilities and the long-term up-keep and care
of these assets will now fall under the responsibility of
RPS.
The agreement allows PWGSC to further its
mandate as the primary service provider of office accommodation
for Government of Canada departments. In addition, it also
allows the RCMP to focus its resources on its core mandate
- that of policing and law enforcement.
In addition to an operating and recapitalization
budget worth approximately $40 million each year from the
RCMP to RPS, the branch has also gained some new faces as
a result of the agreement. A total of 10 employees were transferred
from the RCMP to RPS
|
Objective 2.5
Reduce Paper Consumption in Services Provided to Client Departments
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
Save 2.2 million kilograms of paper annually by making Government
of Canada payments and receipts electronically, thus saving
cheques, envelopes and deposit slips.[5]
|
Target exceeded:
2.4 million kg of paper saved in FY 2001/2002. [5]
|
An error was made in the formula used to determine the amount
of paper saved as a result of electronic banking and direct
deposits. The original target of 22.4 million kilograms was
incorrect and has been modified accordingly.
Actual quantities exceed the target. The amount of paper
saved is increasing every year as a result of growth in electronic
payments and non-postal receipts. [5]
|
By April 2002, eliminate hard copy billing for telecommunications
products and services.
|
Target 100-percent complete. The Telecommunications Sector
of GTIS reported that all 144 departments or agencies were
receiving detailed billing for information electronically.
|
As of April 2002, 100-percent of our clients were receiving
their detailed billing information electronically via the
Service Utility software. However, to meet audit regulations,
hardcopy invoices must be sent for signature and filing, and
this practice will continue.
Our clients continue to receive ongoing training on Service
Utility software and procedures.
|
By April 2002, expand client base for the Taxi Management
System, thereby eliminating the need to reconcile paper copies
with responsibility centres.
|
As of April 2002, the Materiel Management Division has used
the Taxi Management System (TMS) to manage the release of
taxi chits to 419 PWGSC clients. The TMS is used by 11
other government departments, with 1,412 clients using taxi
chits.
|
The business functions being fulfilled by the Taxi Management
System are currently under review.
|
By August 2002, increase client base for Government Enterprise
Network (GENet) secure remote access.
|
User increase: 67-percent
As of February 2002, 21 of 144 departments or agencies were
using the GENet Secure Remote Access service, with a total
of 3,900 active users.
|
Continue the marketing of the Secure Remote Access (SRA)
service. However, the service will begin to migrate to the
new Secure Channel Network over the coming months, with the
migration expected to be complete by mid-2003. As a result,
continued work on the GENet SRA is being curtailed in view
of the migration activities. This item will be tracked in
future as part of Secure Channel activities.
|
By April 2002, expand client base for the Secure Access Key
Management Service. SAKMS is a government-wide access key
that allows: secure transmission of information; authenticates
sender and recipient of information; establishes authentication
of transmission - cannot deny payment was received for example;
and ultimately will lead to real e-commerce.
|
User increase: 29-percent
As of March 2002, 52 of 144 departments or agencies were
using the SAKMS service, with a total of 11,000 Public Key
Infrastructure (PKI)-registered users.
|
As part of the Government Telecommunications and Informatics
Services (GTIS) program to increase use of the SAKMS service,
and thus increase the opportunity for more electronic transactions
across departments and agencies, the SAKMS project will:
- continue to work with Government Operational Service (GOS)
on developing a production environment/architecture for
Web Public Key Infrastructure (PKI)-enabled applications
for the Employee Pension Benefit Statement project which
would deliver PKI certificates to all public servants and,
eventually, pensioners;
- decide on the best operational model, including the outsourcing
option; and complete the phased rollout of the Web PKI infrastructure
in support of GOS and other departments.
|
About Paper Reduction
Direct Deposit
Government Operational Service (GOS) saves more than two million
kilograms of paper annually by issuing Government of Canada payments
electronically.
During the 1990s, campaigns were carried out to encourage those
receiving cheques to convert to direct deposit. Direct deposit is
now a mature payment method. GOS continues to promote its use through
enrolment forms available from financial institutions, as well as
through the inclusion of the direct deposit option on applications
for government benefits.
Each electronic payment saves 0.016 kilograms of paper, namely
the weight of a cheque and an envelope. In baseline year 1991/1992,
a total of 22,262,008 payments were issued electronically, saving
approximately 360,000 kilograms, or 0.36 million kilograms of paper
in all. The savings continued to increase in subsequent years as
shown in the following graphs.
Greening Telecommunications Billing Details
The Telecommunications Sector of the Government Telecommunications
and Informatics Services (GTIS) Branch delivers common telecommunications
services to the government-wide community and acts as a broker in
leveraging its buying power to provide the highest quality at the
lowest prices.
For some years, the Telecommunications Sector has been proactively
promoting the reduction of paper in the billing process. Thanks
to the gradual streamlining of processes and improved electronic
tools, Telecommunications clients were sold on the idea of moving
towards electronic billing information. While minimum paper invoicing
was maintained, Service Utility software enabled users to access
detailed invoice information electronically from their desktops.
This gave them the capability to perform customized reports on service
usage and inventory information, allowing trend analysis and other
management functions. At present, all 144 federal institutions
have accepted the use of the Service Utility alternative to access
detailed billing information electronically.
The implementation of the paper reduction process and the transition
to Service Utility software was well received by clients, and achieved
the following:
- it eliminated 1.5 million paper attachments, or the equivalent
of approximately 300 boxes of paper, per year;
- it saved thousands of trees; and,
- it supported the statement from the 1999 Speech from the Throne,
in which the federal government committed itself to becoming a
model of environmental excellence in its own operations.
Taxi Management System
The old taxi management system used many types of paper for its
settlement and notification procedures. Except for the actual taxi
chits, the current system is paperless, since approval of the books
and payment through the Enterprise Resource Planning Systems is
done electronically.
Scanning, which is part of the proposed new release, would provide
an electronic audit trail and improve storage and reporting.
Government Enterprise Network (GENet)
The Government Enterprise Network (GENet) is a Transmission Control
Protocol / Internet Protocol- (TCP/IP) based government-wide extranet
that interconnects the networks of federal departments, agencies,
boards, commissions and provinces. GENet allows access to common
applications and information, as well as optional access to the
global Internet. The dedicated departmental GENet connection includes
a router, an access line and a fully managed network connection.
Clients have a choice of two management services: standard (8 a.m.
to 8 p.m., five days a week) or extended (24 hours a day, seven
days a week).
GENet is an essential part of the federal information technology
infrastructure and supports federal e-commerce and e-service delivery
initiatives by providing access to information and services not
available by any other means. A GTIS flagship offering, GENet serves
over 100 departments and agencies.
GENet provides a broad range of connection options and speeds,
including:
- Dedicated connections - DS0, multiple DS0 and DS1 across Canada;
xDSL; Ethernet and ATM (2 Mbps to 100 Mbps); and
- Dial-up connection - analogue up to 56 kbps (local calling in
over 70 sites, 1(800) for the rest of Canada and the U.S.) or
ISDN up to 128 kbps.
As part of the Secure Remote Access (SRA) services, GENet is proving
to be successful in all 21 participating departments, with the number
of users growing daily. By June 2003, the entire service will
have migrated to the new Secure Channel network.
Secure Applications and Key Management Service
Fast, simple and cost-effective - the Internet is the preferred
means for exchanging electronic information and conducting commercial
transactions. To implement electronic commerce in government, departments
need two types of security services - confidentiality services and
signature-based services. GTIS has the solution: its Secure Applications
and Key Management Service (SAKMS) provides a robust public key
infrastructure (PKI).
SAKMS delivers confidentiality services at the Protected "B" security
level to prevent unauthorized disclosure of information that may
violate the Privacy Act or Government of Canada security
policy. Signature-based services (access control, proof of origin,
data integrity and non-repudiation) are provided for actions requiring
a certain level of authorization, perhaps because they establish
a contractual commitment or involve access to costly resources.
SAKMS has proven its worth - it has provided PKI security technology
for the past five years and it services more than half of all government
departments. SAKMS received national attention as a finalist in
two different categories of the Distinction Awards, a program run
by Technology in Government (GTEC).
Objective 2.6
Provide Tools to Green Federal Government Travel
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, develop and promote tools to encourage
government employees to stay in environmentally responsible
hotels.
|
The tool has been developed. Travellers can now search electronically
for hotels with "Green Leaf" ratings in the Accommodation
Directory for Government Employees.
|
PWGSC will encourage staff to use the Directory in
selecting their hotel:
- by making presentations on travel which promote the Green
Leaf Eco-Rating Program.
- the Request for Standing Offer (RFSOs) includes a description
of the Green Leaf Eco-Rating Program to encourage hotels,
motels and other properties providing commercial accommodation
to participate in the Program.
|
About Green Federal Government Travel
The Accommodation Directory for Government Employees provides
lists, by city, of hotels that offer special rates on accommodation
for employees travelling on official government business in the
performance of their duties. In an effort to provide employees with
environmentally responsible choices, the Directory provides
information about a hotel's membership in the Green Leaf program
and now permits employees to search the Directory by Green
Leaf rating.
The Hotel Association of Canada Green Leaf™ Eco-Rating Program
is a graduated rating system designed to identify hotels committed
to improving their environmental performance. The program, managed
by TerraChoice Environmental Services, recognizes environmental
achievements by rewarding one to five green leaves: one for a minimum
commitment to a set of environmental principles and two to five
for results in applying those principles.
Goal No. 3: PWGSC will green
its internal operations.
Objective 3.1
Reduce Paper Consumption in PWGSC
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, all paper for printers and photocopiers
will contain recycled content.
|
The 2001/2002 standing offer for paper includes EcoLogo paper
and paper with recycled content.
In the National Capital Area, the Materiel Management Division
purchases only recycled paper.
|
Continue efforts to promote the use of paper with recycled
content.
|
By April 2002, increase use of on-line forms, electronic
forms (ELF), for departmental transactions.
|
As of February 2002, Forms Management had converted 1,107
of PWGSC's 1,737 active hardcopy forms into electronic forms
on the ELF system (a 64-percent achievement). Of the
remaining 630 forms not in ELF, a large percentage are non-fillable
forms such as envelopes, coloured letterhead, etc. and the
like.
|
As part of its ongoing program, Forms Management will:
- increase awareness of ELF and encourage its use throughout
the organization;
- encourage management within branches, regions and special
operating agencies to eliminate the ordering and use of
hardcopy forms wherever possible;
- undertake, as part of plans for the 2003/2004 fiscal year,
a departmental review of paper-based forms to confirm
that a business requirement still supports their availability
in paper format;
- ensure, where feasible, that new forms are only available
to employees in electronic format through ELF, unless paper
forms can be justified;
- continue to offer the ELF application to other government
departments via Knowledge Exchange Services (offered by
Government Telecommunications and Informatics Services).
|
Save 259,000 kilograms of paper annually by recycling redeemed
cheques and Employment Insurance claimant cards and by reusing
storage boxes.
|
Paper saved in 2001/2002 - 243,000 kg
|
Successful growth in electronic processing of payments and
Employment Insurance claims has reduced cheque and card volumes
and, consequently, the amount of recycling accordingly.
|
By June 2001, reduce by 50-percent the paper used by the
department's media clipping service, from the average levels
in the 1998-2001 planning period.
|
Project completed, goal exceeded. Paper used by the department's
media clipping service reduced by 90-percent.
|
No corrective action required.
|
By June 2001, reduce by 50-percent the paper used for the
department's employee publication, Ensemble, from average
levels in the 1998-2001 planning period.
|
Project completed, goal exceeded. Paper used for publishing
Ensemble reduced by 100-percent.
|
No corrective action required.
|
About Paper Consumption in PWGSC
The number of boxes of paper supplied by the Materiel Management
Division (MMD) to the department decreased from 7,661 boxes in FY
1999/2000 to 7,112 boxes in FY 2000/2001. As well, the percentage
of boxes of paper with recycled content increased from 17-percent
of the total boxes in FY 1999/2000 (1,285 boxes) to 99-percent in
FY 2000/2001 (7,046 boxes). In FY 2001/2002, MMD completely
discontinued the purchase of virgin paper products for supply to
its clients and has replaced it with paper with recycled content.
Electronic Forms
ELF is a user-friendly, bilingual, front-end application which
is used to design both paper and electronic forms.
ELF was developed to increase the speed and functionality of FormFlow
at the workstation and to allow users to send forms via e-mail.
ELF simplifies form completion, storage and data-sharing processes,
and also reduces repetitive tasks associated with the use of forms.
Other government departments may obtain copies of the ELF application
free of charge from PWGSC's Knowledge Exchange Service.
Media Clipping Service
PWGSC has developed Media Net - an electronic media clipping service
- to scan and categorize articles from 40 Canadian daily news sources.
The site is accessible to over 13,000 PWGSC employees through the
departmental Intranet site, The Source. The archival feature
of Media Net also reduces the need for printing articles for future
reference.
Ensemble
Ensemble is the newsletter for PWGSC employees. It is distributed
exclusively on-line, and is accessible through the departmental
Intranet site, The Source. Previous editions of the newsletter
are electronically archived, eliminating the need for printing articles
of special interest.
Objective 3.2
Develop and Deliver Environmental Training Programs for Employees
of PWGSC
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, deliver due diligence and topic-specific
training to all applicable PWGSC Real Property Services personnel.
|
Target 43-percent complete:
2,703 of 6,436 targeted employees have received appropriate
training.
|
To ensure targets are met, strategies have been developed
to encourage participation.
The target audience has been redefined for some courses,
as required, to ensure that the appropriate individuals acquire
the necessary knowledge and skills.
|
By October 31, 2003, provide green procurement training all
PWGSC personnel with internal purchasing responsibility.*
|
A green procurement course has been developed that can be
delivered in two formats: formal classroom training; and computer-based
training.
As of March 31, 2002, more than 300 purchasers had taken
green procurement training.
|
The target date has had to be extended because of the large
number of employees requiring this training. The training
requirement has been included in the department's Proposed
Learning Priorities for FY 2002/2003. The target
was modified in the Report on Plans and Priorities for
FY 2002/2003 to reflect the extended target date.
|
*This target was modified by the Report of Plans
and Priorities for FY 2002/2003. Please visit http://www.tbs-sct.gc.ca/est-pre/20022003/rGSC___e.pdf
for details.
About Environmental Training Programs for PWGSC Employees
The RPS Environmental Training Program was approved by the Real
Property Services Management Committee (RPSMC) in September 2000
and consisted of five courses:
- Environmental Liabilities and Responsibilities;
- Introduction to Environmental Assessment;
- Green Procurement;
- Indoor Air Quality; and
- the Green Buildings Workshop.
This program was developed to support the Sustainable Development
Strategy and to allow the implementation of an ISO-consistent Environmental
Management System (EMS), which includes an environmental training
component. An organized training plan for the branch is an essential
component of an EMS. Effective training is also a significant component
of Real Property Services' demonstration of due diligence in meeting
its environmental responsibilities and minimizing the potential
for liabilities.
Since the commencement of the environmental training program, a
total of 2,703 of 6,436 of targeted employees (43-percent) have
attended environmental training. This is respectable progress, given
the duration of the program over fiscal year 2001/2002. The Green
Buildings Workshop had the highest proportion trained at 99-percent,
with Indoor Air Quality at 98-percent. Green Procurement had the
lowest proportion at 25-percent; however, an on-line course has
been introduced and participation rates are expected to increase.
The remaining two courses, Environmental Responsibilities and Liabilities
and Environmental Assessment, achieved 45- and 34-percent respectively.
On average, more than half the employees still require topic-specific
environmental training. The program continues to meet its goals
and objectives.
Objective 3.3
Increase Internal Purchases of Environmentally Responsible Goods
and Services
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2002, amend the PWGSC Materiel Management Policy
to reflect the priority of green purchasing.
|
A revised draft of the policy is in the approval process.
|
Once the Policy is approved, a communications plan will
be developed.
|
About Internal Purchases of Environmentally Responsible Goods
and Services
As PWGSC's lead in procurement strategy, the Materiel Management
Division (MMD) is responsible for promoting this strategy and has
initiated such activities as:
- information sharing;
- the provision of a central information clearinghouse;
- the review and amendment of existing policies;
- the development of new policies; and,
- the sharing of best practices.
Materiel Management is also involved in researching alternative
fuel vehicles (AFVs) and promoting their acquisition.
In the 2001/2002 fiscal year, PWGSC used e-Purchasing to make $1.3
million in purchases, of which 18.7-percent were considered green.
To increase this number, MMD regularly provides input to training
courses on procurement and ensures that departmental managers are
aware of the key components of green procurement and green practices.
Objective 3.4
Green PWGSC Fleet Activities
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By March 31, 2004, increase number of Alternative Fuel Vehicles
(AFV) from 43 to 60.
|
Target exceeded.
On March 31, 2002, the PWGSC fleet included 72 AFVs.
|
No corrective action required.
|
By March 31, 2004, increase percentage of fleet-kilometres
travelled by AFV vehicles by 30-percent.
|
The actual percentage of kilometres travelled by AFVs is
not available.
|
To further increase the use of alternative fuels, the department
has added two new natural gas vehicle refuelling appliances
to the existing two units at one of its Ottawa building sites.
The vehicles can now be refuelled overnight with natural gas.
|
About Green PWGSC Fleet Activities
Once again, PWGSC has exceeded its obligations under the Alternative
Fuels Act, thereby making another significant contribution to
the reduction of harmful emissions from its vehicle fleet. For the
2001/2002 fiscal year, the department has replaced 21 of its older,
less efficient motor vehicles with new vehicles powered by cleaner
alternative transportation fuels (ATFs) such as ethanol and natural
gas.
PWGSC has also exceeded its commitment to have 60 alternative fuel
vehicles by March 31, 2004. As of March 31, 2002, the
departmental fleet included 72 vehicles powered by an alternative
fuel.
PWGSC is expected to exceed its goal to increase the percentage
of fleet-kilometres travelled by AFV vehicles by 30-percent by March
31, 2004.
Despite growing pressures, the size of the department's fleet has
remained relatively stable since April 1999 and is expected to remain
at between 285 and 300 units for the next two years.
Objective 3.5
Increase Environmental Awareness in PWGSC Employees
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
By June 30, 2001, establish baseline measures for employee
awareness of Green Citizenship objectives and techniques to
facilitate regular and ongoing progress monitoring.
|
A survey of PWGSC employees was conducted in June 2001,
establishing a baseline for employee awareness of the
objectives of the Sustainable Development Strategy (SDS),
the Green Citizenship program and the Environmental Management
System.
|
An awareness program will be developed and implemented, targeting
specific groups of employees and activities, to increase the
level of awareness of SDS and Green Citizenship initiatives,
foster an environmental ethic and maintain environmentally
responsible behaviour in the workplace and at home.
|
About PWGSC Employee Environmental Awareness
The Public Works and Government Services Canada (PWGSC) Green Citizenship
program, initiated in 1998, encourages departmental employees to
reduce the environmental impact of their daily activities. This
includes initiatives to reduce paper consumption, purchase greener
products, and minimize waste through reduction, reuse and recycling.
In preparation for further development of the Green Citizenship
program, and in keeping with the employee awareness commitment
made in the PWGSC Sustainable Development Strategy 2000, PWGSC completed
a telephone survey of its personnel across the country in June 2001.
The specific objectives of this survey were to measure employee
awareness of, perception of, and participation in the Green Citizenship
program and other environmental initiatives at PWGSC.
According to the survey, perceptions of the program were quite
positive. The results indicated that:
- 95-percent of respondents believed that PWGSC should take a
leadership role among federal departments in greening its operations
and services;
- 87-percent of respondents thought that PWGSC's environmental
initiatives add to the pride of being a PWGSC employee; and
- 77-percent of respondents indicated that, because of PWGSC's
environmental initiatives, they were more likely to green their
activities at home as well as at work.
With regard to awareness of PWGSC's Green Citizenship program,
Sustainable Development Strategy (SDS), Environmental Management
System (EMS), and e-Purchasing system:
- 59-percent of respondents felt they understand how these initiatives
may affect, or be affected by, their work;
- 20- to 30-percent of respondents were "not at all familiar"
with the various initiatives; and
- 7- to 11-percent of respondents were "very familiar"
with the various initiatives.
The environmental behaviour results provided valuable information
that can facilitate the improvement and promotion of current programs
and the development of new initiatives. According to the survey:
- 84-percent of respondents indicated they always turn
off their computers and other electrically powered equipment at
the end of the workday;
- 90-percent of respondents indicated they recycle or reuse waste/surplus
materials 75- to 100-percent of the time;
- 41-percent of respondents who make purchases take environmental
considerations into account 75- to 100-percent of the time;
- 13-percent of respondents who make purchases used the e-Purchasing
system 75- to 100-percent of the time;
- 40-percent of respondents indicated that they always
use public transportation or alternative means of transport (e.g.,
walking, bicycling, telecommuting, etc.) for commuting to and
from work, but 37-percent indicated that they never do;
and
- 36-percent of respondents indicated their behaviour was "greener"
at home than at work, mainly due to greater personal control and
convenience at home.
The results of the survey will be used:
- to develop and implement a targeted employee environmental awareness
program;
- to increase the level of awareness of SDS and Green Citizenship
initiatives; and,
- to foster and maintain an environmental ethic at PWGSC, encouraging
environmentally responsible behaviour in the workplace and at
home.
The PWGSC Green Citizenship Network
The PWGSC Green Citizenship Network was established
in 1998, based on a commitment made in PWGSC's first Sustainable
Development Strategy. Its mandate is to help create an organization
of environmentally responsible employees and citizens.
The Network has also established four main
objectives:
- to act as catalysts at national and local
levels to encourage green practices in the workplace;
- to foster cultural change in the workplace
that reflects environmental awareness;
- to gather and share ideas and best practices
internally and externally, e.g., with other government departments
(OGDs), industry, etc.; and,
- to establish measurable performance indicators
for green practices in the workplace.
There are three levels of the Green Citizenship
Volunteer Network: the Steering Committee and Support Team;
the Departmental Network; and the Local Networks, or "Green
Teams".
Green Citizenship Champion, Steering
Committee and Support Team
The Green Citizenship Champion, a Assistant
Deputy Minister, assumes the role of Champion during Environment
Week, for a term of one year,. He or she promotes the
program's aims and activities among senior management. The
Steering Committee and Support Team are made up of organizations
which provide the secretariat role for the Departmental Network
and those who advise the Network on communications and various
environmental issues.
Each year the Steering Committee and the
Support Team are responsible for organizing Environment Week
activities at PWGSC Headquarters in the National Capital Region,
producing quarterly and annual reports on Green Citizenship
activities, and ensuring the progress of Green Citizenship
by holding regular meetings.
Departmental Network
The Departmental Network is comprised of
a representative from each PWGSC branch, Special Operating
Agency (SOA) and region. The meetings of the Departmental
Network have taken place on a quarterly basis since June 1998.
These meetings facilitate information exchange, allow progress
to be tracked, and allow the network to make decisions on
future initiatives and directions of Green Citizenship.
For the past year the Departmental Network
has:
- learned about products and services available
from various areas of PWGSC, including Buildings On-Line,
the Digital Simulation Laboratory, e-Purchasing, and Green
Procurement;
- endorsed a number of initiatives, including
the new PWGSC Green Move Protocol; a new initiative which
includes giving points for driving Alternative Fuel Vehicles
when allocating departmental parking passes; and the use
of the Enterprise Documents and Records Management (EDRM),
an electronic records management system;
- made Green Citizenship information available
to employees on the departmental intranet site; and
- developed contacts with the City of Ottawa
- specifically, the waste management department. These communications
are presently leading to joint projects and knowledge exchange.
Local Networks or "Green Teams"
Local Green Citizenship Networks are made
up of volunteer PWGSC employees and are coordinated by the
branch, SOA and regional representatives who attend the Departmental
Network meetings. Meetings of the Local Networks act as information
exchanges, where individuals bring forth ideas, and where
action plans and proposals are fleshed out. For the past year,
Local Green Citizenship Teams have worked hard to continue
to green their office environments. A sample of their activities
for FY 2001/2002 follows:
- Green Citizenship Action Plans were posted
on the internal PWGSC website.
- Several teams have partnered with other
organizations to pursue joint activities such as Atlantic
Region participating in tree planting at Point Pleasant
Park; Ontario Region participating in the Lung Associations
"Flight for Life" fund raiser; and Western Region
continuing their support of the Adopt-a-Highway program.
- Several local representatives have made
presentations about Green Citizenship, creating awareness
of the program and encouraging others to take part in activities.
- Vermi-composting has been made available
in many offices, thanks to Green Teams.
- Communication has been a focus for many
of the Green Teams as they promote awareness of the program
as well as individuals' initiatives.
- The Department of Foreign Affairs and International
Trade has asked the RPS National Client Service Unit (NCSU)
Green Team for assistance with the development of their
own green employee program.
- Green Citizenship is now discussed in the
PWGSC Employee Orientation Program.
- In many areas, efforts have been made to
reduce the number of hard copy telephone books ordered,
with Quebec Region reducing its order by 60-percent.
- The Translation Bureau has developed electronic
forms so that the translation request, the original document
and the translated version can all be sent electronically.
- Several Green Teams have worked with client
departments to have their Environmental Management Systems
ISO 14001-registered.
A number of Local Networks have also:
- collected and reused one-side-used paper;
- ensured that office supplies are purchased
on-line through e-Purchasing;
- ensured that employees are aware of and
use the Green Leaf rating for hotels;
- participated and organized Environment
Week events; and,
- ensured that communication efforts, such
as the e-mailed "Green Tip of the Week", are kept
up to date.
|
Objective 3.6
Encourage Green Travel within PWGSC
Targets
|
Performance
|
Corrective / Additional Measures
(if applicable)
|
To encourage employees travelling on official business to
stay in hotels with high Green Leaf ratings.
|
Organizations within the department have pursued this initiative
in various ways. Reporting to senior management on this target
has contributed to the awareness of this commitment.
|
An awareness program and a departmental policy will be developed
to encourage employees to choose environmentally responsible
hotels when travelling on official business.
|
About Green Travel within PWGSC
Development of the capacity to sort hotels by their Green Leaf
rating (where applicable) within the electronic Accommodation
Directory for Government Employees, has facilitated the take-up
of this target. That capacity was achieved through the implementation
of Objective 2.6 of the PWGSC SDS 2000, as discussed previously.
Departmental organizations have made their employees aware of the
initiative in a number of ways.
A department-wide awareness program encouraging employees to choose
Green Leaf hotels is expected to include:
- sending e-mails to frequent travellers to remind them of the
commitment;
- organizing awareness/information sessions for employees;
- issuing reminders through the Green Citizenship Network; and
- reminding employees and supervisors of this commitment when
official travel is authorized so that they can make the appropriate
reservations.
In addition, the department intends to develop and issue a departmental
policy on the subject.
Footnotes
[5]This target was modified in the Departmental Performance Report for FY 2001/2002.
Please visit http://www.tbs-sct.gc.ca/rma/dpr/01-02/PWGSC/PWGSC0102dpr03_e.asp for details.
|