![]() |
![]() |
![]() |
![]() |
![]() |
Français | ![]() |
Contact Us | ![]() |
Help | ![]() |
Search | ![]() |
Canada Site | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Home | ![]() |
Site Map | ![]() |
What's New | ![]() |
About Us | ![]() |
Registration |
![]() |
![]() ![]() ![]() ![]() |
||||||||||||||||||||||||||||||||||||||||
|
![]() |
S-A-01-G:2002 - Section 4.1 to 4.4 [revised 2005-01-10]4. Quality System Requirements 4.1 Management Responsibility
A formal assessment would identify responsibilities that may conflict, and state how this possible conflict will be resolved. Responsibility or duty changes to the position of the management representative would prompt a new assessment following the above mentioned criteria. 4.1.3 Management Review No guidance provided. 4.2 Quality System 4.2.1 General The scope of S-A-01:2002 could expand as devices receive approval from Measurement Canada and new technologies are developed. Guidance applicable to Electricity and Gas Section 1.2.2 of S-A-01:2002 standard has been expanded to include domestic and larger capacity ultrasonic meters. Some points to note:
Guidance applicable to Weights and Measures An accredited organization is not required to list the makes and models of devices in its quality management system documentation manual. However, the device manufacturer’s name, device model number and Measurement Canada Notice of Approval number are required to appear on the test report form that must be completed when an inspection is performed and a certificate is issued. 4.2.2 Quality System Procedures Determining full compliance to this requirement is a two step process: documentation review and on-site audit. Program documentation (program procedures) submitted to Measurement Canada for documentation review should demonstrate a commitment to meeting the S-A-01 requirements. Technical procedures should reference the forms that are completed in the process. Evidence that the procedures are effective in meeting requirements is usually confirmed at the time of audit. 4.2.3 Quality Planning No guidance provided. 4.3 Contract Review 4.3.1 General No guidance provided. 4.3.2 Review No guidance provided. 4.3.3 Amendment to a Contract No guidance provided. 4.3.4 Records No guidance provided. 4.4 Design Control No guidance provided.
|
![]() |
![]() |
|||
Created: 2004-06-04 Updated: 2005-01-07 ![]() |
![]() Top of Page ![]() |
Important Notices
![]() |