Measurement Canada  Canada wordmark
Skip first menu (access key: 1) Menu (access key: M)
 Français  Contact Us  Help  Search  Canada Site
Home  Site Map  What's New  About Us  Registration
Go to the 
Strategis home page Measurement Canada Authorized Service Providers Accreditation Accreditation Standard Guide
What's New
Services
Authorized Service Providers
Accreditation
Accreditation Program Description
Accreditation Standard (S-A-01: 2002)
Accreditation Standard Guide
Bulletins
Communiques
Weights and Measures Inspection Certificate Completion Manual
Documents for Consultation
Accreditation Program Directory
List of Accredited Service Providers
Registration
List of Registered Service Providers
Delegation of Authorities
List of Organizations with Delegated Authorities
Training
Mass
Approvals
Electricity
Natural Gas
Consumer Page
Volume
Sector Review
CFTM
About Measurement Canada
Site Map
Marketplace Monitoring
Information for Job Seekers

  Measurement Canada
 Services   CFTM   Approvals   Electricity   Volume
 Sector Review   Authorized Service
 Providers
  Consumer Page   Natural Gas   Mass
Previous   Home   Next


S-A-01-G:2002 - Section 4.1 to 4.4 [revised 2005-01-10]


4. Quality System Requirements

4.1 Management Responsibility

No guidance provided

4.1.1 Quality Policy

No guidance provided.

4.1.2 Organization

No guidance provided.

4.1.2.1 Responsibility and Authority

No guidance provided.

4.1.2.2 Resources

No guidance provided.

4.1.2.3 Management Representative

For the purposes of obtaining Measurement Canada accreditation, the management representative is also
responsible for ensuring that the organization:

  • continues to comply with the requirements of the applicable act and its associated regulations, policies, procedures and programs; including implementing any amendments that may occur; and
  • liaising with Measurement Canada on matters relating to the accreditation of the organization and its quality system.

A formal assessment would identify responsibilities that may conflict, and state how this possible conflict will be resolved. Responsibility or duty changes to the position of the management representative would prompt a new assessment following the above mentioned criteria.

4.1.3 Management Review

No guidance provided.

4.2 Quality System

4.2.1 General

The scope of S-A-01:2002 could expand as devices receive approval from Measurement Canada and
new technologies are developed.

Guidance applicable to Electricity and Gas

Section 1.2.2 of S-A-01:2002 standard has been expanded to include domestic and
larger capacity ultrasonic meters. Some points to note:
  • some ultrasonic gas meters are fully approved;
  • verification specifications are contained in PS-G-06 (rev 1) which was specifically developed to address domestic ultrasonic gas meters.

Guidance applicable to Weights and Measures

An accredited organization is not required to list the makes and models of devices in its quality management system documentation manual. However, the device manufacturer’s name, device model number and Measurement Canada Notice of Approval number are required to appear on the test report form that must be completed when an inspection is performed and a certificate is issued.

4.2.2 Quality System Procedures

Determining full compliance to this requirement is a two step process: documentation review and on-site audit. Program documentation (program procedures) submitted to Measurement Canada for documentation review should demonstrate a commitment to meeting the S-A-01 requirements. Technical procedures should reference the forms that are completed in the process. Evidence that the procedures are effective in meeting requirements is usually confirmed at the time of audit.

4.2.3 Quality Planning

No guidance provided.

4.3 Contract Review

4.3.1 General

No guidance provided.

4.3.2 Review

No guidance provided.

4.3.3 Amendment to a Contract

No guidance provided.

4.3.4 Records

No guidance provided.

4.4 Design Control

No guidance provided.
Previous   Home   Next


    Created: 2004-06-04
Updated: 2005-01-07
Top of Page
Top of Page
Top of Page
Important Notices