Paving |
Laying
of hot bituminous mix with a paving machine on the highway surface.
Short delays in travel to be expected. |
Grading |
Complete
reconstruction of highway. Detours, delays and possible highway
closure. |
Surfacing |
Maintenance
or construction activity on the highway surface. Short delays
in travel to be expected. |
Seal
Coating |
Applying
hot liquid asphalt to the highway surface then covering with
a graded aggregate to produce a waterproof membrane to the highway
surface. Expect delays, dusty conditions, reduced visibility,
loose and flying stones and fresh oil. Avoid these construction
zones when possible to reduce vehicle damage caused by other
vehicles failing to reduce speed limits. |
Graveling |
Placing
additional gravel on our graveled highways, primarily located
in northern Saskatchewan. |
Under
Construction |
A
variety of smaller maintenance or construction projects. Expect
minor delays. |
Impassable |
Road
Closed - use alternate route. |
Local
Detour |
Short
Detour around construction site. |
Washouts |
Road
closed due to washouts from flooding or heavy rain . |
Bridge
Repair |
Bridge
is under repair, usually one lane traffic with restricted widths. |
Water
over Road |
Water
is running over the highway. The areas will be controlled by
flagpersons. Traffic is allowed through when conditions are
safe. |
Flooded |
Highway
closed - under water. |
Fires
in Area |
Highway
may be closed without notice - visibility may be reduced by
smoke. |
Reduced
Speed |
Recommended
reduced speeds due to road condition. |
Surface
Breaks |
Breaks
in the pavement or potholes. Most common during spring thaw
period. Known failures will be marked. |
Rough |
Driving
surface may be rough from construction activities, surface breaks
or on gravel highways following extreme weather conditions. |
Slippery |
Usually
associated with gravel highways following heavy rains. |
Heavy,
Rutted |
Usually
associated with gravel highways or new construction following
heavy rains. Travel not recommended. |
Towing
Traffic |
Heavy
rains due to new construction can make road impassable to normal
traffic. Vehicles must be towed through. Alternate route recommended. |
Windrows |
Windrows
of gravel material on highway during construction. |
Sharp
Drop Off |
The
shoulder has been cut away during construction leaving a sharp
drop. |
Flag
Person
![](/web/20070103211219im_/http://www.highways.gov.sk.ca/docs/travelers_info/images/road_construction.jpg) |
Flag
person - the workers who carry these signs provide traffic control
in the construction zone. You must always obey the signals from
the flag person. |
Pilot
Vehicle |
Traffic
must be piloted through the construction zone. Expect delays
of 5-15 minutes. |