Comprehensive Study List Regulations
|
Paragraph 18 (i):
The proposed construction, decommissioning or abandonment, or an expansion that would result in an increase in production capacity of more than 35 per cent, of a stone quarry or gravel or sand pit with a production capacity of 1 000 000 t/a or more
Paragraph 28 (c):
The proposed construction, decommissioning or abandonment of a marine terminal designed to handle vessels larger than 25 000 DWT unless the terminal is located on lands that are routinely and have been historically used as a marine terminal or that are designated for such use in a land-use plan that has been the subject of public consultation
|