Pipeline 2000
|
![Heading Graphic](/web/20071116150959im_/http://www.tsb.gc.ca/images/heading.gif)
|
![Horizontal Line](/web/20071116150959im_/http://www.tsb.gc.ca/images/h_line450x1.gif) |
These documents are the final versions of occurrence investigation reports as approved by the Transportation Safety Board. The TSB assumes no
responsibility for any discrepancies that may have been transmitted with the electronic versions. The printed versions of the documents stand as the
official record.
2000 Pipeline Investigation Reports
28 December 2000 — Natural Gas Compressor Station Occurrence
Gazoduc TQM Inc.
East Hereford Compressor Station
Kilometre Post 217,094 on Line 3000
Approximately 80 km SE of Magog, Quebec
East Hereford, Quebec
Report Number P00H0061 HTML
PDF [2,765 KB]
07 August 2000 — Natural Gas Pipeline Rupture Westcoast Energy Inc. 762-millimetre T-South Mainline, Mile Post 569.9 Near the Zopkios Rest Stop at
Exit 217 Coquihalla Highway, British Columbia
Report Number P00H0037 HTML
PDF [144 KB]
|