Pipeline Reflexions Magazine
|
![Heading Graphic](/web/20071116200356im_/http://www.tsb.gc.ca/images/heading.gif)
|
![Horizontal Line](/web/20071116200356im_/http://www.tsb.gc.ca/images/h_line450x1.gif) |
Issue 3, July 2002
TABLE OF CONTENTS
Hardness on the Pipe
Wasting Away - Again
Closed Valve Remains Undetected Until
Emergency Shut-Down Woes
River Crossing Instability
Statistics
Summaries
Investigations
Final Reports
Photos
Photo 1 - Downstream end of rupture
Photo 2 - Escaping gas ignited.
Photo 3 - Ruptured pipe on Line 100-3 near Cabri, Saskatchewan.
Photo 4 - Ruptured pipeline
Photo 5 - TCPL Compressor Station 30
Photo 6 - Ruptured Lines 100-3 and 100-4
Photo 7 - Fragment landing site with La Salle River in the background
Photo 8 - Second fragment retrieved from river bottom
Photo 9 - Tapping connection
Photo 10 - Failed nipple
|