Transportation Safety Board of Canada / Bureau de la sécurité des transports du Canada

Pipeline 2000

Heading Graphic

Horizontal Line

These documents are the final versions of occurrence investigation reports as approved by the Transportation Safety Board. The TSB assumes no responsibility for any discrepancies that may have been transmitted with the electronic versions. The printed versions of the documents stand as the official record.

2000 Pipeline Investigation Reports

28 December 2000 — Natural Gas Compressor Station Occurrence Gazoduc TQM Inc. East Hereford Compressor Station Kilometre Post 217,094 on Line 3000 Approximately 80 km SE of Magog, Quebec East Hereford, Quebec
Report Number P00H0061   HTML   PDF [2,765 KB]

07 August 2000 — Natural Gas Pipeline Rupture Westcoast Energy Inc. 762-millimetre T-South Mainline, Mile Post 569.9 Near the Zopkios Rest Stop at Exit 217 Coquihalla Highway, British Columbia
Report Number P00H0037   HTML   PDF [144 KB]

Horizontal Line

http://www.tsb.gc.ca/en/reports/pipe/2000/index.asp