The Navigable Waters Protection Act:
Pipeline Crossings - Brochure
This brochure outlines the specific standards and criteria under which Transport
Canada considers pipeline crossings as a “minor work” and does
not require an application under the Navigable
Waters Protection Act (NWPA).
The NWPA is a federal law designed to protect the public right of navigation.
It ensures that works constructed in navigable waterways are reviewed and regulated
to minimize the overall impact on navigation.
The Act includes provisions for the removal of unauthorized works or obstructions
that render navigation difficult enough to be considered dangerous.
A Minor Work ^
Historically, many projects pose no threat to the ongoing safety of navigation
if positioned and constructed in accordance with specific known standards and
criteria. Such projects are considered by Transport Canada as a minor work
and, as such, no application under the NWPA is required.
Failure to construct the work in accordance with the standards and criteria
identified in this document may result in enforcement action.
Definitions ^
Soffit: the lowest elevation of the under-surface of a bridge.
Pipeline: long underground pipe conveying gas, liquids (including
but not limited to oil, water or effluent) or cables (including but not limited
to hydro or communications).
When is a pipeline crossing not considered a minor
work? ^
A pipeline crossing project meeting any of the following criteria and standards requires the
submission of an application for review and approval under the Navigable
Waters Protection Act (NWPA):
- Where the proposed pipeline:
- is regulated by the National Energy Board (NEB);
- is located on a charted waterway;
- is suspended across or over navigable waters;
- requires the placement of temporary bridges or temporary cables not
lying on the bed, to facilitate the construction, testing, alteration
or repair of a pipeline;
- if affixed to an existing bridge, reduces the existing vertical or
horizontal navigation clearances; or
- If the width of the waterway at the crossing location exceeds 50m.
When is a pipeline crossing considered a minor work? ^
A pipeline crossing project meeting the following criteria is considered a
minor work under this policy and does not require an application
under the NWPA and the project may proceed:
- The pipeline crossing must be buried beneath the bed of the waterway.
Procedures during construction ^
For pipeline crossings determined under this criteria to be a minor work,
the following procedures shall be strictly adhered to during construction:
- Temporary "Warning – Pipeline Construction Ahead" signs
must be placed upstream and downstream of the construction site in accordance
with the minimum distances outlined in the table below:
Width of Waterway
(metres) |
Minimum Distances
(metres) |
<10m |
25m |
10m-20m |
50m |
20m-50m |
100m |
- the warning signs must be posted during all periods
of instream activity;
- the warning signs must be legible at a minimum distance of 50m; and
- directionally-drilled pipelines are excluded from the signage requirements;
- Navigation shall be allowed safe access through the construction site at
all times, and assisted, if necessary;
- The bed of the waterway shall be restored to its natural contours immediately
upon completion of the pipeline crossing; and
- Instream temporary works (excluding bridges and cables required to facilitate
the construction of the pipeline) shall be:
- marked with yellow flashing lights from dusk to dawn, or during periods
of restricted visibility; and
- completely removed upon completion of the project.
NOTE ^
Strict adherence to this policy is mandatory. In addition, other situations
may arise that prevent the application of this policy to a specific pipeline
crossing project.
You should be aware that other laws and regulations may be applicable to your
pipeline crossing project.
If you require further information or clarification, please contact the Navigable
Waters Protection Program Office in your area or consult Transport Canada’s
website at: http://www.tc.gc.ca/marinesafety/oep/nwpp/menu.htm.
|