Incinerator, Mississauga Metals & Alloys Inc
Brampton (ON)
September 14, 2005 (Update) --
The Canadian Nuclear Safety Commission will conduct a screening commencing on June 25, 2004 of the project:
Incinerator, Mississauga Metals & Alloys Inc.
The installation and operation of an incinerator in an existing building; the construction or modification of the existing building and the supporting systems (i.e. mechanical/electrical); the continued operation of recycling metals that are potentially contaminated with radioactive material; the possession of low-level waste (including Category 3 material); and the treatment of the pickling solution by using a filter press.
Under section 5 of the Canadian Environmental Assessment Act, an EA is required for this project because the Canadian Nuclear Safety Commission may issue a permit or license under subsection 24(2) of the Nuclear Safety and Control Act.
For further information on this environmental assessment, please contact:
Michael Rinker Environmental Assessment Specialist Processing Facilities and Technical Support Division Telephone: (613) 995-7413 Email: ceaainfo@cnsc-ccsn.gc.ca and refer to CEAR reference number 04-01-4079
|