Measurement Canada  Canada wordmark
Skip first menu (access key: 1) Menu (access key: M)
 Français  Contact Us  Help  Search  Canada Site
Home  Site Map  What's New  About Us  Registration
Go to the 
Strategis home page Measurement Canada Approvals Approval Process
What's New
Services
Authorized Service Providers
Mass
Approvals
Notice of Approval Database
About Notice of Approval
Approval Process
Approval Services Laboratory
Approval Forms
Directory of Technical Coordinators
Canada/United States Mutual Recognition of Type Evaluation Program
Electricity
Natural Gas
Consumer Page
Volume
Sector Review
CFTM
About Measurement Canada
Site Map
Marketplace Monitoring
Information for Job Seekers

  Measurement Canada
 Services   CFTM   Approvals   Electricity   Volume
 Sector Review   Authorized Service
 Providers
  Consumer Page   Natural Gas   Mass

Approval Process


How does one obtain an approval?
How does the approval process work?
How long does it take to obtain an approval?
How can I assist in speeding up my approval project?
May I send a sample device along with my application for approval?


How does one obtain an approval?
Approval begins by submitting an
"Application for Approval". When applying for an approval, use the form applicable to your device.

How does the approval process work?
Once an application for approval is received, the Approval Technical Coordinator assesses whether all of the necessary information has been submitted and requests any additional information which may be needed.

When all of the required information is received, the Approval Technical Coordinator selects the sample(s) to be submitted for evaluation and, if not submitted with the application, requests that it (they) be sent to the Approval Services Laboratory (ASL).

Once the sample(s) are received, the project file is placed in a queue of projects-in-waiting. The queue is administered on a first-in first-out basis. (In order to minimize storage requirements, large sample devices may be requested only when the testing is imminent.)

Examination and testing starts when an Approval Examiner becomes available. Typically, an examiner is assigned to work on multiple projects concurrently, with each project at a different stage of processing.

Note: For those devices requiring assistance for testing, the applicant is notified ahead of time so that travel arrangements can be made.

    • As the testing and evaluation work proceeds, the examiner will identify all of the noncompliances found, notify the applicant of their nature and provide the applicant with a set time frame (normally 30 to 60 days) within which to resolve them. However, in some cases, the nature of the noncompliance uncovered is such that the Approval Examiner may recommend that testing be stopped.
    • Once the device is found to comply with all the applicable requirements, the examiner drafts a Notice of Approval (NOA.
    • The draft NOA is sent to the applicant for review and comments.
    • The NOA is finalized, signed, distributed to interested parties and published on Measurement Canada's Internet site. Only then can the device be submitted to an "initial verification" prior to its use in trade.

How long does it take to obtain an approval?
The time required to obtain an approval varies considerably with each project and depends upon a number of factors including the type and complexity of the measurement device, the number of noncompliances which must be corrected and the current workload in the Approval Services Laboratory.


Overall, our targeted average turnaround time for all approval projects exempt of noncompliance is ninety calendar days or less from the receipt of the device for testing to the issuance of the Notice of Approval. While some approval projects take as few as four weeks to process, other more complex projects necessitate much more time. It is best to contact the Approval Technical Coordinator in the discipline of interest (i.e., mass, fluids, electricity) to obtain an estimate of the time required.

How can I assist in speeding up my approval project?
There is much that an applicant can do to minimize the time it takes to process an approval project:
    • taking into account the metrological requirements to which the device must comply when designing it;
    • testing the device thoroughly and eliminating all noncompliances before applying for approval;
    • providing all the necessary information in the format required when submitting the application form, or soon thereafter;
    • providing a complete and working sample of the model(s), size(s) and capacity(ies) specifically requested by the Approval Services Laboratory (ASL) -- the sample(s) should require little or no assembly prior to testing;
    • sending a technician, when requested by the laboratory, to set up and operate the device in the laboratory at the time of evaluation;
    • responding quickly to queries from the Approvals Examiner and promptly correcting the noncompliance(s) identified.

May I send a sample device along with my application for approval?
Yes. The applicant may submit a sample at this time. However, in some instances, it is preferable to wait for instructions from the Approval Services Laboratory (ASL).


If the device for which approval is sought has several models with different capacities, characteristics and features, the Approval Technical Coordinator will indicate which model(s) must be shipped and when the laboratory can receive the shipment.

    Created: 2003-07-08
Updated: 2004-01-30
Top of Page
Top of Page
Top of Page
Important Notices