Synopsis
The following revisions are included in Version 07-1 dated 25 May 2007.
Section 1 Standard Instructions and Conditions
- 2003, Standard Instructions
- 2006, Standard Instructions - Request for Standing Offers
-
Text revised to add a section on joint venture, to define "Canadian-based bidders/offerors" and "foreign-based bidders/offerors", and to update the information throughout the document. Reviewed and approved by the SACC Manual Review Project Team.
- 9403, Standard Instructions and Conditions
- 9403-5, Professional and Research and Development Services
-
CANCELLED - superseded by standard instructions 2003. Reviewed and approved by the SACC Manual Review Project Team. This replaces PN-83.
Section 2 Templates and Forms
- 2-Int, Forms
-
Text revised to add three new Real Property Contracting Directorate forms: PWGSC-TPSGC 504; PWGSC-TPSGC 505, and PWGSC-TPSGC 506.
- 2T-HIGH1, Higher Complexity Bid Solicitation and Resulting Contract Template - Goods, Services or Both
-
NEW - to be used for the procurement of higher complexity competitive and non-competitive requirements for goods, services or both (excluding construction and architectural and engineering requirements). Reviewed and approved by the SACC Manual Review Project Team. This replaces PN-83.
- 2T-LDV1, Low Dollar Value Bid Solicitation and Resulting Contract Template - Goods, Services or Both
-
Title revised. Text revised to update the information for low dollar value competitive and non-competitive requirements for goods, services or both. Reviewed and approved by the SACC Manual Review Project Team. Reviewed and approved by the SACC Manual Review Project Team.
- 2T-MED1, Medium Complexity Bid Solicitation and Resulting Contract Template - Goods, Services or Both
-
Title revised. Text revised to update the information for medium complexity competitive and non-competitive requirements, for goods, services or both. Reviewed and approved by the SACC Manual Review Project Team.
- 2T-PROC1, Procedures for Using the Departmental Standard Procurement Templates
-
Title revised. Text revised to add information related to the higher complexity template and to update the information throughout the document. Reviewed and approved by the SACC Manual Review Project Team. This replaces PN-83.
- 2T-PROC2, Procedures for Using the Request for Standing Offers Template - Goods, Services or Both
-
Title revised. Text revised to update the information throughout the document. Reviewed and approved by the SACC Manual Review Project Team.
- 2T-RFSO1, Request for Standing Offers Template - Goods, Services or Both
-
Title revised. Text revised to update the template information for the use of requests for standing offfers, for competitive and non-competitive requirements, for goods, services or both. Reviewed and approved by the SACC Manual Review Project Team.
Section 3 General Conditions
- 1026A, Supplies - Firm Price
- 1026B, Supplies - Cost Reimbursement
-
Text revised to add new sections; and to revise the information in the section 01. This replaces PN-83.
- 2005, General Conditions - Standing Offers - Goods or Services
-
Text revised to update the information in sections 01 and 04, and make minor editorial changes throughout the document. Reviewed and approved by the SACC Manual Review Project Team.
- 2010, General Conditions - Goods or Services (Medium Complexity)
- 2029, General Conditions - Goods or Services (Low Dollar Value)
-
Text revised to add new section "Condition of Materiel", to update the information in the sections "Interpretation" and "Compliance with Applicable Laws", and to make minor editorial changes throughout the document. Reviewed and approved by the SACC Manual Review Project Team.
- 9601, General Conditions - Long Form
- 9624, General Conditions - Research and Development
- 9676, General Conditions - Services
- TRA-95, Translation
-
Text revised to add new sections; to revise information in the sections "Interpretation" and "Compliance with Applicable Laws", and to make minor editorial changes throughout the document. Reviewed and approved by the SACC Manual Review Project Team. This replaces PN-83.
Section 5 Standard Procurement Clauses
Subsection A - Instructions to Bidders/Contractors
- A0000C, Standard Clauses and Conditions
-
Remarks revised to advise to use the clause with the general conditions, only if the low dollar value, medium complexity and higher complexity templates are not used. Text revised to delete the reference to the DPWGSC Act. Usage is now by REFERENCE. Reviewed and approved by the SACC Manual Review Project Team.
- A0000T, Standard Instructions, Clauses and Conditions
-
Remarks revised to advise to use the clause with the standard instructions 2003, only if the low dollar value, medium complexity and higher complexity templates are not used. Text revised to delete the reference to the DPWGSC Act. Reviewed and approved by the SACC Manual Review Project Team.
- A0011T, Project Schedule
- A0011C, Project Schedule
-
Remarks revised for plain language. Text revised to make minor editorial changes. Reviewed andapproved by the SACC Manual Review Project Team.
- A0012T, Communications - Solicitation Period
-
Remarks revised to advise to use the clause with standard instructions 2003, only if the low dollar value, medium complexity and higher complexity templates are not used. Text revised to delete the information which is now covered under standard instructions 2003 and to add a new paragraph. Reviewed and approved by the SACC Manual Review Project Team.
- A0017T, Public Bid Opening
-
Remarks revised to advise to use the clause when public bids opening will be held. No changes to the Text. Reviewed and approved by the SACC Manual Review Project Team.
- A0020T, Conduct of Evaluation
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- A0031T, Basis of Selection - Mandatory Criteria Only
-
Title revised. Remarks revised to advise to use the clause when the bid solicitation contains mandatory technical evaluation criteria and the basis of selection will be the responsive bid with the lowest evaluated price. Text revised to reflect the remarks and for plain language. Reviewed and approved by the SACC Manual Review Team.
- A0034T, Basis of Selection - Minimum Point Rating
-
Remarks revised to advise to use the clause when the bid solicitation contains mandatory and point rated technical evaluation criteria and the basis of selection will be the responsive bid with the lowest evaluated price. Text revised for plain language. Reviewed and approved by the SACC Manual Review Team.
- A0035T, Basis of Selection - Lowest Price per Point
-
Title revised - in French only. Remarks revised to advise to use the clause when the bid solicitation contains mandatory and point rated technical evaluation criteria and the basis of selection will be responsive bid with the lowest evaluated price per point. Text revised for plain language. Reviewed and approved by the SACC Manual Review Team.
- A0036T, Basis of Selection - Highest Rated Within Budget
-
Remarks revised to advise to use when the bid solicitation contains mandatory and point rated technical evaluation criteria and the basis of selection will be the responsive bid with the highest number of point with the evaluated price within the budget. Text revised for plain language. Reviewed and approved by the SACC Manual Review Team
- A0052T, Bid Cost
- A0053T, Supporting Documentation
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- A0054T, Bid Format and Numbering System
-
Remarks revised to advise to use the clause only if the medium and higher complexity templates are not used. Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- A0055T, Bid - Number of Copies
-
Remarks revised to advise to use the clause only if the medium complexity and higher complexity templates are not used. Text revised to make editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A0066T, Prices - Items
-
Title revised. Remarks revised to give contracting officers two choices of clauses. Text revised to advise that bidders must submit firm prices for all items or for one or multiple groups of items. Reviewed andapproved by the SACC Manual Review Project Team.
- A0067T, Pricing - Groups of Items
-
SUPERSEDED by A0066T. Reviewed and approved by the SACC Manual Review Project Team.
- A0068T, Rates - Resources
-
NEW - provides contracting officers two choices of clauses: bidders must submit firm rates for all categories of resources or for one or multiple groups of resources categories. Reviewed and approved by the SACC Manual Review Project Team.
- A0069T, Basis of Selection
-
NEW - to be used when there is no technical evaluation criteria in the bid solicitation and the basis of selection will be the responsive bid with the lowest evaluated price. Reviewed and approved by the SACC Manual Review Team.
- A0070C, Optional Goods and/or Services
-
NEW - to be used when there is an option for additional goods and/or services. Reviewed and approved by the SACC Manual Review Project Team.
- A0210T, Maximum Funding
-
Remarks and Text revised to add missing accents. Reviewed and approved by the SACC Manual Review Project Team.
- A0220T, Evaluation of Price
-
Remarks and Text revised to add missing accents and to make editorial changes. Usage is now by REFERENCE. Reviewed and approved by the SACC Manual Review Project Team.
- A0221T, Submission of Price
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- A0280T, Document Required for Bid Evaluation Purposes
-
Remarks revised to delete reference to other clauses and to the medium complexity template. No changes to the Text. Reviewed and approved by the SACC Manual Review Project Team.
- A0285T, Workers' Compensation Certification - Letter of Good Standing
-
Title revised. Remarks and Text revised to better clarify the intent of the clause which is to help protect workers in high risk industry sectors. Reviewed and approved by the SACC Manual Review Project Team.
- A0285C, Workers ' Compensation
-
NEW - to be used in conjunction with clause A0285T. Reviewed and approved by the SACC Manual Review Project Team.
- A0300T, Military Aviation Replacement Parts - Condition and Certification of Deliverables End Items
-
Remarks revised to advise to use in conjunction with D9010C. Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- A0301T, Military Aviation Replacement Parts - Substitute and Traceability
-
Remarks and Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- A0301C, Military Aviation Replacement Parts - Maintenance of Records
-
NEW - to be used to advise the contractor that it must retain, maintain and keep available for review and record of the manufacturer sufficient to constitute proof of origin. Reviewed and approved by the SACC Manual Review Project Team.
- A1022C, Project Authority
- A1024C, Contracting Authority
-
Remarks revised to advise to use the clause only if the low dollar value, medium complexity and higher complexity templates are not used. Text revised to reflect minor editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A1030C, Technical Authority
-
Remarks revised to delete reference to the low dollar value and medium complexity templates. Text revised to reflect minor editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A3005T, Status and Availability of Resources
-
Remarks revised to refer to the higher complexity template. Text revised to advise under which circumstances replacement of resources will be accepted and to make editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A3010T, Education and Experience
- A3015T, Certifications
- A3015C, Certifications
-
Remarks revised to advise to use the clause if the medium complexity and higher complexity templates are used. Text for A3010T revised for minor editorial changes. No changes to the Text of A3015C and A3015T. Reviewed and approved by the SACC Manual Review Project Team.
- A7010C, Supply Arrangement Reporting
-
Remarks and Text to provide direction to all procurement personnel on the requirement for business volume report. Reviewed and approved by the SACC Manual Review Project Team. This replaces PN-72R.
- A7012D, Warrant/Repair Service
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- A7013D, Licensing
-
CANCELLED - subject is covered in the general conditions under section "Compliance with Applicable Laws". Reviewed and approved by the SACC Manual Review Project Team.
- A7035T, List of Proposed Subcontractors
-
Remarks and Text revised to reflect minor editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A8010D, Lessor/Lessee Responsibility
-
SUPERSEDED by A8010C. Reviewed and approved by the SACC Manual Review Project Team.
- A8010C, Division of Responsibilities - Vehicles Rental
-
NEW - supersedes A8010D - to be used in contracts for the rental of vehicles. Reviewed and approved by the SACC Manual Review Project Team.
- A9000C, Ammunition Handling
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- A9006C, Defence Contract
-
Remarks revised to delete the reference to clause M0022D. No changes to the Text. Reviewed and approved by the SACC Manual Review Project Team.
- A9009C, Option to Extend the Contract
-
Remarks revised to delete the reference to the medium complexity template. No changes to the Text. Reviewed and approved by the SACC Manual Review Project Team.
- A9022C, Period of the Contract
-
Title revised. Remarks revised to delete reference to the medium complexity template. Text revised to add a third clause option. Reviewed and approved by the SACC Manual Review Project Team.
- A9033T, Financial Capability
-
Title revised. Remarks and Text revised to advise to use the clause when a financial opinion is required and to outline the financial information required. Reviewed and approved by the SACC Manual Review Project Team.
- A9040T, Mandatory Site Visit
- A9043T, Reissue of Bid Solicitation
-
Remarks and Text revised to reflect minor editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A9059D, Jurisdictions HMC Dockyard
-
SUPERSEDED by A9059C. Reviewed and approved by the SACC Manual Review Project Team.
- A9059C, Jurisdictions HMC Dockyard
-
NEW - supersedes A9059D - to be used when the contractor will be working in the CFB Esquimalt Dockyard doing ship repair and/or related work that would normally be done by employees of the CFB Esquimalt Ship Repair Group. Reviewed and approved by the SACC Manual Review Project Team.
- A9062C, Site Regulations
-
Remarks revised to advise to use the clause when the contractor is performing the work on Canadian Forces sites across Canada; and to use A9068C when the work is performed on government sites other than Canadian Forces sites. Text revised to delete Clause 2. Reviewed and approved by the SACC Manual Review Project Team.
- A9068C, Site Regulations
-
NEW - to be used when the work is performed on government sites other than Canadian Forces sites. Reviewed and approved by the SACC Manual Review Project Team.
- A9070T, Applicable Laws
- A9070C, Applicable Laws
-
Remarks revised to advise contracting officers to use the clause only if the low dollar value, medium complexity and high complexity templates are not used; also to make a reference to the new Nunavut territory. Text revised - in French only - to make minor editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A9076T, Improvement of Requirement During Solicitation Period
-
NEW - to advise bidders that they could propose improvements to the technical requirements contained in the bid solicitation. Reviewed and approved by the SACC Manual Review Project Team.
- A9096T, Signature of Bid
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- A9097T, Substantial Information
-
Title revised. Remarks revised to advise to use the clause when bidders are to indicate where the substantial information can be found. Text revised to allow contracting officers to identify which requirements must be substantiated by the bidders. Reviewed and approved by the SACC Manual Review Project Team.
- A9100T, Vendor Performance
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- A9101T, Evaluation Team
-
Remarks revised to advise to use the clause only if medium complexity and higher complexity templates are not used. Text revised to reflect a minor editorial change. Reviewed and approved by the SACC Manual Review Project Team.
- A9109T, Procurement Business Number
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- A9110T, Land Claims Set-aside
-
Remarks and Text revised to reflect editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- A9125T, Valid Labour Agreement
- A9130T, Controlled Goods
- A9131C, Controlled Goods
-
Remarks and Text revised for plain language. Usage is now by REFERENCE. Reviewed and approved by the SACC Manual Review Project Team.
- A9140C, Priority of Documents
-
Title revised - in English only. Remarks revised to advise to use the clause only if the low dollar value, medium complexity and higher complexity are not used. Text revised to reflect editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
Subsection B - Requirements Definition
- B1000C, Materiel
-
SUPERSEDED by B1000T. Reviewed and approved by the SACC Manual Review Project Team.
- B1000T, Condition of Materiel
-
NEW - supersedes B1000C - to be used in bid solicitations when the requirement is for new materiel. Reviewed and approved by the SACC Manual Review Project Team.
- B1200D, Storage - Shelf Life
- B1201D, Shelf Life/Cure Date
-
SUPERSEDED by D2015C. Reviewed and approved by the SACC Manual Review Project Team.
- B1202D, Age Control (Elastomeric Material)
-
SUPERSEDED by B1202C. Reviewed and approved by the SACC Manual Review Project Team.
- B1202C, Age Control of Elastomeric Materials
-
NEW - supersedes B1202D - to be used for the procurement of aerospace elastomeric materials to avoid receiving time expired and improperly packaged materials. Reviewed and approved by the SACC Manual Review Project Team.
- B1203D, Shelf Life
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- B2005D, Fish - Quality Stamping
-
SUPERSEDED by B2005C. Reviewed and approved by the SACC Manual Review Project Team.
- B2005C, Fish - Quality
-
NEW - supersedes B2005D - to be used when purchasing fresh or frozen fish for human consumption. Reviewed and approved by the SACC Manual Review Project Team.
- B3003D, Grades - Meat
-
SUPERSEDED by B3003C. Reviewed and approved by the SACC Manual Review Project Team.
- B3003C, Grades of Meat
-
NEW - supersedes B3003D - to be used for the purchase of meat. Reviewed and approved by the SACC Manual Review Project Team.
- B4011T, Testing Responsibility
-
SUPERSEDED by B4011C. Reviewed and approved by the SACC Manual Review Project Team.
- B4011C, Testing and Remarking of Cylinders/Tanks
-
NEW - supersedes B4011T - to be used when compressed gases are delivered or stored in contractor's-owned cylinders. Reviewed and approved by the SACC Manual Review Project Team.
- B4014D, Proofs
- B4018C, Specifications
- B4035D, Specialized Shipping Containers
- B4037D, Aerospace Engineering Change Proposal
- B4039D, Aircraft Tire Balancing
- B4040D, Tire Age Identification
- B4044D, Year of Pack and Marking
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- B4047D, Marking - Aircraft Hose Assemblies
-
SUPERSEDED by B4047C. Reviewed and approved by the SACC Manual Review Project Team.
- B4047C, Marking of Aircraft Hose Assemblies
-
NEW - supersedes B4047D - to be used when marking of aircraft hose assemblies is required. Reviewed and approved by the SACC Manual Review Project Team.
- B6000C, Controlled Procurement Inventory
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- B6002D, Government-Owned Cylinders, Servicing of
-
CANCELLED - should be in the basis of payment. Reviewed and approved by the SACC Manual Review Project Team.
- B6010C, Transfer of Licenced Software
-
Title revised. Remarks revised to clarify the usage of the clause. Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- B6300C, Shortages, Issue Equip. Owned by Canada
- B6700C, Government Issue
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- B6800C, List of Non-consumable Equipment and Material
- B6802C, Government Property
-
Remarks revised to clarify the usage of the clause. Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- B7800D, Quantity - Minimum/Maximum
- B7802D, Quantity - Guarantee (85 percent)
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- B8044D, Mobile Repair Parties
-
SUPERSEDED by B8044C. Reviewed and approved by the SACC Manual Review Project Team.
- B8044C, Mobile Repair Parties
-
NEW - supersedes B8044D - to be used in aircraft repair and overhaul contracts when mobile repair parties will be used. Reviewed and approved by the SACC Manual Review Project Team.
- B9004D, Equipment
-
SUPERSEDED by B9011C. Reviewed and approved by the SACC Manual Review Project Team.
- B9009D, Data Collection
- B9023C, Requirement
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- B9024D, Optional Requirement
-
SUPERSEDED by A0070C. Reviewed and approved by the SACC Manual Review Project Team.
- B9025C, On-site Maintenance
-
Title revised. Remarks and Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- B9028D, Access to Canadian Facilities
-
SUPERSEDED by B9028C. Reviewed and approved by the SACC Manual Review Project Team.
- B9028C, Access to Facilities and Equipment
-
NEW - supersedes B9028D - to be used when the contractor may require access to Canada's facilities, equipment, documentation or personnel. Reviewed and approved by the SACC Manual Review Project Team.
- B9030C, Minimum Work Guarantee
-
NEW - to be used in contracts for work on an "as and when requested basis". Reviewed and approved by the SACC Manual Review Project Team.
Subsection C - Price
- C0001T, Price Certification - Foreign Suppliers
- C0002T, Price Certification - Canadian Suppliers (other than agency and resale outlets)
- C0003T, Price Certification - Canadian Suppliers
- C0004T, Price Certification - Canadian Agency and Resale Outlets
- C0006T, Price Certification - Petroleum Products
- C0008T, Price Support - Non-Competitive Bid
-
Remarks and Text revised for plain language. Usage is now by REFERENCE. Reviewed and approved by the SACC Manual Review Project Team.
- C0009T, Sole Bid - Price Support
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- C0012T, Price Certification - Canadian Universities and Colleges
-
Remarks and Text revised for plain language. Usage is now by REFERENCE. Reviewed and approved by the SACC Manual Review Project Team.
- C0100D, Discretionary Audit
-
SUPERSEDED by C0100C. Reviewed and approved by the SACC Manual Review Project Team.
- C0100C, Discretionary Audit - Commercial Goods and/or Services
-
NEW - supersedes C0100D - to be used for commercial goods and/or services valued over $50,000 whenever price certification clause C0002T, C0004T or C0006T is used. Reviewed and approved by the SACC Manual Review Project Team.
- C0102D, Discretionary Audit
-
SUPERSEDED by C0102C. Reviewed and approved by the SACC Manual Review Project Team.
- C0102C, Discretionary Audit - Canadian Universities and Colleges
-
REINSTATED (supersedes C0102D) - to be used for requirements valued at $50,000 or more, submitted to Canadian universities, affiliated institutions and colleges where a price certification was obtained. Reviewed and approved by the SACC Manual Review Project Team.
- C0209D, Proposed Basis of Payment
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- C0300D, Cost Submission
-
SUPERSEDED by C0300C. Reviewed and approved by the SACC Manual Review Project Team.
- C0300C, Cost Submission
-
NEW - supersedes C0300D - to be used in contracts with a cost-reimbursable element within the basis of payment. Reviewed and approved by the SACC Manual Review Project Team.
- C0301D, Cost Submission
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- C0306T, Proposal and Pre-award Costs
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- C0306C, Precontractual Cost
-
REINSTATED - to be used in cost reimbursable contracts. Reviewed and approved by the SACC Manual Review Project Team.
- C0401D, Pricing
-
SUPERSEDED by C0401C. Reviewed and approved by the SACC Manual Review Project Team.
- C0401C, Pricing
-
NEW - supersedes C0401D - to be used when a published price list, less a discounted percentage, will form the basis of payment. Reviewed and approved by the SACC Manual Review Project Team.
- C0402D, Pricing
- C0403D, Pricing
- C0405D, Pricing
- C0407D, Pricing
- C0408D, Pricing
- C0411D, Correction Supplement
- C0412T, Price for Evaluation
- C0413D, Pricing - Goods
- C0418D, Dry Cleaning/Fire Proofing of Drapes
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- C0419D, Contract Price - Unscheduled Work
-
SUPERSEDED by C0416D. Reviewed and approved by the SACC Manual Review Project Team.
- C0430T, Pricing Data Sheets
- C0703T, Pricing - Engineering Services
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- C0709D, Client - Time Verification
-
SUPERSEDED by C0701D. Reviewed and approved by the SACC Manual Review Project Team.
- C2800C, Priority Rating
- C2801C, Priority Rating - Canadian Contractors
-
Remarks revised to give more instructions to contracting officers on how to handle priority rating. Text revised to reflect editorial changes.
- C3015C, Exchange Rate/Payment on Delivery
- C3020C, Exchange Rate/Milestone Payment
-
Title and Remarks revised - in French only. Text revised to update the reference to the CBSA Form; and to reflect editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- C6000C, Limitation of Price
-
Title revised. Remarks and Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
Subsection D - Delivery, Inspection and Acceptance
- D0050C, End User Certificate
-
NEW - to be used in contracts with U.S. suppliers and an end user certificate may be requested due to the nature of the goods. Reviewed and approved by the SACC Manual Review Project Team.
- D2015D, Package Markings - Additional
-
SUPERSEDED by D2015C. Reviewed and approved by the SACC Manual Review Project Team.
- D2015C, Additional Package Markings
-
NEW - supersedes D2015D - to be used when DND requires additional package markings and the same markings apply to all items. Reviewed and approved by the SACC Manual Review Project Team.
- D2016C, Additional Package Markings
-
NEW - to be used when DND requires additional package markings and the markings are different for some items; and advise to use D2015C when the markings apply to all items. Reviewed and approved by the SACC Manual Review Project Team.
- D3010D, Dangerous Goods/Hazardous Products
-
SUPERSEDED by D3010C. Reviewed and approved by the SACC Manual Review Project Team.
- D3010C, Dangerous Goods/Hazardous Products
-
NEW - supersedes D3010D - to be used when dangerous goods/hazardous products must be transported during the performance of the work. Reviewed and approved by the SACC Manual Review Project Team.
- D5510D, Quality Assurance Authority
-
Text revised to reflect the addition of an e-mail address to contact the Contract Administrator at DND.
- D5620C, Release Documents - Distribution
-
Remarks revised to reflect minor editorial changes. Text revised to reflect the addition of an e-mail address to contact the Contract Administrator at DND.
Subsection G - Assurance
- G1001D, Contractor's Responsibility
-
SUPERSEDED by G1001C. Reviewed and approved by the SACC Manual Review Project Team.
- G1001C, Insurance Requirements
-
NEW - supersedes G1001D - to be used when there are specific insurance requirements in the contract. Reviewed and approved by the SACC Manual Review Project Team.
- G1005D, Contractor's Responsibility
-
SUPERSEDED by G1005C. Reviewed and approved by the SACC Manual Review Project Team.
- G1005C, Insurance
-
NEW - supersedes G1005D - to be used when there are no specific insurance requirements in the contract. Reviewed and approved by the SACC Manual Review Project Team.
- G1007T, Insurance Requirements
-
NEW - to be used when proof of insurance is required either at bid closing or upon request from the contracting officer. Reviewed and approved by the SACC Manual Review Project Team.
Subsection K - General Conditions - Modifications
- K0000D, Conditions
-
CANCELLED - subject is covered in higher complexity template 2T-HIGH1. Reviewed and approved by the SACC Manual Review Project Team.
- K0005C, Supplemental General Conditions 1029
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- K0023C, Liability
-
CANCELLED - subject is covered in the general conditions. Reviewed and approved by the SACC Manual Review Project Team.
- K0027D, Vessel Warranty - Refit and Repair
-
SUPERSEDED by K0027C. Reviewed and approved by the SACC Manual Review Project Team.
- K0027C, Vessel Warranty - Refit and Repair
-
NEW - supersedes K0027D - to be used in marine refit and repair contracts only; the clause gives more flexibility to contracting officers regarding the paint warranty period. Reviewed and approved by the SACC Manual Review Project Team.
- K0029D, Warranty
-
SUPERSEDED by K0029C. Reviewed and approved by the SACC Manual Review Project Team.
- K0029C, Warranty Period
-
NEW - supersedes K0029D - to be used when the warranty period is to be amended. Reviewed and approved by the SACC Manual Review Project Team.
- K0030D, Conduct of the Work - Supplemental General Conditions 1036
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- K2000T, Federal Contractors Program for Employment Equity - $200,000 or more
-
Remarks revised to advise to use clause M2000T for standing offers. Text revised to update the name of the Department's name and also the Website address where the form LAB 1168 can be found. Reviewed and approved by the SACC Manual Review Project Team.
- K2002T, Federal Contractors Program for Employment Equity - over $25,000 and below $200,000
-
Remarks revised to advise to use clause M2002T for standing offers. Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- K2003C, Federal Contractors Program for Employment Equity - Certification
-
SUPERSEDED by A3015C. Reviewed and approved by the SACC Manual Review Project Team.
- K2105D, International Sanctions
-
CANCELLED - subject is covered in the general conditions. Reviewed and approved by the SACCManual Review Project Team.
- K3006D, Design - Property of Canada
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
- K4000D, Canadian Content Definition
-
Remarks revised to make reference to the related "5-M" clauses for standing offers. No changes to the Text. Reviewed and approved by the SACC Manual Review Project Team.
- K4006T, Canadian Content Certification - Conditionally Limited - Multi-Items Listed in Clause
-
Remarks and Text revised to reflect editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- K9001T, Joint Venture
-
CANCELLED - subject is covered in standard instructions 2003 and 2006. Reviewed and approved by the SACC Manual Review Project Team.
- K9002D, Canadian Arsenals Limited, Certification
-
CANCELLED - obsolete since the society has been sold. Reviewed and approved by the SACC Manual Review Project Team.
- K9006C, Title to Property - Vessel
-
Title revised - in French only. Remarks and Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- K9026D, Entire Agreement
-
CANCELLED - subject is covered in the general conditions. Reviewed and approved by the SACC Manual Review Project Team.
Subsection M - Standing Offers
- M0019T, Firm Prices and/or Rates
-
Remarks and Text revised to reflect editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- M0031T, Basis of Selection - Mandatory Criteria Only
-
NEW - to be used when the request for standing offers contains mandatory technical evaluation criteria and the basis of selection will be the responsive offer with the lowest evaluated price. Reviewed and approved by the SACC Manual Review Team.
- M0034T, Basis of Selection - Minimum Point Rating
-
NEW - to be used when the request for standing offers contains mandatory and point-rated technical evaluation criteria and the basis of selection will be the responsive offer with the lowest evaluated price. Reviewed and approved by the SACC Manual Review Team.
- M0035T, Basis of Selection - Lowest Price per Point
-
NEW - to be used when the request for standing offers contains mandatory and point-rated technical evaluation criteria and the basis of selection will be the responsive offer with the lowest evaluated price per point. Reviewed and approved by the SACC Manual Review Team.
- M0066T, Prices - Items
-
NEW - to be used in requests for standing offers when the offeror must submit firm prices for all items or for one or multiple groups of items. Reviewed and approved by the SACC Manual Review Project Team.
- M0068T, Rates - Resources
-
NEW - to be used in requests for standing offers when the offeror must submit firm rates for all categoriesof resources or for one or multiple groups of resources categories. Reviewed and approved by the SACC Manual Review Project Team.
- M0069T, Basis of Selection
-
NEW - to be used when there is no technical evaluation criteria in the request for standing offer and the basis of selection will be the responsive offer with the lowest evaluated price. Reviewed and approved by the SACC Manual Review Team.
- M0220T, Evaluation of Price
-
NEW - to be used in requests for standing offers for goods when the price will be evaluated in Canadian dollars, GST or HST excluded, FOB destination and Canadian customs duties and excise taxes included. Reviewed and approved by the SACC Manual Review Project Team.
- M0280T, Document Required for Offers Evaluation Purposes
-
NEW - to be used in requests for standing offers when offerors are required to provide specific documents with their offer. Reviewed and approved by the SACC Manual Review Project Team.
- M1004T, Materiel
-
NEW - to be used in requests for standing offers when the requirement is for new materiel. Reviewed and approved by the SACC Manual Review Project Team.
- M2000T, Federal Contractors Program for Employment Equity - $200,000 or more
-
Remarks revised to advise to use clause K2000T for bid solicitations. Text revised to update the name of the Department's name and also the Website address where the form LAB 1168 can be found. Reviewed and approved by the SACC Manual Review Project Team.
- M2002T, Federal Contractors Program for Employment Equity - over $25,000 and below $200,000
-
Remarks revised to advise to use clause K2002T for bid solicitations. Text revised for plain language. Reviewed and approved by the SACC Manual Review Project Team.
- M3020T, Status and Availability of Resources
-
NEW - to be used in requests for standing offers for service requirements when specific individuals will be proposed for the work. Reviewed and approved by the SACC Manual Review Project Team.
- M3020C, Status and Availability of Resources
-
NEW - to be used in standing offers for service requirements when specific individuals are proposed for the work. Reviewed and approved by the SACC Manual Review Project Team.
- M3021T, Education and Experience
-
NEW - to be used in requests for standing offers when the education and experience of individuals will be evaluated. Reviewed and approved by the SACC Manual Review Project Team.
- M4025C, Priority of Documents
-
Text revised to reflect editorial changes. Reviewed and approved by the SACC Manual Review Project Team.
- M7010C, Standing Offer Reporting
-
Remarks and Text revised to provide new direction to all procurement personnel on the requirement for business volume report. Reviewed and approved by the SACC Manual Review Project Team. This replaces PN-72R.
- M7035T, List of Proposed Subcontractors
-
NEW - to be used in requests for standing offers if knowledge of potential subcontracts is desired before issuance of the standing offer. Reviewed and approved by the SACC Manual Review Project Team.
- M9103T, Work Force Reduction Programs
- M9104T, Work Force Reduction Programs
- M9105C, Work Force Reduction Programs
-
Remarks revised to refer to the standing offer clauses. No changes to the Text. Reviewed and approved by the SACC Manual Review Project Team.
- M9106T, Work Force Reduction Programs - Details
-
Remarks and Text revised to refer to the standing offers clauses. Reviewed and approved by the SACC Manual Review Project Team.
- M9033T, Financial Capability
-
NEW - to be used in requests for standing offers when a financial opinion is required and to outline the financial information required. Reviewed and approved by the SACC Manual Review Project Team.
- M9043T, Reissue of Request for Standing Offers
-
NEW - to be used in requests for standing offers when reissuing a request for standing offers. Reviewed and approved by the SACC Manual Review Project Team.
- M9083T, Offerors' Conference
-
NEW - to be used in requests for standing offers when an offerors' conference will be held. Reviewed and approved by the SACC Manual Review Project Team.
- M9110T, Land Claims Set-aside
-
NEW - to be used in requests for standing offers when the procurement is being set aside under the Land Claims Set-aside Policy. Reviewed and approved by the SACC Manual Review Project Team.
Subsection P - Printing
- P0010T, Note to Bidders - ITT
- P0015D, Plant Closing
- P0020D, Samples
- P0025T, Transportation Equalization Program
- P1001D, Quantity - Approximation
- P1020D, Breaks Between Forms
- P1025D, Overruns/Underruns
- P1026D, Overruns/Underruns
- P1027D, Overruns
- P1028D, Overruns
- P1029D, Underruns
- P1030D, Overruns/Underruns
- P1031D, Overruns/Underruns
- P1035D, Alterations by Author
- P1036D, Alterations by Author
- P1040D, Specifications, Change to
- P2001D, Contract Term
- P2002D, Contract Term
- P2020D, Warehousing
- P3001D, Destination/Plant
- P3006D, Delivery
- P3008D, Delivery, Periodical
- P3009D, Delivery, Phased
- P3010D, Printing Material
- P3011D, Printing Material
- P3015D, Overshipment for National Defence
- P3020D, Packaging Specs - Insert Type Folders
- P3021D, Packaging
- P3022D, Packaging
- P3023D, Packaging
- P3024D, Packaging - Customs and Excise
- P3027D, Labelling
- P3030D, Serial Numbers
- P3031D, Serial Numbers
- P3039D, Redirect Shipments - Canada Revenue Agency
- P3050D, Intermixing Documents
- P3053D, Components
- P3054D, Components
- P4001T, Access to Information
- P5005D, Invoicing
- P5006D, Invoicing
- P5010C, Invoices
- P5015C, Invoicing Instructions
-
CANCELLED - obsolete. Reviewed and approved by the SACC Manual Review Project Team.
Subsection R - Real Property Contracting
- R0001T, General Instructions to Tenderers
-
SUPERSEDED by R2710T.
- R0200C, Articles of Agreement "A"
-
CANCELLED - new R2800D series are to be used.
- R0201D, Terms of Payment "B"
-
SUPERSEDED by R2850D.
- R0202D, General Conditions "C"
-
CANCELLED - superseded by R2810D, R2820D; R2830D; R2840D; R2850D; R2860D; R2870D; R2890D and R2900D.
- R0203D, Fair Wages and Hours of Labour - Labour Conditions
-
SUPERSEDED by R2940D.
- R0204D, Insurance Conditions "E"
-
SUPERSEDED by R2910D.
- R0205D, Contract Security Conditions "F"
-
SUPERSEDED by R2890D.
- R0206D, Submission of Quotation for Contemplated Change Notices
-
SUPERSEDED by R2950D.
- R0207D, Dispute Resolution - Conditions "G"
-
CANCELLED - superseded by R2880D and R2882D.
- R0208D, Dispute Resolution - Rules for Mediation
-
SUPERSEDED by R2882D.
- R0209D, Dispute Resolution - Rules for Arbitration
-
SUPERSEDED by R2880D.
- R0210D, General Conditions - Minor Works
-
CANCELLED - obsolete.
- R0215D, International Sanctions
-
SUPERSEDED by R2810D.
- R0425D, Standard Instructions and Conditions
-
Text revised to advise that the proponents agree to be bound by the instructions, clauses and conditions.
- R1110T, General Instructions to Proponents (GI)
-
Text revised to update the information found in different sections.
- R1130T, Proposal Documents
-
Text revised - Section 1 - to replace the reference to clause R1226D by R1225D.
- R1185T, Declaration Form
-
Remarks revised to advise to use the clause in 1 Stage- 2 Phase proposals. Text revised to update the information dealing with the Federal Contractors Program.
- R1200D, Agreement
-
Text revised - Section 1 - to replace the reference to clause R1226D by R1225D.
- R1205D, General Conditions - Table of Contents
-
Text revised to delete all the dates; to add new section GC1.16 under clause R1210D; and to replace the reference to clause R1226D by R1225D.
- R1210D, GC1 - General Provisions
-
Text revised to add new section GC1.16.
- R1225D, GC4 - Intellectual Property
-
Title revised - in French only. Text revised to reflect the date in the ISO format.
- R1240D, GC7 - Taking the Services out of the Consultant's Hands, Suspension or Termination
-
Text revised - Section GC7.3 - to reflect a minor editorial change.
- R1250D, GC9 - Indemnification and Insurance
-
Remarks revised - in French only - to make a minor editorial change. Text revised to replace Section 9.2. in its entirety.
- R1320D, Language Requirements
-
Text revised to update the information.
- R1410T, General Instructions to Proponents (GI)
-
Text revised to update the information in different sections.
- R1420T, Supplementary Instructions to Proponents (SI)
-
Text revised to reflect the ISO date format, and make a minor editorial change.
- R1430T, Proposal Documents
-
Text revised - Section 1 - to replace the reference to clause R1226D by R1225D.
- R1485T, Declaration Form
-
Text revised to update the information dealing with the Federal Contractors Program.
- R1500D, Agreement
-
Remarks revised - in French only - to make a minor editorial change. Text revised - Section 1 - to replace the reference to clause R1226D by R1225D.
- R1650D, GC9 - Indemnification and Insurance
-
Text revised to replace Section 9.2 in its entirety.
- R1800D, Agreement
-
Remarks and Text revised to reflect minor editorial changes.
- R1805D, General Conditions - Open - Table of Contents
-
Text revised to delete all the dates; and to add new section GC1.16 under clause R1210D.
- R1830D, GC5 - Terms of Payment
-
Text revised - Section GC5.7 - to reflect an editorial change and the date in ISO format.
- R1890D, Agreement Particulars - Open
-
Text revised to update the table.
- R2110T, General Instructions to Tenderers - Minor Works
-
SUPERSEDED by R2410T.
- R2205D, General Instructions to Tenderers - Minor Works
-
CANCELLED - obsolete.
- R2210D, GC1 - General Provisions
-
SUPERSEDED by R2810D.
- R2220D, GC2 - Administration of the Contract
-
SUPERSEDED by R2820D.
- R2230D, GC3 - Execution of the Work
-
SUPERSEDED by R2830D.
- R2240D, GC4 - Protection, Health and Safety
-
SUPERSEDED by R2840D.
- R2250D, GC5 - Terms of Payment
-
SUPERSEDED by R2550D.
- R2260D, GC6 - Changes in the Work
-
SUPERSEDED by R2860D.
- R2270D, GC7 - Default, Suspension or Termination of Contract
-
SUPERSEDED by R2870D.
- R2280D, GC8 - Dispute Resolution
-
SUPERSEDED by R2882D.
- R2290D, GC9 - Indemnification and Insurance
-
SUPERSEDED by R2590D.
- R2310D, Tender and Acceptance Form
-
CANCELLED - obsolete.
- R2410T, General Instructions to Bidders
-
NEW - supersedes R2110T.
- R2550D, GC5 Terms of Payment
-
NEW - supersedes R2250D.
- R2590D, GC9 - Insurance
-
NEW - supersedes R2290D.
- R2710T, General Instructions to Bidders
-
NEW - supersedes R0001T.
- R2810D, GC1 - General Provisions
-
NEW - supersedes R0215D and part of R0202D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2820D, GC2 - Administration of the Contract
-
NEW - supersedes R2220D and part of R0202D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2830D, GC3 - Execution and Control of the Work
-
NEW - supersedes R2230D and part of R0202D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2840D, GC4 - Protective Measures
-
NEW - supersedes R2240D and part of R0202D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2850D, GC5 - Terms of Payment
-
NEW - supersedes R0201D and part of R0202D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2860D, GC6 - Delays and Changes in the Work
-
NEW - supersedes R2260D and part of R0202D - to be used for PWGSC contracts. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2865D, GC6 - Delays and Changes in the Work
-
NEW - supersedes part of R0202D - for optional use by other government departments. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2870D, GC7 - Default, Suspension or Termination of Contract
-
NEW - supersedes R2270D and part of R0202D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2880D, GC8 - Dispute Resolution
-
NEW - supersedes R0207D & R0209D. Mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2882D, GC8 - Dispute Resolution
-
NEW - - supersedes R0207D, R0208D and R2280D - to be used for contracts with an estimated value of $5,000,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2884D, GC8 - Dispute Resolution
-
NEW - supersedes part of R0202D - to be used for contracts with an estimated value of less than $100,000. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2890D, GC9 - Contract Security
-
NEW - supersedes R0205D - mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2900D, GC10 - Insurance
-
NEW - supersedes part of R0202D - mandated by Treasury Board Secretariat for all construction contracts with an estimated value of $100,000 or more. Reviewed and approved by Treasury Board Advisory Committee on Contracts - Construction subcommittee.
- R2910D, Insurance Terms
-
NEW - supersedes R0204D.
- R2940D, Fair Wages and Hours of Labour - Labour Conditions
-
NEW - supersedes R0203D.
- R2950D, Allowable Costs for Contract Changes Under GC6.4.1
-
NEW - supersedes R0206D.
- R4000D, Statutory Declaration
-
CANCELLED - superseded by form PWGSC-TPSGC 2835.
- R5110T, General Instructions to Bidders
-
NEW - to be used in bid solicitation for elevator modernization
Subsection Z -Canadian Commercial Corporation
- Z3000C, Priorities - United States Purchases
-
Title revised. Remarks and Text revised to give more instructions to contracting officers on how to handle priority rating.
|