Project Overview - Inlet & Outlet Control Structures
Improvements are planned for the floodway's inlet control structure south of
Winnipeg. Upgrades will include an enhanced fire protection system,
installation of additional rip-rap and other erosion control measures
to protect the embankments of the inlet structure.
The outlet control structure near Selkirk and the channel that discharges water from the floodway back into the Red River will be improved and widened. Riverbank stability and erosion protection measures north of the floodway outlet are also being investigated.
|